Division 6.3.3.4 Monitoring Arrangements

United Kingdom

Original text. Later amendments are not shown.

During the transition period Member States shall monitor:

  • The number and type of interoperability constituents introduced on the market within their own State;

  • Ensure that, where a subsystem is presented for authorisation, reasons for non-certification of the interoperability constituent by the manufacturer are identified;

  • Notify, to the Commission and to the other Member States, the details of the non-certified IC and the reasons for non-certification.

Table 6.1

verification requirements for on-board control-command assembly

122a345
NDescriptionRemarksCC InterfaceSInterfacing TSI subsystemsCharacteristics to be assessed by reference to chapter 4 of this TSI
1SafetyThe notified body shall ensure the completeness of the safety approval process, including safety case4.2.1
2On-board ETCS functionalityThis functionality is performed by ERTMS/ETCS on-board IC4.2.2

Note:

Train integrity supervision:

In the case, where the train is configured for Level 3, the train integrity supervision function must be supported via detection equipment rolling stock-side

Interface between ERTMS/ETCS on-board and detection equipmentRST4.3.2.8
3EIRENE functionsThis functionality is performed by ERTMS/GSM-R on-board IC4.2.4
Data communication only for level 1 with radio in-fill (optional) or level 2 and level 3
4ETCS and EIRENE air gap interfacesThis functionality is performed by ERTMS/ETCS on-board and ERTMS/GSM-R on-board IC’sCC trackside assembly4.2.5
Data radio communication with the train only for level 1 with radio in-fill (optional) or level 2 and level 3
Euroloop communication is optional
5Key managementSecurity policy for key managementOPE

4.2.8

4.3.1.7

6ETCS-ID ManagementPolicy for ETCS-ID managementOPE4.2.9
7Interfaces
STMthe notified body shall verify that the integration test requirements issued by the appropriate Member State have been metERTMS/ETCS on-board and external STM IC’s4.2.6.1
ERTMS/GSM-R on-boardERTMS/ETCS on-board and ERTMS/GSM-R on-board IC’s4.2.6.2
OdometryThis interface is not relevant if equipment is delivered as grouping of constituents.ERTMS/ETCS on-board and odometry IC’sRST

4.2.6.3

4.3.2.12

ETCS DMIPart of ERTMS/ETCS on-board ICOPE4.2.13
4.3.1.2
EIRENE DMIPart of ERTMS/GSM-R on-board IC4.2.14
OPE4.3.1.3
Interface to data recording for regulatory purposesPart of Safety Information Recorder IC4.2.15
OPE4.3.1.4
RST4.3.2.13
Train braking performancesVerification of adaptation to the concerned rolling stockOPE4.3.1.5
RST4.3.2.3
isolationOPE4.3.1.6
RST4.3.2.7
Antennae installationRST4.3.2.4
Environmental conditionsVerification of correct operation off Control Command assembly in the environmental conditions. This check has to be done in the validation under full operational conditions.RST4.3.2.5
EMCVerification of correct operation off Control Command assembly in the environmental conditions. This check has to be done in the validation under full operational conditions.RST4.3.2.6
Data interfacesPart of ERTMS/ETCS and GSM-R on-board IC.RST4.3.2.8; 4.3.2.11
OPE4.3.1.9

Table 6.2

verification requirements for track-side control-command assembly

122a345
NDescriptionRemarksCC InterfacesInterfacing tsi subsystemsCharacteristics to be assessed by reference to chapter 4 of this TSI
1SafetyThe notified body shall ensure the completeness of the safety approval process, including safety case4.2.1
2Track side ETCS functionalityThis functionality is performed by RBC’s, LEU’s and Radio In-fill Units IC’s, according to the implementation4.2.3
3EIRENE functionsData communication only for level 1 with radio in-fill or level 2/34.2.4
4ETCS and EIRENE air gap interfacesThis functionality is performed by RBC’s, Radio In-fill Units, Eurobalises, Euroloop’s and GSM-R trackside equipment, according to the implementation.CC on-board assembly4.2.5
Radio communication with the train only for level 1 with radio in-fill (optional) or level 2/3
Euroloop communication is optional
5Key managementSecurity policy for key managementOPE

4.2.8

4.3.1.7

6ETCS ID ManagementPolicy for ETCS-ID managementOPE4.2.9
7HABDThe distance between HABD equipment is a national issue.OPE4.2.10
RST

4.3.1.8

4.3.2.9

8Interfaces
RBC/RBCOnly for level 2/3Between neighbouring RBC’s4.2.7.1
GSM-R tracksideOnly for level 2/3 or level 1 with radio in-fill (optional)Between RBC’s or Radio In-fill units and GSM-R trackside4.2.7.3
Eurobalise/LEUThis interface is not relevant if equipment is delivered as grouping of constituentsBetween Control-Command IC’s4.2.7.4
Euroloop/LEUEuroloop is optionalBetween Control-Command IC’s4.2.7.5
This interface is not relevant if equipment is delivered as grouping of constituents
Antennae installationIN4.3.3.1
Environmental conditionsVerification of correct operation off Control Command assembly in the environmental conditions. This check has to be done in the validation under full operational conditions.IN4.3.2.5
EMCVerification of correct operation off Control Command assembly in the environmental conditions. This check has to be done in the validation under full operational conditions.ENE4.3.4.1
9Compatibility of train detection systemsCharacteristics to be activated by rolling stockRST

4.2.11

4.3.1.10

IN4.3.2.1
10EM compatibility between rolling stock and train detection systemsRST4.2.12.2, 4.3.2.2
Compatibility with train headlightsCharacteristics of retro reflecting line-side signals and clothingRST

4.2.16

4.3.2.10

Compatibility with driver’s external field of viewInstallation of trackside equipment that must be seen by the driverOPE

4.2.16

4.3.1.11