Division 5.3 Flaring

United Kingdom

Original text. Later amendments are not shown.

TechniqueDescriptionApplicability
(a)Correct plant designThis includes the provision of a gas recovery system with sufficient capacity and the use of high-integrity relief valves.Generally applicable to new plants. Gas recovery systems may be retrofitted in existing plants.
(b)Plant managementThis includes balancing the fuel gas system and using advanced process control.Generally applicable.
TechniqueDescriptionApplicability
(a)Correct design of flaring devicesOptimisation of height, pressure, assistance by steam, air or gas, type of flare tips (either enclosed or shielded), etc., aimed to enable smokeless and reliable operation and to ensure the efficient combustion of excess gases.Applicable to new flares. In existing plants, applicability may be restricted due to e.g. maintenance time availability during the turnaround of the plant.
(b)Monitoring and recording as part of flare managementContinuous monitoring of the gas sent to flaring, measurements of gas flow and estimations of other parameters (e.g. composition, heat content, ratio of assistance, velocity, purge gas flow rate, pollutant emissions (e.g. NOX, CO, hydrocarbons, noise)). The recording of flaring events usually includes the estimated/measured flare gas composition, the estimated/measured flare gas quantity and the duration of operation. The recording allows for the quantification of emissions and the potential prevention of future flaring events.Generally applicable.