Division 6.2.1 Assessment procedures
United Kingdom
This Chapter deals with EC declaration of verification of Control-Command Subsystem. As stated in Chapter 2 the application of the Control-Command Subsystem is treated as two assemblies:
-
the On-board Assembly,
-
the Track-side Assembly.
For each assembly, an EC declaration of verification is required.
At the request of the contracting entity or its representative established in the Community the notified body carries out EC verification of an On-board or Track-side Assembly in accordance with Annex VI to Directive 96/48/EC.
The contracting entity shall draw up the EC declaration of verification for the Control-Command Assembly in accordance with Article 18(1) and Annex V of Directive 96/48/EC.
The content of the EC declaration of verification shall conform to Annex V to Directive 96/48/EC. This includes the verification of the integration of the interoperability constituents that are part of the assembly; the tables 6.1 and 6.2 define the characteristics to be verified and reference the mandatory specifications to be applied.
Some of the specifications in this TSI contain mandatory and/or optional functions. The Notified Body shall:
-
verify that all mandatory functions required to the Assembly are implemented;
-
verify that all optional functions required by the track-side or on-board specific implementation are implemented;
The Notified Body shall verify, that no additional functions, implemented in the assembly, lead to conflicts with implemented mandatory or optional functions.
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F2The EC Declaration of Verification of On-board and Track-side Assemblies, together with the Certificates of Conformity, is sufficient to ensure that a Track-side Assembly will operate with an On-board Assembly equipped with corresponding characteristics and under the conditions specified in this TSI without an additional EC Declaration of subsystem verification.
- 6.2.1.1Functional integration verification of On-board Assembly
- 6.2.1.2Functional integration verification of Track-side Assembly
- 6.2.1.3Assessment in migration phases
Annotations
Textual amendments
- F1
- F2