OpenLegislation

Division 4.5 Cement

United Kingdom

Original text. Later amendments are not shown.

The use of raw materials for cement production shall be consistent with extraction management for processed products requirements (criterion 1.2).

Those producers who use cement in the production process shall comply with the following requirements:

  • cement included in any product shall be produced using not more than 3 800 MJ/t of process energy requirement (PER), calculated as explained in the Technical appendix — A4,

  • the cement included in any product shall be produced respecting the following air emission limits:

    ParameterCurrent limit (g/t)Test methods
    Dust65EN 13284-1
    SO2 350EN 14791
    NOx 900EN 14792

Assessment and verification: the applicant shall provide the relevant test reports and documentation related to the PER and the air emissions deriving from the cement production.