OpenLegislation

Division 4 The main scope of this project is to assist local authorities to improve the operation and sustainability of the ASS network of the IMS. This includes:

United Kingdom

Original text. Later amendments are not shown.

  • assessment of the current status of the certified ASS,

  • station visits, during which a system calibration will be performed,

  • additional on-site training to local station operators, if feasible,

  • infrastructure and security upgrades, if required,

  • replacement of backup power systems, if required,

  • replacement/recapitalisation of obsolete equipment.