Commission Decision of 7 November 2006 concerning a technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high speed rail system and modifying Annex A to Decision 2006/679/EC concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system (notified under document number C(2006) 5211) (Text with EEA relevance) (2006/860/EC)
EU Decision 2006/860 · Adopted 7 November 2006 · Extends to United Kingdom
Commission Decision
of 7 November 2006
concerning a technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high speed rail system and modifying Annex A to Decision 2006/679/EC concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system
(notified under document number C(2006) 5211)
(Text with EEA relevance)
(2006/860/EC)
THE COMMISSION OF THE EUROPEAN COMMUNITIES,
Having regard to the Treaty establishing the European Community,
Having regard to Council Directive 96/48/EC of 23 July 1996 on the interoperability of the trans-European rail systemf1, and in particular Article 6(1) thereof,
Having regard to Directive 2001/16/EC of 19 March 2001 of the European Parliament and of the Council on the interoperability of the conventional rail systemf2, and in particular Article 6(1) thereof,
Whereas:
(1)
In accordance with Article 2(c) and Annex II of Directive 96/48/EC, the trans-European high speed rail system is subdivided into structural or functional subsystems, including a control and command and signalling subsystem.
(2)
Commission Decision 2002/731/ECf3 laid down the first technical specification (‘TSI’) for interoperability relating to the control-command and signalling subsystem of the trans-European High Speed rail system;
(3)
Commission Decision 2004/447/EC updated the TSI attached in annex to the Commission Decision 2002/731/EC;
(4)
It is necessary to review that first TSI in light of technical progress and experience gained from its implementation.
(5)
In accordance with article 6(1) of Directive 96/48/EC and 2001/16/EC, the AEIF, as joint representative body, had been given a mandate to review and revise that first TSI.
(6)
Commission Decision 2006/679/EC laid down the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system;
(7)
The annex A to the TSI attached to Commission Decision 2006/679/ECf4 contained erroneous references and should therefore be replaced by Annex A to the TSI attached to the present Decision;
(8)
Section 7.4.2.3 of the TSI attached to Commission Decision 2006/679/EC should be updated in order to take better account of the specific situation of 1520 mm track gauge locomotives and trains as reflected in section 7.5.2.3 of the TSI attached to the present Decision.
(9)
The draft revised TSI has been examined by the Committee set up by Directive 96/48/EC.
(10)
This TSI should apply to new or upgraded and renewed infrastructure, under certain conditions.
(11)
The first TSI concerning the ‘control-command and signalling’ sub-system came into force in 2002. Due to existing contractual commitments, new Control Command and Signalling sub-systems or interoperability constituents, or their renewal and upgrade should be subject to conformity assessment under the provisions of this first TSI. Further, the first TSI should remain applicable for the purposes of maintenance, maintenance related replacements for components of the subsystem and interoperability constituents authorised under the first TSI. Therefore, the effects of Decision 2002/731/EC should be maintained in force in relation to the maintenance of projects authorised in accordance with the TSI annexed to that Decision and to projects for a new line and for the renewal or upgrading of an existing line which are at an advanced stage of development or the subject of a contract in course of performance at the date of notification of the present Decision
(12)
In order to determine the difference in scope of applicability of the first TSI, from the new TSI which is in annex to the present Decision, Member States should notify, not later than six months after the date on which the present Decision becomes applicable, an exhaustive list of the sub-systems and interoperability constituents to which the first TSI is still applicable.
(13)
This TSI does not impose the use of specific technologies or technical solutions except where this is strictly necessary for the interoperability of the trans-European high speed rail system.
(14)
This TSI allows, for a limited period of time, for interoperability constituents to be incorporated into sub-systems without certification if certain conditions are met.
(15)
In its current version this TSI does not fully deal with all essential requirements. In accordance with Article 17 of Directive 96/48/EC technical aspects which are not covered are identified as ‘Open Points’ in Annex G of this TSI. In accordance with Article 16(3) of Directive 96/48/EC, Member States shall notify to the Commission and other Member States a list of their national technical rules relating to the ‘Open Points’ and the procedures to be used for their conformity assessment.
(16)
In relation to the specific cases described in Chapter 7 of this TSI, Member States shall notify to the Commission and other Member States the conformity assessment procedures to be used.
(17)
The TSI shall indicate the stages to be completed in order to make a gradual transition from the existing situation to the final situation in which compliance with the TSIs shall be the norm;
(18)
The latter necessitates the establishment by each Member State of a national implementation plan of the TSI;
(19)
The migration towards the Class A target system as defined in the TSI requires appropriate measures to be taken at national level in order to facilitate such a migration and particular relevance has to be given to external Specific Transmission Modules for the national legacy Class B command-and-control systems.
(20)
The provisions of this Decision are in conformity with the opinion of the Committee set up by Article 21 of Council Directive 96/48/EC,
HAS ADOPTED THIS DECISION:
Annotations to the whole text
Footnotes
- f1
- f2
-
OJ L 110, 20.4.2001, p. 1; Directive as amended by Directive 2004/50/EC (OJ L 164, 30.4.2004, p. 114).
- f3
-
OJ L 245, 12.9.2002, p. 37, Decision as amended by Commission Decision 2004/447/EC, OJ L 193, 1.6.2004, p53.
- f4
Contents
- 1Article 1
- 2Article 2
- 3Article 3
- 4Article 4
- 5Article 5
- 6Article 6
- 7Article 7
- 8Article 8
- 9Article 9
- 10Article 10
- 11Article 11
- Annex
- INTRODUCTION
- 1.1Technical scope
- 1.2Geographical scope
- 1.3Content of this TSI
- SUBSYSTEM DEFINITION AND SCOPE
- 2.1General
- 2.2Overview
- 2.2.1Interoperability
- 2.2.2Classes of Control-Command Systems
- 2.2.3Levels of Application (ERTMS/ETCS)
- 2.2.4Infrastructure Network Borders
- THE ESSENTIAL REQUIREMENTS OF THE CONTROL-COMMAND SUBSYSTEM
- 3.1General
- Specific Aspects for the Control-Command Subsystem
- 3.2.1Safety
- 3.2.2Reliability and Availability
- 3.2.3Health
- 3.2.4Environmental Protection
- 3.2.5Technical Compatibility
- Engineering Compatibility
- 3.2.5.1.1Physical Environmental Conditions
- 3.2.5.1.2Railway Internal Electromagnetic Compatibility
- 3.2.5.2Control-Command Compatibility.
- CHARACTERISATION OF THE SUBSYSTEM
- 4.1Introduction
- Functional and technical specifications of the Subsystem
- 4.2.1Control-Command safety characteristics relevant to interoperability
- 4.2.2On-board ETCS functionality
- 4.2.3Track-side ETCS functionality
- 4.2.4EIRENE functions
- 4.2.5ETCS and EIRENE air gap interfaces
- 4.2.6On-Board Interfaces Internal to Control-Command
- 4.2.6.1Interface between ETCS and STM
- 4.2.6.2GSM-R/ETCS
- 4.2.6.3Odometry
- 4.2.7Trackside Interfaces Internal to Control-Command
- 4.2.7.1Functional interface between RBCs
- 4.2.7.2Technical interface between RBCs
- 4.2.7.3GSM-R/RBC
- 4.2.7.4Eurobalise/LEU
- 4.2.7.5Euroloop/LEU
- 4.2.7.6Requirements on pre-fitting of ERTMS track side equipment
- 4.2.8Key Management
- 4.2.9ETCS-ID Management
- 4.2.10HABD (Hot axle box detector)
- 4.2.11Compatibility with Track-side Train Detection Systems
- 4.2.12Electromagnetic Compatibility
- 4.2.12.1Internal Control-Command Electromagnetic compatibility
- 4.2.12.2Electromagnetic Compatibility between Rolling Stock and Control-Command Track-side equipment
- 4.2.13ETCS DMI (Driver Machine Interface)
- 4.2.14EIRENE DMI (Driver Machine Interface)
- 4.2.15Interface to Data Recording for Regulatory Purposes
- 4.2.16Visibility of track-side Control-Command objects
- Functional and technical specifications of the interfaces to other Subsystems
- Interface to the Subsystem Traffic Operation and Management
- 4.3.1.1ERTMS/ETCS and GSM-R operating rules
- 4.3.1.2ETCS Driver Machine Interface
- 4.3.1.3EIRENE Driver Machine Interface
- 4.3.1.4Interface to data recording for regulatory purposes
- 4.3.1.5Guaranteed train braking performance and characteristics
- 4.3.1.6Isolation of On-Board ETCS functionality
- Intentionally deleted
- 4.3.1.8Hot Axle Box Detectors
- 4.3.1.9Driver Vigilance
- 4.3.1.10Use of Sanding
- 4.3.1.11Driver’s External Field of View
- 4.3.2Interface to the Subsystem Rolling Stock
- 4.3.2.1Compatibility with track-side Train Detection Systems
- 4.3.2.2Electromagnetic Compatibility between Rolling Stock and Control-Command Track-side equipment.
- 4.3.2.3Guaranteed train braking performance and characteristics
- 4.3.2.4Position of Control-Command On-board Antennae
- 4.3.2.5Physical environmental conditions
- 4.3.2.6Electromagnetic Compatibility between Rolling Stock and Control Command On-Board equipment
- 4.3.2.7Isolation of On-Board ETCS functionality
- 4.3.2.8Data Interfaces
- 4.3.2.9Hot Axle Box Detectors
- 4.3.2.10Vehicle Headlights
- 4.3.2.11Driver Vigilance
- 4.3.2.12Odometry
- 4.3.2.13Interface to data recording for regulatory purposes
- 4.3.2.14Onboard pre-fitting
- 4.3.2.15Driver’s External Field of View
- 4.3.2.16Automatic power control and particular RS requirements for long tunnels
- Interfaces to Subsystem Infrastructure
- 4.3.3.1Train Detection Systems
- 4.3.3.2Track-side Control Command Equipment
- 4.3.3.3Quality of sand used by RS
- 4.3.3.4Use of electric/magnetic brakes
- Interfaces to Subsystem Energy
- 4.3.4.1Electromagnetic Compatibility
- 4.3.4.2Automatic Power control
- 4.4Operating rules
- 4.5Maintenance rules
- 4.5.1Responsibility of manufacturer of equipment
- 4.5.2Responsibility of contracting entities
- 4.5.3Responsibility of infrastructure manager or railway undertaking
- 4.5.4Maintenance plan
- 4.6Professional competences
- 4.7Health and safety conditions
- 4.8Infrastructure and Rolling stock registers
- INTEROPERABILITY CONSTITUENTS
- 5.1Definitions
- List of interoperability constituents
- 5.2.1Basic interoperability constituents
- 5.2.2Grouping of interoperability constituents
- 5.3Constituents performances and specifications
- ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS AND VERIFICATION OF THE SUBSYSTEM
- 6.0Introduction
- Interoperability constituents
- 6.1.1Assessment procedures
- 6.1.1.1The Specific Transmission Module (STM)
- 6.1.1.2EC declaration of suitability for use
- 6.1.2Modules
- Control-Command Subsystem
- 6.2.1Assessment procedures
- 6.2.1.1Functional integration verification of On-board Assembly
- 6.2.1.2Functional integration verification of Track-side Assembly
- 6.2.1.3Assessment in migration phases
- 6.2.2Modules
- 6.2.2.1On-board Assembly
- 6.2.2.2Track-side Assembly
- 6.2.2.3Conditions for use of Modules for on-board and track side Assemblies
- 6.2.2.3.1On-Board Assembly Validation
- 6.2.2.3.2Track-side Assembly Validation
- 6.2.2.4Assessment of Maintenance
- Interoperable Constituents Not Holding an EC Declaration
- 6.3.1General
- 6.3.2The Transition Period
- The Certification of Subsystems Containing Non-Certified Interoperability Constituents during the Transition Period
- 6.3.3.1Conditions
- 6.3.3.2Notification
- 6.3.3.3Lifecycle Implementation
- 6.3.3.4Monitoring Arrangements
- IMPLEMENTATION OF THE TSI CONTROL-COMMAND
- 7.1General
- Detailed implementation criteria
- GSM-R implementation Rules
- Track-side installations:
- On-board installations:
- ETCS implementation Rules
- Track-side installations:
- Onboard installations:
- 7.2.3Additional Class-B equipment on a Class A — equipped line
- 7.2.4Upgrading or renewal of the Control-Command Track-side Assembly or parts of it
- 7.2.5Availability of Specific Transmission Modules
- 7.2.6Interfaces with class B systems
- 7.2.7National ERTMS Implementation Plans and EU Master Plan
- 7.2.8Registers of Infrastructure Repealed
- 7.2.9Rolling stock with train protection Class A and Class B equipment
- 7.2.10Registers of Rolling Stock Repealed
- 7.3Conditions under which optional functions are required
- 7.4Management of changes
- Specific Cases
- 7.5.1Introduction
- List of specific cases
- 7.5.2.1Category of each specific case is given in Annex A, Appendix 1.
- 7.5.2.2Specific case for Greece.
- 7.5.2.3Specific case for the Baltic States (for Latvia, Lithuania, Estonia CR system only).
- 7.6Transitional provisions
- ANNEX AAppendix ANNEX A
- 1TRAIN DETECTION SYSTEMS CHARACTERISTICS NECESSARY TO BE COMPATIBLE WITH ROLLING STOCK
- 2Requirements on trackside hot wheelset bearing detection (‘Hot Axle Box Detection’) Systems
- ANNEX BCLASS B
- ANNEX CLINE SPECIFIC CHARACTERISTICS AND TRAIN SPECIFIC CHARACTERISTICS TO BE PUT IN THE REGISTERS ACCORDING TO ART. 22.A OF THE DIRECTIVE 96/48/EC Repealed
- ANNEX DPRINCIPLE OF CONTROL COMMAND AND SIGNALLING STRUCTURE
- ANNEX EAppendix ANNEX E
- ANNEX FCONFORMITY ASSESSMENT PROCEDURE
- ANNEX GOPEN POINTS
- ANNEX HSYNTHESIS OF ETCS-NET CORRIDORS