OpenLegislation

Division 4.2.3.4.1 General requirementsF1

United Kingdom

Original text. Later amendments are not shown.

Traffic management must ensure the safe, efficient and punctual operation of the railway, including effective recovery from service disruption.

The infrastructure manager must determine procedures and means for:

  • the real time management of trains,

  • operational measures to maintain the highest possible performance of the infrastructure in case of delays or incidents, whether actual or anticipated, and

  • the provision of information to the railway undertaking(s) in such cases.

Any additional processes required by the railway undertaking and which affect the interface with the infrastructure manager(s) can be introduced after being agreed with the infrastructure manager.

Annotations

Textual amendments

F1

Substituted by Commission Regulation (EU) 2015/995 of 8 June 2015 amending Decision 2012/757/EU concerning the technical specification for interoperability relating to the ‘operation and traffic management’ subsystem of the rail system in the European Union (Text with EEA relevance).