OpenLegislation

Division 6.2.2.2 Track-side Assembly

United Kingdom

Original text. Later amendments are not shown.

For the verification procedure of the track-side assembly, the contracting entity or its authorised representative established within the Community may choose either

  • The unit verification procedure (Module SG), or

  • The type-examination procedure (Module SB) for the design and development phase in combination with the production quality management system procedure (Module SD)) for the production phase, or

  • The type-examination procedure (Module SB) for the design and development phase in combination with the product verification procedure (Module SF), or

  • The full quality management system with design examination procedure (Module SH2).