Division 4 The main scope of this project is to assist local authorities to improve the operation and sustainability of the ASS network of the IMS. This includes:
United Kingdom
-
assessment of the current status of the certified ASS,
-
station visits, during which a system calibration will be performed,
-
additional on-site training to local station operators, if feasible,
-
infrastructure and security upgrades, if required,
-
replacement of backup power systems, if required,
-
replacement/recapitalisation of obsolete equipment.