Article 5 Rates of payment under agreement
In article 6 of the principal Order—
in paragraph (1)—
in sub-paragraph (a), for the amount “£10”, there shall be substituted the amount “£15”;
in sub-paragraph (b), for the amount “£30”, there shall be substituted the amount “£40”;
for the amount “£6”, there shall be substituted the amount “£7”;
after paragraph (1A), there shall be inserted the following paragraph:
“(1B)Where an agreement includes a requirement to add top-wiring to specified walls, the Minister shall also make payments at a rate of £1 per metre of wall to which top-wire has been added.;”
in paragraph (2)—
the words “or in Schedule 3” shall be deleted;
in the table, in the right hand column—
for the figure “80”, there shall be substituted the figure “85”;
for the figure “40”, there shall be substituted the figure “43”;
in the table—
in the left hand column, the words “Schedule 3” shall be deleted;
in the right hand column, on the corresponding line, the figure “25” shall be deleted;
for paragraph (3), there shall be substituted the following paragraph:
“(3)Where an agreement includes a conservation plan, the Minister shall also make payments in respect of the operations included in the plan, subject to a maximum of £20,000 for each agreement..”