Paragraph 20 NotchesF2

England and Wales

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

(1)

Construction of F1...notches on an existing impoundment.

(2)

For the purposes of this paragraph, the specific conditions are—

(a)

the construction does not affect the structural integrity of the existing impoundment,

(b)

construction of the notches does not change the water level in the main river by more than 20cm upstream or downstream from the existing structure,

(c)

the existing impoundment is located on a main river with a width of no more than 5 metres measured between the top of each bank,

(d)

the construction does not adversely affect the banks or established bed of the main river, and

(e)

the notch is no more than 0.6 metre in width.

Annotations

Textual amendments

F1

Words in Sch. 3 Pt. 4 para. 20(1) omitted (7.1.2019) by virtue of The Environmental Protection (Miscellaneous Amendments) (England and Wales) Regulations 2018 (S.I. 2018/1227), regs. 2(1), 4(3)(b)

F2

Sch. 3 Pt. 4 para. 20 heading substituted (7.1.2019) by The Environmental Protection (Miscellaneous Amendments) (England and Wales) Regulations 2018 (S.I. 2018/1227), regs. 2(1), 4(3)(a)