OpenLegislation

Division 2.2 OVERVIEW

United Kingdom

Original text. Later amendments are not shown.

The interoperability of the trans-European high-speed rail network depends in part on the ability of the on-board control-command equipment to work with the various trackside equipment installed upon itf1.

  1. 2.2.1INTEROPERABILITY
  2. 2.2.2CLASSES OF CONTROL-COMMAND INTERFACES BETWEEN TRACK AND TRAIN
  3. 2.2.3LEVELS OF APPLICATION
  4. 2.2.4NETWORK BORDERS

Annotations

Footnotes

f1

Assembly: because of the mobility of the on-board part, the control-command subsystem is divided in two parts: on-board assembly and trackside assembly (see Figure 1 in Annex D).