Commission Decision of 25 March 2002 establishing the ecological criteria for the award of the Community eco-label to hard floor-coverings (notified under document number C(2002) 1174) (Text with EEA relevance) (2002/272/EC) (repealed)
EU Decision 2002/272 · Adopted 25 March 2002 · Extends to United Kingdom
Commission Decision
of 25 March 2002
establishing the ecological criteria for the award of the Community eco-label to hard floor-coverings
(notified under document number C(2002) 1174)
(Text with EEA relevance)
(2002/272/EC) (repealed)
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Annotations to the whole text
Textual amendments
Contents
- 1Article 1 Repealed
- 2Article 2 Repealed
- 3Article 3 Repealed
- 4Article 4 Repealed
- 5Article 5 Repealed
- Annex Repealed
- FRAMEWORK Repealed
- The aims of the criteria Repealed
- Assessment and verification requirements Repealed
- CRITERIA Repealed
- Raw materials extraction Repealed
- 1.1Extraction management (for natural products only) Repealed
- 1.2Extraction management (for processed products only) Repealed
- 2Raw materials selection (for all flooring products) Repealed
- 3Finishing operations (for natural products only) Repealed
- Production process (for processed products only) Repealed
- 4.1Energy consumption Repealed
- AProcess energy requirement (PER) limit Repealed
- BEnergy requirement for firing (ERF) limit Repealed
- 4.2Water use Repealed
- Emissions to air Repealed
- Agglomerated stones Repealed
- Ceramic tiles Repealed
- Clay tiles Repealed
- Terrazzo tiles and concrete paving units Repealed
- 4.4Emissions to water Repealed
- 4.5Cement Repealed
- 5Waste management Repealed
- 5.1Recovery of waste (for processed products only) Repealed
- Use phase Repealed
- 6.1Release of dangerous substances (glazed tiles only) Repealed
- 7Fitness for use Repealed
- 8Consumer information Repealed
- 9Information appearing on the ECO-label Repealed
- TECHNICAL APPENDIX Repealed
- Raw material extraction — indicators and weights definitions Repealed
- Confined waterbed Repealed
- Average flow of the surface water-bodies Repealed
- Indicator description Repealed
- I.1. Water recycling ratio Repealed
- I.2. Rehabilitation simultaneity degree Repealed
- I.3. Blocks recovery Repealed
- I.4. Natural resource appreciation Repealed
- I.5. Working conditions of operating equipment Repealed
- I.6. Air quality Repealed
- I.7. Water quality Repealed
- I.8. Noise Repealed
- I.9. Visual impact Repealed
- Weight description Repealed
- W2. Soil protection/land capability classification Repealed
- A2Raw materials selection Repealed
- A3Water recycling ratio Repealed
- A4Energy consumption calculation (PER, ERF) Repealed
- A5Emissions to air (for processed products only) Repealed
1F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The aims of the criteria
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Assessment and verification requirements
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1Extraction management (for natural products only)F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2Extraction management (for processed products only)F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2Raw materials selection (for all flooring products)F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3Finishing operations (for natural products only)F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1Energy consumptionF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
AProcess energy requirement (PER) limitF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
BEnergy requirement for firing (ERF) limitF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2Water useF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Agglomerated stones
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Ceramic tiles
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Clay tiles
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Terrazzo tiles and concrete paving units
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4Emissions to waterF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.5CementF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5Waste managementF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.1Recovery of waste (for processed products only)F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.1Release of dangerous substances (glazed tiles only)F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7Fitness for useF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8Consumer informationF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9Information appearing on the ECO-labelF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TECHNICAL APPENDIX
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Confined waterbed
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Average flow of the surface water-bodies
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I.1. Water recycling ratio
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I.2. Rehabilitation simultaneity degree
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I.3. Blocks recovery
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I.4. Natural resource appreciation
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I.5. Working conditions of operating equipment
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I.6. Air quality
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I.7. Water quality
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I.8. Noise
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I.9. Visual impact
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
W2. Soil protection/land capability classification
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A2Raw materials selectionF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A3Water recycling ratioF1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A4Energy consumption calculation (PER, ERF)F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A5Emissions to air (for processed products only)F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .