OpenLegislation

Commission Implementing Decision (EU) 2016/687 of 28 April 2016 on the harmonisation of the 694-790 MHz frequency band for terrestrial systems capable of providing wireless broadband electronic communications services and for flexible national use in the Union (notified under document C(2016) 2268) (Text with EEA relevance) (revoked)

EU Decision 2016/687 · Adopted 28 April 2016 · Extends to United Kingdom

Original text. legislation.gov.uk does not revise this item, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Commission Implementing Decision (EU) 2016/687

of 28 April 2016

on the harmonisation of the 694-790 MHz frequency band for terrestrial systems capable of providing wireless broadband electronic communications services and for flexible national use in the Union

(notified under document C(2016) 2268)

(Text with EEA relevance) (revoked)

F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annotations to the whole text

Textual amendments

F1

Decision revoked (31.12.2020) by The Radio Spectrum (EU Exit) Regulations 2018 (S.I. 2018/1385), reg. 1, Sch. 2 para. 37; 2020 c. 1, Sch. 5 para. 1(1)

Contents

  1. 1Article 1 Repealed
  2. 2Article 2 Repealed
  3. 3Article 3 Repealed
  4. 4Article 4 Repealed
  5. 5Article 5 Repealed
  6. 6Article 6 Repealed
  7. 7Article 7 Repealed
  8. Signature
  9. Annex: PARAMETERS REFERRED TO IN ARTICLE 3 Repealed
  10. AGeneral parameters Repealed
  11. 1Pursuant to Article 3(1)(a), within the 703-733 MHz and 758-788 MHz frequency bands, the frequency arrangement shall be as follows: Repealed
  12. 2Pursuant to Article 3(1)(b), the frequency arrangement within the 738-758 MHz frequency band for use in full or in part for terrestrial systems capable of providing wireless broadband electronic communications services, shall be as follows: Repealed
  13. 3Pursuant to Article 3(1)(b), the frequency arrangement within the frequency bands 698-703 MHz, 733-736 MHz, 753-758 MHz and 788-791 MHz for use in full or in part for PPDR radio communications shall be as follows: the mode of operation shall be Frequency Division Duplex; the duplex spacing shall be 55 MHz with terminal station transmission (PPDR uplink) located in one or both of the frequency band 698-703 MHz and 733-736 MHz, and base station transmission (PPDR downlink) located in one or both of the frequency band 753-758 MHz and 788-791 MHz, respectively. Repealed
  14. 4Division 4 Repealed
  15. 5Division 5 Repealed
  16. BTechnical conditions for base stations for terrestrial systems capable of providing electronic communications services within the 738-788 MHz frequency band Repealed
  17. In-block requirements Repealed
  18. Out-of-block requirements Repealed
  19. CTechnical conditions for terminal stations for electronic communications services within the 703-733 MHz frequency band Repealed
  20. In-block requirements Repealed
  21. Out-of-block requirements Repealed
  22. Explanatory note to Table 11 Repealed
  23. Explanatory notes to Table 12 Repealed
  24. (1)The derivation of the unwanted emissions limit is based on DTT broadcasting using DVB-T2 and a WBB system with a bandwidth of 10 MHz for a centre frequency separation between DTT broadcasting and WBB of 18 MHz (assuming an 8 MHz TV channel, 9 MHz guard band and a WBB system bandwidth of 10 MHz). If Member States wish to allow the deployment of WBB systems on a national basis with a bandwidth greater than 10 MHz and in case unwanted out-of-block power higher than – 42 dBm/8 MHz is generated in the band below 694 MHz, they should consider: Repealed
  25. (2)Division (2) Repealed
  26. (3)Division (3) Repealed
  27. (4)Division (4) Repealed

1F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Signature

F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

AGeneral parametersF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1Pursuant to Article 3(1)(a), within the 703-733 MHz and 758-788 MHz frequency bands, the frequency arrangement shall be as follows:F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2Pursuant to Article 3(1)(b), the frequency arrangement within the 738-758 MHz frequency band for use in full or in part for terrestrial systems capable of providing wireless broadband electronic communications services, shall be as follows:F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3Pursuant to Article 3(1)(b), the frequency arrangement within the frequency bands 698-703 MHz, 733-736 MHz, 753-758 MHz and 788-791 MHz for use in full or in part for PPDR radio communications shall be as follows: the mode of operation shall be Frequency Division Duplex; the duplex spacing shall be 55 MHz with terminal station transmission (PPDR uplink) located in one or both of the frequency band 698-703 MHz and 733-736 MHz, and base station transmission (PPDR downlink) located in one or both of the frequency band 753-758 MHz and 788-791 MHz, respectively.F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

BTechnical conditions for base stations for terrestrial systems capable of providing electronic communications services within the 738-788 MHz frequency bandF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

In-block requirementsF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Out-of-block requirementsF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

CTechnical conditions for terminal stations for electronic communications services within the 703-733 MHz frequency bandF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

In-block requirementsF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Out-of-block requirementsF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Explanatory note to Table 11F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Explanatory notes to Table 12F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(1)The derivation of the unwanted emissions limit is based on DTT broadcasting using DVB-T2 and a WBB system with a bandwidth of 10 MHz for a centre frequency separation between DTT broadcasting and WBB of 18 MHz (assuming an 8 MHz TV channel, 9 MHz guard band and a WBB system bandwidth of 10 MHz). If Member States wish to allow the deployment of WBB systems on a national basis with a bandwidth greater than 10 MHz and in case unwanted out-of-block power higher than – 42 dBm/8 MHz is generated in the band below 694 MHz, they should consider:F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(2)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(3)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(4)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .