Division Budget Item: 6701

United Kingdom

Original text. Later amendments are not shown.

Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
DE Certification2010EAGF Non-IACS known errorONE OFFEUR– 264 813,770,00– 264 813,77
Fruit and Vegetables — Exceptional support measures2011Mecklenburg-Vorpommern: withdrawal operations before the entry into force of Regulation (EU) No 585/2011FLAT RATE5,00 %EUR– 4 917,030,00– 4 917,03
Certification2010MLE for the EAGF Non-IACS populationONE OFFEUR– 97 582,360,00– 97 582,36
Decoupled Direct Aids2011Non-Extrapolation of results on-the-spot checks, claim years 2010-2012ONE OFF0,00 %EUR– 93 482,990,00– 93 482,99
Decoupled Direct Aids2012Non-Extrapolation of results on-the-spot checks, claim years 2010-2012ONE OFF0,00 %EUR– 36 627,260,00– 36 627,26
Fruit and Vegetables — Exceptional support measures2011Rheinland-Pfalz: management and control system before the entry into force of Regulation (EU) No 585/2011ONE OFFEUR– 194 499,620,00– 194 499,62
Fruit and Vegetables — Operational Programmes2011Shortcomings in the recognition of PO 139040000019 — Mecklenburg-Vorpommern RegionFLAT RATE5,00 %EUR– 129 432,740,00– 129 432,74
Fruit and Vegetables — Operational Programmes2012Shortcomings in the recognition of PO 139040000019 — Mecklenburg-Vorpommern RegionFLAT RATE5,00 %EUR– 147 300,280,00– 147 300,28
Fruit and Vegetables — Operational Programmes2013Shortcomings in the recognition of PO 139040000019 — Mecklenburg-Vorpommern RegionFLAT RATE5,00 %EUR– 150 064,030,00– 150 064,03
_Recoveries2014Unjustified halting of recoveryONE OFF0,00 %EUR– 2 481 722,50,00– 2 481 722,5
Decoupled Direct Aids2010Weakness on landscape features, claim years 2009-2011ONE OFF0,00 %EUR– 370 623,930,00– 370 623,93
Decoupled Direct Aids2011Weakness on landscape features, claim years 2009-2011ONE OFF0,00 %EUR– 357 838,280,00– 357 838,28
Decoupled Direct Aids2012Weakness on landscape features, claim years 2009-2011ONE OFF0,00 %EUR– 105 163,650,00– 105 163,65
Total DE: EUR – 4 434 068,44 0,00 – 4 434 068,44
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
ES Certification2011known errorONE OFFEUR– 3 998,890,00– 3 998,89
Other Direct Aid — Plant Products (POSEI)2008Weaknesses in SIGPAC impacting area-based complementary aid for bananasFLAT RATE5,00 %EUR– 135 979,570,00– 135 979,57
Other Direct Aid — Plant Products (POSEI)2009Weaknesses in SIGPAC impacting area-based complementary aid for bananasFLAT RATE5,00 %EUR– 308 720,40,00– 308 720,4
Other Direct Aid — POSEI2010Weaknesses in SIGPAC impacting area-based complementary aid for bananasFLAT RATE5,00 %EUR– 306 723,00,00– 306 723,0
Other Direct Aid — POSEI2011Weaknesses in SIGPAC impacting area-based complementary aid for bananasFLAT RATE2,00 %EUR– 123 456,00,00– 123 456,0
Other Direct Aid — POSEI2012Weaknesses in SIGPAC impacting area-based complementary aid for bananasFLAT RATE2,00 %EUR– 122 037,120,00– 122 037,12
Total ES: EUR – 1 000 914,98 0,00 – 1 000 914,98
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
FR Other Direct Aid — Article 68-72 of Reg.73/20092013Deficiencies in the control of the bovine measures (veals) under Article 68 of Regulation 73/2009FLAT RATE10,00 %EUR– 406 858,170,00– 406 858,17
Other Direct Aid — Article 68-72 of Reg.73/20092014Deficiencies in the control of the bovine measures (veals) under Article 68 of Regulation 73/2009FLAT RATE10,00 %EUR– 442 175,480,00– 442 175,48
Wine — Restructuring2009Payment of aid before completion of restructuring operationsFLAT RATE5,00 %EUR– 606 952,960,00– 606 952,96
Wine — Restructuring2010Payment of aid before completion of restructuring operationsFLAT RATE5,00 %EUR– 4 372 246,970,00– 4 372 246,97
Wine — Restructuring2011Payment of aid before completion of restructuring operationsFLAT RATE5,00 %EUR– 5 707 849,360,00– 5 707 849,36
Total FR: EUR – 11 536 082,94 0,00 – 11 536 082,94
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
GB Fruit and Vegetables — Operational Programmes2005Ineligible expenditureONE OFFEUR– 1 465 892,11– 54 831,07– 1 411 061,04
Fruit and Vegetables — Operational Programmes2006Ineligible expenditureONE OFFEUR– 242 089,88– 46 800,46– 195 289,42
Fruit and Vegetables — Operational Programmes2007Ineligible expenditureONE OFFEUR– 1 233 634,25– 238 484,38– 995 149,87
Fruit and Vegetables — Operational Programmes2008Ineligible expenditure (Exclusion)ONE OFFEUR– 13 400,140,00– 13 400,14
Fruit and Vegetables — Operational Programmes2009Ineligible expenditure (Exclusion)ONE OFFEUR– 59 288,470,00– 59 288,47
Fruit and Vegetables — Operational Programmes2010Ineligible expenditure (Exclusion)ONE OFFEUR– 22 715,720,00– 22 715,72
Fruit and Vegetables — Operational Programmes2008Non-compliance with recognition criteria of producer organisations (100 % exclusion of 16 non-compliant producer organisations)ONE OFFEUR– 3 656 140,550,00– 3 656 140,55
Fruit and Vegetables — Operational Programmes2009Non-compliance with recognition criteria of producer organisations (100 % exclusion of 16 non-compliant producer organisations)ONE OFFEUR– 6 184 584,80,00– 6 184 584,8
Fruit and Vegetables — Operational Programmes2010Non-compliance with recognition criteria of producer organisations (100 % exclusion of 16 non-compliant producer organisations)ONE OFFEUR– 3 480 891,950,00– 3 480 891,95
Fruit and Vegetables — Operational Programmes2011Non-compliance with recognition criteria of producer organisations (100 % exclusion of 16 non-compliant producer organisations)ONE OFFEUR– 427 546,590,00– 427 546,59
Fruit and Vegetables — Operational Programmes2012Non-compliance with recognition criteria of producer organisations (100 % exclusion of 16 non-compliant producer organisations)ONE OFFEUR– 2 147,730,00– 2 147,73
Fruit and Vegetables — Operational Programmes2008Non-compliance with recognition criteria of producer organisations (Extrapolation)ONE OFFEUR– 3 667 910,510,00– 3 667 910,51
Fruit and Vegetables — Operational Programmes2009Non-compliance with recognition criteria of producer organisations (Extrapolation)ONE OFFEUR– 7 235 505,780,00– 7 235 505,78
Fruit and Vegetables — Operational Programmes2010Non-compliance with recognition criteria of producer organisations (Extrapolation)ONE OFFEUR– 4 245 105,280,00– 4 245 105,28
Fruit and Vegetables — Operational Programmes2011Non-compliance with recognition criteria of producer organisations (Extrapolation)ONE OFFEUR– 543 884,270,00– 543 884,27
Fruit and Vegetables — Operational Programmes2012Non-compliance with recognition criteria of producer organisations (Extrapolation)ONE OFFEUR– 26 234,210,00– 26 234,21
Fruit and Vegetables — Operational Programmes2008Weaknesses in key controls in operational programmes of producer organisationsFLAT RATE10,00 %EUR– 1 116 828,27– 733 745,12– 383 083,15
Fruit and Vegetables — Operational Programmes2009Weaknesses in key controls in operational programmes of producer organisationsFLAT RATE10,00 %EUR– 2 321 311,07– 1 347 937,91– 973 373,16
Fruit and Vegetables — Operational Programmes2010Weaknesses in key controls in operational programmes of producer organisationsFLAT RATE10,00 %EUR– 1 230 356,65– 774 871,3– 455 485,35
Fruit and Vegetables — Operational Programmes2011Weaknesses in key controls in operational programmes of producer organisationsFLAT RATE10,00 %EUR– 132 682,06– 97 143,08– 35 538,98
Fruit and Vegetables — Operational Programmes2012Weaknesses in key controls in operational programmes of producer organisationsFLAT RATE10,00 %EUR– 4 552,41– 2 838,19– 1 714,22
Total GB: EUR – 37 312 702,7 – 3 296 651,51 – 34 016 051,19
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
GR Other Direct Aid — Article 68-72 of Reg.73/20092014Changes introduced in declarations after the deadlineONE OFFEUR– 106 702,00,00– 106 702,0
Other Direct Aid — Article 68-72 of Reg.73/20092012Changes introduced in declarations after the deadlineONE OFFEUR– 98 796,620,00– 98 796,62
Other Direct Aid — Article 68-72 of Reg.73/20092013Changes introduced in declarations after the deadlineONE OFFEUR– 17 215,350,00– 17 215,35
Other Direct Aid — Article 68-72 of Reg.73/20092012Control rate for ewes and she-goats schemeFLAT RATE2,00 %EUR– 485 838,550,00– 485 838,55
Entitlements2012Conversions of special entitlementsONE OFFEUR– 10 821,890,00– 10 821,89
Entitlements2013Conversions of special entitlementsONE OFFEUR– 55 395,360,00– 55 395,36
Entitlements2011Conversions of special entitlementsONE OFFEUR– 5 204,470,00– 5 204,47
Irregularities2012Delays in the recovery procedure (case 154141)ONE OFF0,00 %EUR– 941 437,40,00– 941 437,4
Irregularities2012Delays in the recovery procedure (case 162561)ONE OFF0,00 %EUR– 842 096,150,00– 842 096,15
Irregularities2012Delays in the recovery procedure (case 162861)ONE OFF0,00 %EUR– 552 487,950,00– 552 487,95
Irregularities2012Delays in the recovery procedure (case 163981)ONE OFFEUR– 279 013,860,00– 279 013,86
Irregularities2012Delays in the recovery procedure (case 164801)ONE OFF0,00 %EUR– 27 440,990,00– 27 440,99
Irregularities2012Delays in the recovery procedure (case 47761)ONE OFF0,00 %EUR– 452 069,580,00– 452 069,58
Irregularities2012Delays in the recovery procedure (case 47781)ONE OFF0,00 %EUR– 1 080 514,890,00– 1 080 514,89
Entitlements2011National reserve allocation in 2010 — Short term lease contractFLAT RATE10,00 %EUR– 95 815,5– 95 815,50,00
Entitlements2012National reserve allocation in 2010 — Short term lease contractFLAT RATE10,00 %EUR– 83 079,9– 83 079,90,00
Entitlements2013National reserve allocation in 2010 — Short term lease contractFLAT RATE10,00 %EUR– 89 037,30,00– 89 037,3
Irregularities2012Non reporting in Annex III (Cases EL/1995/002)ONE OFF0,00 %EUR– 666 519,520,00– 666 519,52
Irregularities2012Non reporting in Annex III (Cases EL/1997/078/J)ONE OFF0,00 %EUR– 700 033,30,00– 700 033,3
Promotional Measures2008not implementing art 25 of Reg. (EC) 501/2008FLAT RATE10,00 %EUR– 18 671,280,00– 18 671,28
Promotional Measures2009not implementing art 25 of Reg. (EC) 501/2008FLAT RATE10,00 %EUR– 129 920,480,00– 129 920,48
Promotional Measures2010not implementing art 25 of Reg. (EC) 501/2008FLAT RATE10,00 %EUR– 200 612,640,00– 200 612,64
Promotional Measures2011not implementing art 25 of Reg. (EC) 501/2008FLAT RATE10,00 %EUR– 228 647,150,00– 228 647,15
Promotional Measures2012not implementing art 25 of Reg. (EC) 501/2008FLAT RATE10,00 %EUR– 83 658,550,00– 83 658,55
Irregularities2012Weaknesses in the debt management proceduresFLAT RATE10,00 %EUR– 5 993 214,33– 417 506,08– 5 575 708,25
Total GR: EUR – 13 244 245,01 – 596 401,48 – 12 647 843,53
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
IE Other Direct Aid — Energy Crops2009CY 2008, LPIS & OTSC Weaknesses — Aid Energy CropsONE OFFEUR– 31,050,00– 31,05
Other Direct Aids2009CY 2008, LPIS & OTSC Weaknesses — Other Direct Aids (Protein Crops)ONE OFFEUR– 6,110,00– 6,11
Decoupled Direct Aids2009CY 2008, LPIS & OTSC Weaknesses — SPSONE OFFEUR– 13 797 397,95– 236 510,85– 13 560 887,1
Other Direct Aids2010CY 2009, LPIS & OTSC Weaknesses — Other Direct Aids (Protein Crops)ONE OFFEUR– 34,450,00– 34,45
Decoupled Direct Aids2010CY 2009, LPIS & OTSC Weaknesses — SPSONE OFFEUR– 12 885 281,59– 220 875,62– 12 664 405,97
Other Direct Aid — Article 68-72 of Reg.73/20092011CY 2010, LPIS & OTSC Weaknesses — ODA Art. 68 (Grassland Sheep Scheme)ONE OFFEUR– 38 235,250,00– 38 235,25
Other Direct Aids2011CY 2010, LPIS & OTSC Weaknesses — Other Direct Aids (Protein Crops)ONE OFFEUR– 11,110,00– 11,11
Decoupled Direct Aids2011CY 2010, LPIS & OTSC Weaknesses — SPSONE OFFEUR– 10 322 794,07– 176 950,23– 10 145 843,84
Other Direct Aid — Article 68-72 of Reg.73/20092012CY 2011, LPIS & OTSC Weaknesses — ODA Art. 68 (Grassland Sheep Scheme)ONE OFFEUR– 38 060,150,00– 38 060,15
Other Direct Aids2012CY 2011, LPIS & OTSC Weaknesses — Other Direct Aids (Protein Crops)ONE OFFEUR– 7,780,00– 7,78
Decoupled Direct Aids2012CY 2011, LPIS & OTSC Weaknesses — SPSONE OFFEUR– 9 441 799,89– 161 848,49– 9 279 951,4
Other Direct Aid — Article 68-72 of Reg.73/20092013CY 2012, LPIS & OTSC Weaknesses — ODA Art. 68 (Grassland Sheep Scheme)ONE OFFEUR– 38 125,910,00– 38 125,91
Decoupled Direct Aids2013CY 2012, LPIS & OTSC Weaknesses — SPSONE OFFEUR– 9 180 051,51– 157 361,68– 9 022 689,83
Decoupled Direct Aids2014Payments made before finalisation of the cross-checksONE OFFEUR– 52 583,00,00– 52 583,0
Decoupled Direct Aids2014Weaknesses in the LPIS — CY 2013 — low eligibility coefficientESTIMATED PERCENTAGE0,15 %EUR– 1 794 724,380,00– 1 794 724,38
Decoupled Direct Aids2015Weaknesses in the LPIS — CY 2014 — low eligibility coefficientFLAT RATE0,15 %EUR– 1 751 128,170,00– 1 751 128,17
Total IE: EUR – 59 340 272,37 – 953 546,87 – 58 386 725,5
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
IT Certification2009bad application of regulationsONE OFFEUR– 10 762 502,00,00– 10 762 502,0
Fruit and Vegetables — Exceptional support measures2011Deduction of production already harvested. The guidance provided by the Italian authorities in June 2011 was not appropriate to allow the performance of the controls in compliance with the Article 4 (2) of Regulation (EU) No 585/2011FLAT RATE5,00 %EUR– 405 166,99– 1 143,95– 404 023,04
Entitlements2010Inadequate determination area of citrus fruit sector (decoupling)FLAT RATE10,00 %EUR– 2 452 251,96– 237,00– 2 452 014,96
Other Direct Aid — Article 69 of Reg.1782/2003 — only Ovine and Bovines2010Incorrect calculation of reductions & exclusions — Risk sampling weaknesses (Art69 bovine sector)FLAT RATE2,00 %EUR– 465 893,60,00– 465 893,6
Other Direct Aid — Article 69 of Reg.1782/2003 — only Ovines and Bovines2011Incorrect calculation of reductions & exclusions — Risk sampling weaknesses (Art69 bovine sector)FLAT RATE2,00 %EUR– 15 678,190,00– 15 678,19
Other Direct Aid — Article 69 of Reg.1782/2003 — only Ovines and Bovines2012Incorrect calculation of reductions & exclusions — Risk sampling weaknesses (Art69 bovine sector)FLAT RATE2,00 %EUR– 4 528,20,00– 4 528,2
Other Direct Aid — Article 69 of Reg.1782/2003 — only Ovines and Bovines2013Incorrect calculation of reductions & exclusions — Risk sampling weaknesses (Art69 bovine sector)FLAT RATE2,00 %EUR45,160,0045,16
Fruit and Vegetables — Exceptional support measures2011On-the-spot controls performed by the Italian inspectors were not systematically taken into consideration when calculating the payable aid.ONE OFFEUR– 22 879,010,00– 22 879,01
Other Direct Aid — Article 69 of Reg.1782/2003 — only Ovines and Bovines2010OTSC minimum rate not achieved — Risk sampling weaknesses (Art69 sheep/goats CY2009)FLAT RATE5,00 %EUR– 28 020,720,00– 28 020,72
Other Direct Aid — Article 69 of Reg.1782/2003 — only Ovines and Bovines2011OTSC minimum rate not achieved — Risk sampling weaknesses (Art69 sheep/goats CY2009)FLAT RATE5,00 %EUR– 144,920,00– 144,92
Other Direct Aid — Article 69 of Reg.1782/2003 — only Ovines and Bovines2012OTSC minimum rate not achieved — Risk sampling weaknesses (Art69 sheep/goats CY2009)FLAT RATE5,00 %EUR– 34,580,00– 34,58
Other Direct Aid — Article 68-72 of Reg.73/20092011OTSC: minimum rate not achieved & timing not respecting regulatory provisions (Art.68 sheep/goats)FLAT RATE5,00 %EUR– 162 507,940,00– 162 507,94
Other Direct Aid — Article 68-72 of Reg.73/20092012OTSC: minimum rate not achieved & timing not respecting regulatory provisions (Art.68 sheep/goats)FLAT RATE5,00 %EUR– 13 957,290,00– 13 957,29
Other Direct Aid — Article 68-72 of Reg.73/20092011OTSC timing not respecting regulatory provisions — incorrect calculation of reductions & exclusions (Art68 bovine sector) — Risk sampling weaknessesFLAT RATE2,00 %EUR– 688 755,50,00– 688 755,5
Other Direct Aid — Article 68-72 of Reg.73/20092012OTSC timing not respecting regulatory provisions — incorrect calculation of reductions & exclusions (Art68 bovine sector) — Risk sampling weaknessesFLAT RATE2,00 %EUR– 28 700,820,00– 28 700,82
Cross Compliance2010Partial coverage of SMR1 and SMR5, CY 2009FLAT RATE2,00 %EUR– 382 708,890,00– 382 708,89
Cross Compliance2011Partial coverage of SMR1 and SMR5, CY 2010FLAT RATE2,00 %EUR– 420 298,750,00– 420 298,75
Cross Compliance2012Partial coverage of SMR1 and SMR5, CY 2011FLAT RATE2,00 %EUR– 376 732,380,00– 376 732,38
Other Direct Aid — Article 69 of Reg.1782/2003 — only Ovines and Bovines2010Risk sampling weaknesses (Art69 sheep/goats CY2009)FLAT RATE2,00 %EUR– 10 716,990,00– 10 716,99
Other Direct Aid — Article 69 of Reg.1782/2003 — only Ovines and Bovines2011Risk sampling weaknesses (Art69 sheep/goats CY2009)FLAT RATE2,00 %EUR– 15,450,00– 15,45
Other Direct Aid — Article 69 of Reg.1782/2003 — only Ovines and Bovines2013Risk sampling weaknesses (Art69 sheep/goats CY2009)FLAT RATE2,00 %EUR– 66,660,00– 66,66
Cross Compliance2009Serious deficiencies in the cross-compliance controls carry-out by the veterinary services, farmers with animals, CY 2008FLAT RATE10,00 %EUR– 6 698 435,55– 212 378,16– 6 486 057,39
Cross Compliance2010Serious deficiencies in the cross-compliance controls carry-out by the veterinary services, farmers with animals, CY 2009FLAT RATE10,00 %EUR– 6 193 786,19– 124 718,0– 6 069 068,19
Cross Compliance2011Serious deficiencies in the cross-compliance controls carry-out by the veterinary services, farmers with animals, CY 2010FLAT RATE10,00 %EUR– 6 803 948,36– 24 060,82– 6 779 887,54
Cross Compliance2010Weaknesses in control and sanctions of animal related SMRs, CY 2009FLAT RATE5,00 %EUR– 880 348,63– 1 453,94– 878 894,69
Cross Compliance2011Weaknesses in control and sanctions of animal related SMRs, CY 2010FLAT RATE5,00 %EUR– 946 039,32– 1 115,13– 944 924,19
Cross Compliance2012Weaknesses in control and sanctions of animal related SMRs, CY 2011FLAT RATE5,00 %EUR– 891 273,37– 3 350,4– 887 922,97
Cross Compliance2009Weaknesses in controls of SMR1 and 5, in cross-reporting from eligibility checks, farmers without animals, CY 2008FLAT RATE5,00 %EUR– 2 735 874,460,00– 2 735 874,46
Cross Compliance2010Weaknesses in controls of SMR1 and 5, in cross-reporting from eligibility checks, farmers without animals, CY 2009FLAT RATE5,00 %EUR– 2 688 492,980,00– 2 688 492,98
Cross Compliance2011Weaknesses in controls of SMR1 and 5, in cross-reporting from eligibility checks, farmers without animals, CY 2010FLAT RATE5,00 %EUR– 3 141 614,530,00– 3 141 614,53
Total IT: EUR – 47 221 329,07 – 368 457,4 – 46 852 871,67
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
LT Other Direct Aid — Article 68-72 of Reg.73/20092012Recoveries for ineligible animalsONE OFF0,00 %EUR– 23 166,730,00– 23 166,73
Other Direct Aid — Article 68-72 of Reg.73/20092012Timing and performance of OTSCFLAT RATE5,00 %EUR– 458 039,67– 1 158,34– 456 881,33
Other Direct Aid — Article 68-72 of Reg.73/20092013Timing and performance of OTSCFLAT RATE5,00 %EUR– 656 708,320,00– 656 708,32
Decoupled Direct Aids2012Weakness in quality of LPIS, 2011ESTIMATED AMOUNT0,00 %EUR– 305 140,28– 47 262,68– 257 877,6
Decoupled Direct Aids2010Weakness in quality of LPIS and cross-checks, 2009ESTIMATED AMOUNTEUR– 3 281 119,25– 201 760,71– 3 079 358,54
Other Direct Aid — Energy Crops2010Weakness in quality of LPIS and cross-checks, 2009ESTIMATED AMOUNTEUR– 26 419,79– 1 258,91– 25 160,88
Decoupled Direct Aids2011Weakness in quality of LPIS and cross-checks, 2010ESTIMATED AMOUNTEUR– 1 411 640,83– 239 125,42– 1 172 515,41
Total LT: EUR – 6 162 234,87 – 490 566,06 – 5 671 668,81
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
NL Certification2011Non-application of regulatory sanctions in the Area aidsONE OFFEUR– 266 945,16– 533,89– 266 411,27
Fruit and Vegetables — Operational Programmes2008Unduly recognised and therefore ineligible producer organisations (beneficiaries)FLAT RATE10,00 %EUR– 3 634 876,030,00– 3 634 876,03
Fruit and Vegetables — Operational Programmes2009Unduly recognised and therefore ineligible producer organisations (beneficiaries)FLAT RATE10,00 %EUR– 9 676 043,020,00– 9 676 043,02
Fruit and Vegetables — Operational Programmes2009Unduly recognised and therefore ineligible producer organisations (beneficiaries)ONE OFF0,00 %EUR– 22 444 064,750,00– 22 444 064,75
Fruit and Vegetables — Operational Programmes2010Unduly recognised and therefore ineligible producer organisations (beneficiaries)FLAT RATE10,00 %EUR– 5 091 421,28– 1 060 066,47– 4 031 354,81
Fruit and Vegetables — Operational Programmes2010Unduly recognised and therefore ineligible producer organisations (beneficiaries)ONE OFF0,00 %EUR– 10 185 726,00,00– 10 185 726,0
Fruit and Vegetables — Operational Programmes2011Unduly recognised and therefore ineligible producer organisations (beneficiaries)FLAT RATE10,00 %EUR– 138 726,75– 79 662,72– 59 064,03
Fruit and Vegetables — Operational Programmes2011Unduly recognised and therefore ineligible producer organisations (beneficiaries)ONE OFF0,00 %EUR– 796 627,190,00– 796 627,19
Certification2011Unrecorded interestONE OFFEUR– 36 000,00,00– 36 000,0
Total NL: EUR – 52 270 430,18 – 1 140 263,08 – 51 130 167,1
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
RO Other Direct Aid — Article 68-72 of Reg.73/20092011Failure to apply sanctions when irregularities concern no more than three animalsONE OFF0,00 %EUR– 1 304 365,590,00– 1 304 365,59
Other Direct Aid — Article 68-72 of Reg.73/20092011Non-compliance in schedule and quality of on-the-spot checksFLAT RATE5,00 %EUR– 1 121 615,69– 107 659,09– 1 013 956,6
Other Direct Aid — Article 68-72 of Reg.73/20092012Non-compliance in schedule and quality of on-the-spot checksFLAT RATE5,00 %EUR141,590,00141,59
Other Direct Aid — Article 68-72 of Reg.73/20092013Non-compliance in schedule and quality of on-the-spot checksFLAT RATE5,00 %EUR– 364,790,00– 364,79
Other Direct Aid — Article 68-72 of Reg.73/20092011Payment for non-identified animalsONE OFF0,00 %EUR– 57 984,660,00– 57 984,66
Other Direct Aid — Article 68-72 of Reg.73/20092011Problems concerning the accuracy of the information contained in the databaseONE OFF0,00 %EUR– 411 471,90,00– 411 471,9
Other Direct Aid — Article 68-72 of Reg.73/20092011Verification of retention periodONE OFF0,00 %EUR– 379 359,70,00– 379 359,7
Decoupled Direct Aids2012Weaknesses in the on-the-spot checks — remote sensingFLAT RATE2,00 %EUR– 7 858 523,780,00– 7 858 523,78
Total RO: EUR – 11 133 544,52 – 107 659,09 – 11 025 885,43
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
SI Decoupled Direct Aids2013CY 2012 — Lack of control procedureONE OFFEUR– 42 615,90,00– 42 615,9
Decoupled Direct Aids2013CY 2012 — Weaknesses in administrative checksONE OFFEUR– 45 828,580,00– 45 828,58
Decoupled Direct Aids2014CY 2013 — Lack of control procedureONE OFFEUR– 45 519,080,00– 45 519,08
Decoupled Direct Aids2014CY 2013 — Weaknesses in administrative checksONE OFFEUR– 63 146,690,00– 63 146,69
Decoupled Direct Aids2015CY 2014 — Lack of control procedureONE OFFEUR– 34 211,940,00– 34 211,94
Total SI: EUR – 231 322,19 0,00 – 231 322,19
Member StateMeasureFYReasonTypeCorrection %CurrencyAmountDeductionsFinancial Impact
SK Decoupled Direct Aids2011CY 2010, Unpaved access roadsESTIMATED PERCENTAGE0,53 %EUR– 1 401 828,520,00– 1 401 828,52
Decoupled Direct Aids2012CY 2010, Unpaved access roadsESTIMATED PERCENTAGE0,53 %EUR– 2 086,310,00– 2 086,31
Decoupled Direct Aids2013CY 2010, Unpaved access roadsESTIMATED PERCENTAGE0,53 %EUR– 667,320,00– 667,32
Decoupled Direct Aids2012CY 2011, Unpaved access roadsESTIMATED PERCENTAGE0,53 %EUR– 1 526 916,920,00– 1 526 916,92
Decoupled Direct Aids2013CY 2011, Unpaved access roadsESTIMATED PERCENTAGE0,53 %EUR– 2 259,740,00– 2 259,74
Promotional Measures2009non-respect of public procurement rulesFLAT RATE25,00 %EUR– 126 925,930,00– 126 925,93
Promotional Measures2010non-respect of public procurement rulesFLAT RATE25,00 %EUR– 159 294,030,00– 159 294,03
Promotional Measures2011non-respect of public procurement rulesFLAT RATE25,00 %EUR– 159 932,040,00– 159 932,04
Promotional Measures2012non-respect of public procurement rulesFLAT RATE25,00 %EUR– 13 699,20,00– 13 699,2
Total SK: EUR – 3 393 610,01 0,00 – 3 393 610,01
CurrencyAmountDeductionsFinancial Impact
EUR – 247 280 757,28– 6 953 545,49– 240 327 211,79