OpenLegislation

Division 6.2.2.3 Conditions for use of Modules for on-board and track side Assemblies

United Kingdom

Original text. Later amendments are not shown.

The Module SD (production quality management system) may only be chosen where the contracting entity contracts only with manufacturers, that operate a quality system for production, final product inspection and testing, approved and surveyed by a notified body.

The Module SH2 (full quality management system with design examination) may only be chosen where all activities contributing to the Subsystem project to be verified (design, manufacturing, assembling, installation) are subject to a quality system for design, production, final product inspection and testing, approved and surveyed by a notified body.

Independently of the selected module, the design review includes the verification that the requirements of section 4.5 (Maintenance rules) of this TSI have been respected.

Independently of the selected module, the provisions of Annex A index 47, index A1, and where relevant index A2 and index A3 shall be applied.

With reference to Chapter 4 of the Module SB (type-examination), design review is requested.

With reference to section 4.3 of the ‘Module SH2 (full quality management system with design examination), a type test is required.

With reference to

  • Section 5.2 of the Module SD (production quality management system),

  • Chapter 7 of the Module SF (product verification),

  • Chapter 4 of Module SG (unit verification),

  • Section 5.2 of Module SH2 (full quality management system with design examination), validation under full operational conditions is defined in section 6.2.2.3.1 (On-Board Assembly Validation) and section 6.2.2.3.2 (Track-side Assembly Validation).

  1. 6.2.2.3.1On-Board Assembly Validation
  2. 6.2.2.3.2Track-side Assembly Validation