OpenLegislation

Division (ii) Procedure for copiers, digital duplicators and MFDs without print capability

United Kingdom

Original text. Later amendments are not shown.

Table 7

TEC test procedure — Copiers, digital duplicators and MFDs without print capability

Notes:
— Before beginning the test, it is helpful to check the power-management default delay times to ensure they are as-shipped, and to confirm that there is plenty of paper in the device.
— The ‘Zero meter’ instruction may be carried out by recording the accumulated energy consumption at that time rather than literally zeroing the meter.
— Step 1 — The off measurement period can be longer if desired, to reduce measurement error. Note that the off power is not used in the calculations.
— Step 2 — If the unit has no ready indicator, use the time at which the power consumption level stabilises to the ready level.
— Step 3 — After recording the Active0 time, the remainder of this job can be cancelled.
— Step 4 — If the unit turns off within this hour, record the sleep energy and time at that point in time, but wait until a full hour has elapsed since the final sleep mode was initiated before beginning step 5. Note that the sleep power measurement is not used within the calculation, and the unit may enter auto-off within the full hour.
— Step 5 — The period of 15 minutes is from job initiation. In order to be evaluated by this test procedure, products must be able to complete the required job per the job table within the 15-minute job interval.
— Step 6 — A unit that is shipped with short default delay times might begin steps 6-8 from sleep or auto-off.
— Step 9 — If the unit has already entered auto-off before the start of step 9, then the values for final energy and final time are zero.
— Step 10 — The auto-off testing interval may be longer to improve accuracy.
StepInitial stateActionRecord (at end of step)Possible states measured
1OffPlug the unit into meter. Zero the meter; wait test period (five minutes or more).Off energyOff
Testing interval time
2OffTurn on unit. Wait until unit indicates it is in ready mode.——
3ReadyCopy a job of at least one image but no more than a single job per job table. Record time to first sheet exiting unit. Wait until the meter shows that the unit has entered its final sleep mode.Active0 time—
4SleepZero meter; wait one hour. If unit turns Off in less than one hour, record time and energy in sleep, but wait full hour before moving to step 5.Sleep energySleep
Testing interval time
5SleepZero meter and timer. Copy one job per job table. Record time to first sheet exiting unit. Wait until timer shows that 15 minutes have elapsed.Job1 energyRecovery, active, ready, sleep, auto-off
Active1 time
6ReadyRepeat step 5.Job2 energySame as above
Active2 time
7ReadyRepeat step 5 (without active time measurement).Job3 energySame as above
8ReadyRepeat step 5 (without active time measurement).Job4 energySame as above
9ReadyZero meter and timer. Wait until meter and/or unit shows that unit has entered its auto-off mode.Final energyReady, sleep
Final time
10Auto-offZero the meter; wait test period (five minutes or more).Auto-off energyAuto-off

Originals may be placed in the document feeder before the test begins. Products without a document feeder may make all images from a single original placed on the platen.