Schedule 1
“SCHEDULE 1
CAPITAL ACTIVITIES
Articles 2(1) and 5(1)
Provision of water supplies and fencing where necessary to facilitate the reintroduction of livestock for grazing.
Management of scrub.
Works designed for the supplementary treatment of heathland or reverted heathland, including soil disturbance, the introduction ofCallunaspecies and heather management.
The creation or restoration of ponds and the restoration of pingos.
Restoration of reedbeds and sedgebeds.
Control of bracken.
The provision of feeding areas in sites located away from heathland.
The planting or coppicing of hedges.
Construction of water-penning structures.
Restoration of pine belts and lines.
The provision of rabbit-proof fencing.
Works to protect historical and archaeological features.
The provision and restoration of gates, stiles and footbridges where an agreement includes the requirements as to public access.
Stump removal and any other necessary ground-preparation on sites reverting from forest to heath.
Other works for the restoration or enhancement of wildlife habitats.”