OpenLegislation

Commission Implementing Decision (EU) 2019/1835 of 30 October 2019 excluding from European Union financing certain expenditure incurred by the Member States under the European Agricultural Guarantee Fund (EAGF) and under the European Agricultural Fund for Rural Development (EAFRD) (notified under document C(2019) 7815) (Only the Bulgarian, Croatian, Czech, Dutch, English, French, German, Greek, Hungarian, Italian, Lithuanian, Maltese, Portuguese, Romanian, Slovak, Spanish and Swedish texts are authentic)

EU Decision 2019/1835 · Adopted 30 October 2019 · Extends to United Kingdom

Original text. legislation.gov.uk does not revise this item, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Commission Implementing Decision (EU) 2019/1835

of 30 October 2019

excluding from European Union financing certain expenditure incurred by the Member States under the European Agricultural Guarantee Fund (EAGF) and under the European Agricultural Fund for Rural Development (EAFRD)

(notified under document C(2019) 7815)

(Only the Bulgarian, Croatian, Czech, Dutch, English, French, German, Greek, Hungarian, Italian, Lithuanian, Maltese, Portuguese, Romanian, Slovak, Spanish and Swedish texts are authentic)

THE EUROPEAN COMMISSION,

Having regard to the Treaty on the Functioning of the European Union,

Having regard to Regulation (EU) No 1306/2013 of the European Parliament and of the Council of 17 December 2013 on the financing, management and monitoring of the common agricultural policy and repealing Council Regulations (EEC) No 352/78, (EC) No 165/94, (EC) No 2799/98, (EC) No 814/2000, (EC) No 1290/2005 and (EC) No 485/2008f1, and in particular Article 52 thereof,

After consulting the Committee on the Agricultural Funds,

Whereas:

(1)

In accordance with Article 52 of Regulation (EU) No 1306/2013 the Commission is to carry out the necessary verifications, communicate to the Member States the results of those verifications, take note of the comments of the Member States, initiate a bilateral discussion so that an agreement may be reached with the Member States in question, and formally communicate its conclusions to them.

(2)

The Member States have had an opportunity to request the launch of a conciliation procedure. That opportunity has been used in some cases and the reports issued on the outcome have been examined by the Commission.

(3)

In accordance with Regulation (EU) No 1306/2013, only agricultural expenditure which has been incurred in a way that has not infringed Union law may be financed.

(4)

In the light of the verifications carried out, the outcome of the bilateral discussions and the conciliation procedures, part of the expenditure declared by the Member States does not fulfil this requirement and cannot, therefore, be financed under the EAGF and the EAFRD.

(5)

The amounts that are not recognised as being chargeable to the EAGF and the EAFRD should be indicated. Those amounts do not relate to expenditure incurred more than 24 months before the Commission’s written notification of the results of the verifications to the Member States.

(6)

The amounts excluded from Union financing by the present Decision should also take into account any reductions or suspensions in accordance with Article 41 of Regulation (EU) No 1306/2013 due to the fact that such reductions or suspensions are of a provisional nature and without prejudice to decisions taken pursuant to Articles 51 or 52 of that Regulation.

(7)

As regards the cases covered by this decision, the assessment of the amounts to be excluded on grounds of non-compliance with Union law was notified by the Commission to the Member States in a summary report on the subjectf2.

(8)

This Decision is without prejudice to any financial conclusions that the Commission may draw from the judgments of the Court of Justice of the European Union in cases pending on 15 September 2019,

HAS ADOPTED THIS DECISION:

Annotations to the whole text

Footnotes

f1

OJ L 347, 20.12.2013, p.549

f2

Ares(2019)6542527

Contents

  1. 1Article 1
  2. 2Article 2
  3. Annex: Decision: 61
  4. Budget Item: 0 5 0 7 0 1 0 7
  5. Budget Item: 6 7 0 1
  6. Budget Item: 6711

1

The amounts set out in the Annex and related to expenditure incurred by the Member States’ accredited paying agencies and declared under the EAGF or the EAFRD shall be excluded from Union financing.

2

This Decision is addressed to the Kingdom of Belgium, the Republic of Bulgaria, the Czech Republic, the Federal Republic of Germany, Ireland, the Kingdom of Spain, the French Republic, the Republic of Croatia, the Italian Republic, the Republic of Cyprus, the Republic of Lithuania, the Grand Duchy of Luxembourg, Hungary, the Republic of Malta, the Kingdom of the Netherlands, the Portuguese Republic, Romania, the Slovak Republic, the Kingdom of Sweden and the United Kingdom of Great Britain and Northern Ireland.

Budget Item: 0 5 0 7 0 1 0 7

Member State Measure FY Reason Type Correction % Currency Amount Deductions Financial Impact
ES Fruit and Vegetables - Operational Programmes2009Reimbursement following judgment in case T-237/17FLAT RATE10,00 %EUR3 922 888,8204 258,511 880 130,29
Fruit and Vegetables - Operational Programmes2010Reimbursement following judgment in case T-237/17FLAT RATE10,00 %EUR4 917 485,692 566 722,822 350 762,87
Fruit and Vegetables - Operational Programmes2011Reimbursement following judgment in case T-237/17FLAT RATE10,00 %EUR440 969,18220 484,59220 484,59
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE1,59 %EUR122 921,790,00122 921,79
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE3,58 %EUR8 144 125,580,008 144 125,58
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE3,80 %EUR1 383 647,930,001 383 647,93
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE4,46 %EUR3 642 817,360,003 642 817,36
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE4,99 %EUR375 612,880,00375 612,88
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE5,86 %EUR9 260 920,720,009 260 920,72
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE6,40 %EUR677 367,040,00677 367,04
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE6,52 %EUR1 126 563,990,001 126 563,99
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE7,68 %EUR773 889,450,00773 889,45
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE8,60 %EUR608 889,90,00608 889,9
Decoupled Direct Aids2011Reimbursement following judgment in case T-459/16FLAT RATE10,04 %EUR15 628 447,210,0015 628 447,21
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE1,53 %EUR107 658,060,00107 658,06
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE3,52 %EUR1 461 366,240,001 461 366,24
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE3,61 %EUR8 152 425,60,008 152 425,6
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE4,40 %EUR324 045,510,00324 045,51
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE4,41 %EUR3 250 342,680,003 250 342,68
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE5,47 %EUR8 971 740,910,008 971 740,91
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE6,42 %EUR1 133 969,530,001 133 969,53
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE7,67 %EUR758 779,440,00758 779,44
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE8,71 %EUR634 659,580,00634 659,58
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE8,84 %EUR817 979,540,00817 979,54
Decoupled Direct Aids2012Reimbursement following judgment in case T-459/16FLAT RATE10,06 %EUR16 284 452,860,0016 284 452,86
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE1,52 %EUR233 815,980,00233 815,98
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE2,73 %EUR1 889 533,780,001 889 533,78
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE3,47 %EUR286 966,220,00286 966,22
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE3,60 %EUR8 922 409,090,008 922 409,09
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE4,34 %EUR3 595 030,510,003 595 030,51
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE5,23 %EUR9 337 109,090,009 337 109,09
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE5,67 %EUR1 253 352,060,001 253 352,06
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE8,11 %EUR735 385,020,00735 385,02
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE8,35 %EUR976 720,070,00976 720,07
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE8,47 %EUR791 381,360,00791 381,36
Decoupled Direct Aids2013Reimbursement following judgment in case T-459/16FLAT RATE10,09 %EUR16 273 380,810,0016 273 380,81
Decoupled Direct Aids2014Reimbursement following judgment in case T-459/16FLAT RATE1,78 %EUR213 024,960,00213 024,96
Decoupled Direct Aids2014Reimbursement following judgment in case T-459/16FLAT RATE2,43 %EUR1 257 733,690,001 257 733,69
Decoupled Direct Aids2014Reimbursement following judgment in case T-459/16FLAT RATE3,58 %EUR8 900 539,540,008 900 539,54
Decoupled Direct Aids2014Reimbursement following judgment in case T-459/16FLAT RATE3,67 %EUR163 452,060,00163 452,06
Decoupled Direct Aids2014Reimbursement following judgment in case T-459/16FLAT RATE5,22 %EUR13 137 895,990,0013 137 895,99
Decoupled Direct Aids2014Reimbursement following judgment in case T-459/16FLAT RATE5,62 %EUR1 224 032,810,001 224 032,81
Decoupled Direct Aids2014Reimbursement following judgment in case T-459/16FLAT RATE8,21 %EUR1 097 274,610,001 097 274,61
Decoupled Direct Aids2014Reimbursement following judgment in case T-459/16FLAT RATE8,22 %EUR747 321,720,00747 321,72
Decoupled Direct Aids2014Reimbursement following judgment in case T-459/16FLAT RATE8,53 %EUR1 000 460,40,001 000 460,4
Decoupled Direct Aids2014Reimbursement following judgment in case T-459/16FLAT RATE10,09 %EUR16 483 871,520,0016 483 871,52
Total ES: EUR 181 444 658,76 4 829 965,92 176 614 692,84
Currency Amount Deductions Financial Impact
EUR 181 444 658,764 829 965,92176 614 692,84

Budget Item: 6 7 0 1

Member State Measure FY Reason Type Correction % Currency Amount Deductions Financial Impact
BE Clearance of Accounts - Financial Clearance2017administrative error (p.105 du CB report)ONE OFFEUR- 497,410,00- 497,41
Clearance of Accounts - Financial Clearance2017over estimation on expenditure (prg. 5.3.4 of CB report)ONE OFFEUR- 597,140,00- 597,14
School Fruit Scheme2017School Scheme for SPW (Service Public Wallonie)ONE OFFEUR- 76 658,150,00- 76 658,15
Total BE: EUR - 77 752,7 0,00 - 77 752,7
BG Cross-compliance2016Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2015FLAT RATE5,00 %EUR-1 006 053,47- 465,49-1 005 587,98
Cross-compliance2017Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2015FLAT RATE5,00 %EUR- 1 943,570,00- 1 943,57
Cross-compliance2018Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2015FLAT RATE5,00 %EUR- 86,080,00- 86,08
Cross-compliance2015Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2016FLAT RATE5,00 %EUR- 13 495,90,00- 13 495,9
Cross-compliance2016Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2016FLAT RATE5,00 %EUR- 1 392,6- 5,43- 1 387,17
Cross-compliance2017Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2016FLAT RATE5,00 %EUR- 1 108 875,350,00-1 108 875,35
Cross-compliance2018Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2016FLAT RATE5,00 %EUR- 2 508,660,00- 2 508,66
Other Direct Aids2018Insufficient level of OTSCONE OFFEUR- 69 316,190,00- 69 316,19
Voluntary Coupled Support2018Insufficient level of OTSCONE OFFEUR- 143 052,20,00- 143 052,2
Fruit and Vegetables - Exceptional support measures2015Reimbursement due to double recovery of reductions FY 2015ONE OFFEUR6 590,910,00690,91
Total BG: EUR -2 340 133,11 - 470,92 -2 339 662,19
CY Voluntary Coupled Support2017Weak on-the-spot check - minimum control rate not reached - claim year 2016 - measure 1ONE OFFEUR- 45 645,680,00- 45 645,68
Voluntary Coupled Support2017Weak on-the-spot check - minimum control rate not reached - claim year 2016 - measure 3ONE OFFEUR- 11 476,640,00- 11 476,64
Total CY: EUR - 57 122,32 0,00 - 57 122,32
CZ School Fruit Scheme2016Deficiencies in key control ‘Performance of on-the-spot checks of sufficient quality’ FY2016 and FY2017FLAT RATE5,00 %EUR- 189 042,660,00- 189 042,66
School Fruit Scheme2017Deficiencies in key control ‘Performance of on-the-spot checks of sufficient quality’ FY2016 and FY2017FLAT RATE5,00 %EUR- 195 157,270,00- 195 157,27
School Fruit Scheme2018Deficiencies in key control ‘Performance of on-the-spot checks of sufficient quality’ FY2018FLAT RATE5,00 %EUR- 18 547,930,00- 18 547,93
Total CZ: EUR - 402 747,86 0,00 - 402 747,86
DE Fruit and Vegetables - Operational programmes incl withdrawals2016Actions not implemented - OP 2015ONE OFFEUR- 18 715,440,00- 18 715,44
Fruit and Vegetables - Operational programmes incl withdrawals2017Actions not implemented OP 2016ONE OFFEUR- 114,700,00- 114,70
Fruit and Vegetables - Operational programmes incl withdrawals2016Carry over - ineligible amount FY 2016ONE OFFEUR- 62 468,920,00- 62 468,92
Fruit and Vegetables - Operational programmes incl withdrawals2017Carry over - ineligible expenditure FY 2017ONE OFFEUR- 2 593,240,00- 2 593,24
Irregularities2017compliance testing and substantive testing of Annexes II and III and known errors (annual sanctions)ONE OFFEUR- 70 522,630,00- 70 522,63
Certification2017Differences in debts' reconciliation EAGFONE OFFEUR- 32 117,630,00- 32 117,63
Clearance of Accounts - Financial Clearance2017Financial errors found in substantive testing on EAGF (annex 1 of CB report)ONE OFFEUR- 205,770,00- 205,77
Certification2017Individual errors in EAGFONE OFFEUR- 347 912,420,00- 347 912,42
Total DE: EUR - 534 650,75 0,00 - 534 650,75
ES Wine - Investment2015Absence of checks on the soundness of estimates FY 2015FLAT RATE10,00 %EUR- 91 783,150,00- 91 783,15
Wine - Investment2016Absence of checks on the soundness of estimates FY 2016FLAT RATE10,00 %EUR- 143 195,410,00- 143 195,41
Wine - Investment2017Absence of checks on the soundness of estimates FY 2017FLAT RATE10,00 %EUR- 83 928,980,00- 83 928,98
Wine - Investment2015Actions paid not included in Support Applicatoin - FY 2015ONE OFFEUR- 179 674,570,00- 179 674,57
Wine - Investment2016Actions paid not included in Support Applicatoin - FY 2016ONE OFFEUR- 477 034,00,00- 477 034,0
Wine - Investment2015Deficiency control of replacement of barrelsFLAT RATE5,00 %EUR- 20 659,110,00- 20 659,11
Wine - Investment2016Deficiency in control replacement barrels FY 2016FLAT RATE5,00 %EUR- 58 234,920,00- 58 234,92
Total ES: EUR -1 054 510,14 0,00 -1 054 510,14
FR Irregularities2015Application de sanction en cas d'intentionnalitéONE OFFEUR-1 915 954,75- 353 235,44-1 562 719,31
Irregularities2016Application de sanction en cas d'intentionnalitéONE OFFEUR-1 793 774,28- 469 942,73-1 323 831,55
Irregularities2017Application de sanction en cas d'intentionnalitéONE OFFEUR-1 435 446,920,00-1 435 446,92
Other Direct Aid - POSEI (2014+)2016Contrôles administratifs exhaustifs insuffisants FY2016FLAT RATE5,00 %EUR- 400 907,21- 44 784,16- 356 123,05
Other Direct Aid - POSEI (2014+)2017Contrôles administratifs exhaustifs insuffisants FY2017FLAT RATE5,00 %EUR- 448 715,160,00- 448 715,16
Other Direct Aid - POSEI (2014+)2018Contrôles administratifs exhaustifs insuffisants FY2018FLAT RATE5,00 %EUR- 453 373,170,00- 453 373,17
Wine - Promotion on third country markets2015Weakness in key controls on administrative checks and on OTSC. Absence of risk analysis.FLAT RATE7,00 %EUR- 177 746,450,00- 177 746,45
Wine - Promotion on third country markets2016Weakness in key controls on administrative checks and on OTSC. Absence of risk analysis.FLAT RATE7,00 %EUR- 205 303,65- 54 653,76- 150 649,89
Wine - Promotion on third country markets2017Weakness in key controls on administrative checks and on OTSC. Absence of risk analysis.FLAT RATE7,00 %EUR- 32 754,650,00- 32 754,65
Total FR: EUR -6 863 976,24 - 922 616,09 -5 941 360,15
GB Entitlements2016BPS calculation not finalised/notified - impact on BPS 2015ONE OFFEUR- 72 690,2- 416,38- 72 273,82
Entitlements2017BPS calculation not finalised/notified - impact on BPS 2016ONE OFFEUR- 125 141,46- 746,55- 124 394,91
Decoupled Direct Aids2016BPS calculation not finalised/notified - impact on greening 2015ONE OFFEUR- 34 726,5- 334,36- 34 392,14
Decoupled Direct Aids2017BPS calculation not finalised/notified - impact on greening 2016ONE OFFEUR- 53 070,85- 507,58- 52 563,27
Decoupled Direct Aids2016BPS calculation not finalised/notified - impact on YF 2015ONE OFFEUR- 621,92- 3,56- 618,36
Decoupled Direct Aids2017BPS calculation not finalised/notified - impact on YF 2016ONE OFFEUR- 105,86- 0,63- 105,23
Entitlements2016Checks of the active farmer status - impact on BPS 2015ONE OFFEUR- 30 199,79- 172,99- 30 026,8
Entitlements2017Checks of the active farmer status - impact on BPS 2016ONE OFFEUR- 110 341,24- 658,26- 109 682,98
Entitlements2018Checks of the active farmer status - impact on BPS 2017FLAT RATE2,00 %EUR- 53 909,190,00- 53 909,19
Decoupled Direct Aids2016Checks of the active farmer status - impact on greening 2015ONE OFFEUR- 13 142,45- 126,54- 13 015,91
Decoupled Direct Aids2017Checks of the active farmer status - impact on greening 2016ONE OFFEUR- 46 208,88- 441,95- 45 766,93
Decoupled Direct Aids2018Checks of the active farmer status - impact on greening 2017FLAT RATE2,00 %EUR- 22 855,890,00- 22 855,89
Decoupled Direct Aids2016Checks of the active farmer status - impact on YF 2015ONE OFFEUR- 107,06- 0,61- 106,45
Decoupled Direct Aids2017Checks of the active farmer status - impact on YF 2016ONE OFFEUR- 294,97- 1,76- 293,21
Decoupled Direct Aids2018Checks of the active farmer status - impact on YF 2017FLAT RATE2,00 %EUR- 44,170,00- 44,17
Entitlements2016Checks on the establishment of PE - impact on BPS 2015ONE OFFEUR- 23 659,93- 135,53- 23 524,4
Entitlements2017Checks on the establishment of PE - impact on BPS 2016ONE OFFEUR- 24 133,52- 143,97- 23 989,55
Entitlements2018Checks on the establishment of PE - impact on BPS 2017ONE OFFEUR- 24 851,630,00- 24 851,63
Decoupled Direct Aids2016Checks on the establishment of PE - impact on greening 2015ONE OFFEUR- 10 490,85- 101,01- 10 389,84
Decoupled Direct Aids2017Checks on the establishment of PE - impact on greening 2016ONE OFFEUR- 10 700,16- 102,34- 10 597,82
Decoupled Direct Aids2018Checks on the establishment of PE - impact on greening 2017ONE OFFEUR- 10 697,480,00- 10 697,48
Entitlements2017Weakness in the definition of Active Farmer- connected companies (BPS)ONE OFFEUR-1 028 190,680,00-1 028 190,68
Decoupled Direct Aids2017Weakness in the definition of Active Farmer- connected companies (Greening)ONE OFFEUR- 560 949,250,00- 560 949,25
Voluntary Coupled Support2017Weakness in the definition of Active Farmer- connected companies (VCS01)ONE OFFEUR- 40 185,210,00- 40 185,21
Voluntary Coupled Support2017Weakness in the definition of Active Farmer- connected companies (VCS02)ONE OFFEUR- 8 468,960,00- 8 468,96
Voluntary Coupled Support2017Weakness in the definition of Active Farmer- connected companies (VCS03)ONE OFFEUR- 96 566,250,00- 96 566,25
Decoupled Direct Aids2017Weakness in the definition of Active Farmer- connected companies (YFS)ONE OFFEUR- 3 447,830,00- 3 447,83
X1 Total GB: EUR - 2 405 802,18 - 3 894,02 - 2 401 908,16
HR Decoupled Direct Aids2017Incorrect calculation of administrative penaltiesONE OFFEUR- 84 324,370,00- 84 324,37
Decoupled Direct Aids2016Minimum control rate for on-the-spot checks not reachedONE OFFEUR- 35 671,360,00- 35 671,36
Decoupled Direct Aids2017Minimum control rate for on-the-spot checks not reachedONE OFFEUR- 35 671,360,00- 35 671,36
Decoupled Direct Aids2018Minimum control rate for on-the-spot checks not reachedONE OFFEUR- 35 671,360,00- 35 671,36
Decoupled Direct Aids2016Weak check of the recovery of payment entitlementsONE OFFEUR- 325,700,00- 325,70
Decoupled Direct Aids2017Weak check of the recovery of payment entitlementsONE OFFEUR- 580,060,00- 580,06
Decoupled Direct Aids2016Weak check of the status of the farmer (National Reserve)ONE OFFEUR- 8 016,980,00- 8 016,98
Decoupled Direct Aids2017Weak check of the status of the farmer (National Reserve)ONE OFFEUR- 7 212,340,00- 7 212,34
Decoupled Direct Aids2016Weak check of the status of the farmer (YFS)ONE OFFEUR- 18 828,550,00- 18 828,55
Decoupled Direct Aids2017Weak check of the status of the farmer (YFS)ONE OFFEUR- 25 056,290,00- 25 056,29
Decoupled Direct Aids2016Weak check of the value of payment entitlementsONE OFFEUR- 37 401,730,00- 37 401,73
Decoupled Direct Aids2017Weak check of the value of payment entitlementsONE OFFEUR- 103 179,760,00- 103 179,76
Decoupled Direct Aids2017Weak check on landscape featuresONE OFFEUR- 11 057,330,00- 11 057,33
Decoupled Direct Aids2018Weak check on landscape featuresONE OFFEUR- 4 390,010,00- 4 390,01
Decoupled Direct Aids2018Weak check on organic farmersONE OFFEUR- 3 480,590,00- 3 480,59
Decoupled Direct Aids2016Weak check on permanent grasslandONE OFFEUR- 1 445,370,00- 13 445,37
Decoupled Direct Aids2017Weak check on permanent grasslandONE OFFEUR- 5 470,770,00- 5 470,77
Decoupled Direct Aids2018Weak check on permanent grasslandONE OFFEUR- 4 819,930,00- 4 819,93
Decoupled Direct Aids2016Weak check on retroactive recoveryONE OFFEUR- 485 129,840,00- 485 129,84
Decoupled Direct Aids2017Weak check on retroactive recoveryONE OFFEUR- 277 225,310,00- 277 225,31
Decoupled Direct Aids2018Weak check on retroactive recoveryONE OFFEUR- 16 508,260,00- 16 508,26
Total HR: EUR -1 213 467,27 0,00 -1 213 467,27
HU Decoupled Direct Aids2016OTSC level insufficientONE OFFEUR- 484 117,640,00- 484 117,64
Decoupled Direct Aids2016OTSC quality EFA incorrectly identifiedONE OFFEUR- 11 871,240,00- 11 871,24
Decoupled Direct Aids2017OTSC quality EFA incorrectly identifiedONE OFFEUR- 2 572,840,00- 2 572,84
Total HU: EUR - 498 561,72 0,00 - 498 561,72
IE Decoupled Direct Aids2016Weaknesses LPISESTIMATED BY AMOUNTEUR-1 132 326,70,00-1 132 326,7
Decoupled Direct Aids2017Weaknesses LPISESTIMATED BY AMOUNTEUR-1 089 743,910,00-1 089 743,91
Decoupled Direct Aids2018Weaknesses LPISESTIMATED BY AMOUNTEUR- 633 104,480,00- 633 104,48
Total IE: EUR -2 855 175,09 0,00 -2 855 175,09
IT Decoupled Direct Aids2016Comprehensive correction for all findingsFLAT RATE2,00 %EUR-68 685 227,76- 166 676,14-68 518 551,62
Voluntary Coupled Support Area Based2016Comprehensive correction for all findingsFLAT RATE2,00 %EUR-3 690 568,93- 262,10-3 690 306,83
Decoupled Direct Aids2017Comprehensive correction for all findingsFLAT RATE2,00 %EUR-65 482 175,39- 5 116,81-65 477 058,61
Reimbursement of direct aids in relation to financial discipline2017Comprehensive correction for all findingsFLAT RATE2,00 %EUR- 754 110,44- 1,21- 754 109,23
Voluntary Coupled Support2017Comprehensive correction for all findingsFLAT RATE2,00 %EUR-3 811 472,84- 0,27-3 811 472,58
Decoupled Direct Aids2018Comprehensive correction for all findingsFLAT RATE2,00 %EUR- 830 757,67- 127,68- 830 629,95
Reimbursement of direct aids in relation to financial discipline2018Comprehensive correction for all findingsFLAT RATE2,00 %EUR- 730 282,20,00- 730 282,2
Voluntary Coupled Support2018Comprehensive correction for all findingsFLAT RATE2,00 %EUR- 111 868,120,00- 111 868,12
Cross-compliance2016Deficient I&R checks under SMR 7 - CY 2015FLAT RATE2,00 %EUR- 208 203,540,00- 208 203,54
Cross-compliance2017Deficient I&R checks under SMR 7 - CY 2015FLAT RATE2,00 %EUR- 4 103,380,00- 4 103,38
Cross-compliance2018Deficient I&R checks under SMR 7 - CY 2015FLAT RATE2,00 %EUR- 3 627,620,00- 3 627,62
Cross-compliance2017Deficient I&R checks under SMR 7 - CY 2016FLAT RATE2,00 %EUR- 315 751,970,00- 315 751,97
Cross-compliance2018Deficient I&R checks under SMR 7 - CY 2016FLAT RATE2,00 %EUR- 10 223,00,00- 10 223,0
Certification2017Known errors in the EAGFONE OFFEUR- 4 834,890,00- 4 834,89
Fruit and Vegetables - Operational programmes incl withdrawals2014OP 2013 - FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR-1 015 887,560,00-1 015 887,56
Fruit and Vegetables - Operational programmes incl withdrawals2015OP 2013 - FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR- 4 241,090,00- 4 241,09
Fruit and Vegetables - Operational programmes incl withdrawals2016OP 2013 - FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR- 1 110,780,00- 1 110,78
Fruit and Vegetables - Operational programmes incl withdrawals2014OP 2014 - FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR- 170 533,710,00- 170 533,71
Fruit and Vegetables - Operational programmes incl withdrawals2015OP 2014 - FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR-2 522 983,060,00-2 522 983,06
Fruit and Vegetables - Operational programmes incl withdrawals2016OP 2014 - FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR- 18 839,140,00- 18 839,14
Fruit and Vegetables - Operational programmes incl withdrawals2017OP 2014 - FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR3 889,40,003 889,4
Fruit and Vegetables - Operational programmes incl withdrawals2015OP 2015 -FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR- 933 283,90,00- 933 283,9
Fruit and Vegetables - Operational programmes incl withdrawals2016OP 2015 -FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR-2 963 312,690,00-2 963 312,69
Fruit and Vegetables - Operational programmes incl withdrawals2017OP 2015 -FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR- 3 941,190,00- 3 941,19
Fruit and Vegetables - Operational programmes incl withdrawals2016OP 2016 - FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR- 649 642,580,00- 649 642,58
Fruit and Vegetables - Operational programmes incl withdrawals2017OP 2016 - FV/2016/002/IT; shortcomings in F&V sector under the scheme of the Operational Programmes and recognition of Producer OrganisationsFLAT RATE5,00 %EUR-2 770 183,740,00-2 770 183,74
Total IT: EUR -155 693 277,79 - 172 184,21 -155 521 093,58
LU Decoupled Direct Aids2016Weak check on landscape features - CY2015 - BPSONE OFFEUR- 4 732,24- 11,14- 4 721,1
Decoupled Direct Aids2016Weak check on landscape features - CY2015 - greeningONE OFFEUR- 3 798,16- 8,94- 3 789,22
Decoupled Direct Aids2017Weak check on landscape features - CY2016 - BPSONE OFFEUR- 4 732,240,00- 4 732,24
Decoupled Direct Aids2017Weak check on landscape features - CY2016 - greeningONE OFFEUR- 2 604,220,00- 2 604,22
Decoupled Direct Aids2018Weak check on landscape features - CY2017 -BPSONE OFFEUR- 4 732,250,00- 4 732,25
Decoupled Direct Aids2018Weak check on landscape features - CY2017 - greeningONE OFFEUR- 19 678,140,00- 19 678,14
Decoupled Direct Aids2016Weak check on permanent grassland - CY2015 - BPSONE OFFEUR- 13 828,0- 32,57- 13 795,43
Decoupled Direct Aids2016Weak check on permanent grassland - CY2015 - greeningONE OFFEUR- 9 378,34- 22,09- 9 356,25
Decoupled Direct Aids2017Weaknesses in the on-the-spot checks - CY2016 - BPSONE OFFEUR- 11 228,50,00- 11 228,5
Decoupled Direct Aids2017Weaknesses in the on-the-spot checks - CY2016 - greeningONE OFFEUR- 5 175,150,00- 5 175,15
Decoupled Direct Aids2018Weaknesses in the on-the-spot checks - CY2017 -BPSONE OFFEUR- 9 785,030,00- 9 785,03
Decoupled Direct Aids2018Weaknesses in the on-the-spot checks - CY2017 - greeningONE OFFEUR- 4 021,650,00- 4 021,65
Total LU: EUR - 93 693,92 - 74,74 - 93 619,18
MT Voluntary Coupled Support2016VCS 1.4 - CY 2015ONE OFFEUR- 33 498,88- 712,48- 32 786,4
Voluntary Coupled Support2017VCS 1.4 - CY 2015ONE OFFEUR- 384,46- 47,09- 337,37
Voluntary Coupled Support2017VCS 1.4 - CY 2016ONE OFFEUR- 25 238,9- 902,82- 24 336,08
Voluntary Coupled Support2018VCS 1.4 - CY 2017ONE OFFEUR- 2 306,34- 824,30- 1 482,04
Voluntary Coupled Support2016VCS 1.5-1.6 - CY 2015FLAT RATE3,00 %EUR- 57 676,21- 88,01- 57 588,2
Voluntary Coupled Support2017VCS 1.5-1.6 - CY 2016FLAT RATE3,00 %EUR- 60 919,52- 185,76- 60 733,76
Voluntary Coupled Support2018VCS 1.5-1.6 - CY 2017FLAT RATE3,00 %EUR- 61 345,33- 41,35- 61 303,98
Cross-compliance2016CY 2015 - Beneficiaries subject to the requirements of SMR 6 and/or SMR 7 but not SMR 8 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervisionFLAT RATE2,00 %EUR- 3 035,820,00- 3 035,82
Cross-compliance2017CY 2016 - Beneficiaries subject to the requirements of SMR 7 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervisionFLAT RATE2,00 %EUR- 2 797,270,00- 2 797,27
Cross-compliance2018CY 2017 - Beneficiaries subject to the requirements of SMR 7 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervisionFLAT RATE2,00 %EUR- 2 853,82- 71,68- 2 782,14
Cross-compliance2016CY 2015 - Beneficiaries subject to the requirements of SMR 6 and/or SMR 7 and SMR 8 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 966,760,00- 966,76
Cross-compliance2017CY 2016 - Beneficiaries subject to combinations of SMRs - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 1 104,650,00- 1 104,65
Cross-compliance2018CY 2017 - Beneficiaries subject to combinations of SMRs - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 1 186,870,00- 1 186,87
Cross-compliance2016CY 2015 - Beneficiaries subject to the requirements of SMR 8 only - No evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 430,660,00- 430,66
Cross-compliance2017CY 2016 - Beneficiaries subject to the requirements of SMR 6 and/or SMR 8 and not subject to SMR 7 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 423,66- 0,91- 422,75
Cross-compliance2018CY 2017 - Beneficiaries subject to the requirements of SMR 6 and/or SMR 8 and not subject to SMR 7 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 412,07- 0,12- 411,95
Total MT: EUR - 254 581,22 - 2 874,52 - 251 706,7
NL Entitlements2016Deficiency regarding active farmer status - impact on BPSONE OFFEUR-2 627 743,090,00-2 627 743,09
Entitlements2017Deficiency regarding active farmer status - impact on BPSONE OFFEUR- 113 182,270,00- 113 182,27
Decoupled Direct Aids2016Deficiency regarding active farmer status - impact on GreeningONE OFFEUR-1 154 421,240,00-1 154 421,24
Decoupled Direct Aids2017Deficiency regarding active farmer status - impact on GreeningONE OFFEUR- 46 449,890,00- 46 449,89
Cross Compliance - Recoveries2016Deficiency regarding active farmer status - impact on RecoveriesONE OFFEUR559,360,00559,36
Irregularities2016Deficiency regarding active farmer status - impact on RecoveriesONE OFFEUR9 603,850,009 603,85
Voluntary Coupled Support2016Deficiency regarding active farmer status - impact on VCSONE OFFEUR- 66 023,740,00- 66 023,74
Decoupled Direct Aids2016Deficiency regarding active farmer status - impact on YFONE OFFEUR- 11 566,930,00- 11 566,93
Decoupled Direct Aids2017Insufficent control rateONE OFFEUR- 39 998,520,00- 39 998,52
Decoupled Direct Aids2018LPIS and other weaknessesONE OFFEUR- 166 919,540,00- 166 919,54
Temporary and exceptional support measures2016Recovery of undue payments R. 2015/1853 (Article 1)ONE OFFEUR-2 515 000,00,00-2 515 000,0
Decoupled Direct Aids2017Weaknesses in retroactive recoveriesONE OFFEUR- 1 888,980,00- 1 888,98
Decoupled Direct Aids2016Weaknesses in the LPISONE OFFEUR- 10 405,190,00- 10 405,19
Decoupled Direct Aids2017Weaknesses in the LPISONE OFFEUR- 15 624,740,00- 15 624,74
Decoupled Direct Aids2016Weaknesses in the LPISONE OFFEUR- 5 202,60,00- 5 202,6
Decoupled Direct Aids2016Weaknesses in the OTSC - check of maintenanceONE OFFEUR- 28 396,880,00- 28 396,88
Decoupled Direct Aids2017Weaknesses in the OTSC - check of maintenanceONE OFFEUR- 50 082,790,00- 50 082,79
Decoupled Direct Aids2016Weaknesses in the OTSC - remote sensingONE OFFEUR- 32 382,330,00- 32 382,33
Decoupled Direct Aids2017Weaknesses in the OTSC - remote sensingONE OFFEUR- 62 115,670,00- 62 115,67
Voluntary Coupled Support2018Weaknesses in the set-up and control of Bovine premiaONE OFFEUR- 242 859,950,00- 242 859,95
Voluntary Coupled Support2016Weaknesses in the set-up and control of Bovine premiaONE OFFEUR- 292 314,10,00- 292 314,1
Voluntary Coupled Support2017Weaknesses in the set-up and control of Bovine premiaONE OFFEUR- 203 767,610,00- 203 767,61
Voluntary Coupled Support2018Weaknesses in the set-up and control of Ovine premiaONE OFFEUR- 311 190,350,00- 311 190,35
Voluntary Coupled Support2016Weaknesses in the set-up and control of Ovine premiaONE OFFEUR- 245 664,730,00- 245 664,73
Voluntary Coupled Support2017Weaknesses in the set-up and control of Ovine premiaONE OFFEUR- 216 663,180,00- 216 663,18
Decoupled Direct Aids2018Weaknesses in VCS animals - effect on allocation of entitlements on BPS, Greening and young farmer scheme paymentsONE OFFEUR- 732 338,890,00- 732 338,89
Decoupled Direct Aids2016Weaknesses in VCS animals - effect on allocation of entitlements on BPS paymentsONE OFFEUR- 167 677,350,00- 167 677,35
Decoupled Direct Aids2017Weaknesses in VCS animals - effect on allocation of entitlements on BPS paymentsONE OFFEUR- 335 906,850,00- 335 906,85
Decoupled Direct Aids2016Weaknesses in VCS animals - effect on allocation of entitlements on greening paymentsONE OFFEUR- 72 621,060,00- 72 621,06
Decoupled Direct Aids2017Weaknesses in VCS animals - effect on allocation of entitlements on greening paymentsONE OFFEUR- 145 212,530,00- 145 212,53
Decoupled Direct Aids2016Weaknesses in VCS animals - effect on allocation of entitlements on young farmer scheme paymentsONE OFFEUR- 24 208,330,00- 24 208,33
Decoupled Direct Aids2017Weaknesses in VCS animals - effect on allocation of entitlements on young farmer scheme paymentsONE OFFEUR- 23 805,290,00- 23 805,29
Total NL: EUR -9 951 471,41 0,00 -9 951 471,41
RO Certification2016Known errors in the EAGFONE OFFEUR- 76,270,00- 76,27
Certification2016MLE in the EAGFESTIMATED BY AMOUNTEUR-17 323 228,52- 440,82-17 322 787,7
Total RO: EUR -17 323 304,79 - 440,82 -17 322 863,97
SE Voluntary Coupled Support2017Weakness in the key control concerning the checks on the correctness of the aid calculation including the application of sanctions VCS CY2016FLAT RATE3,00 %EUR-2 618 729,82- 5 697,92-2 613 031,9
Voluntary Coupled Support2018Weakness in the key control concerning the checks on the correctness of the aid calculation including the application of sanctions VCS CY2017FLAT RATE3,00 %EUR-2 610 686,250,00-2 610 686,25
Voluntary Coupled Support2016Weakness in the key control in respect of administrative checks to establish the eligibility of the aid- correctness of the final payment CY2015 for VCSONE OFFEUR- 862 615,070,00- 862 615,07
Entitlements2017Weakness in the key control in respect of the administrative checks to establish access to the aid claimed regarding active farmer status CY2016ESTIMATED BY PERCENTAGE0,58 %EUR- 96 196,72- 3 374,63- 92 822,09
Greening Payment2017Weakness in the key control in respect of the administrative checks to establish access to the aid claimed regarding active farmer status CY2016ESTIMATED BY PERCENTAGE0,58 %EUR- 51 533,13- 47 356,1- 4 177,03
Voluntary Coupled Support2017Weakness in the key control in respect of the administrative checks to establish access to the aid claimed regarding active farmer status CY2016ESTIMATED BY PERCENTAGE0,58 %EUR- 29 660,360,00- 29 660,36
Young farmers scheme2017Weakness in the key control in respect of the administrative checks to establish access to the aid claimed regarding active farmer status CY2016ESTIMATED BY PERCENTAGE0,58 %EUR- 2 826,930,00- 2 826,93
Voluntary Coupled Support2016Weakness in the the key control concerning the checks on the correctness of the aid calculation including the application of sanctions VCS CY 2015FLAT RATE3,00 %EUR-2 560 986,85- 25 878,45-2 535 108,4
Voluntary Coupled Support2017Weakness in the the key control in respect of administrative checks to establish the eligibility of the aid- correctness of the final payment CY2016 for VCSONE OFFEUR- 160 270,350,00- 160 270,35
Total SE: EUR -8 993 505,48 - 82 307,1 -8 911 198,38
Currency Amount Deductions Financial Impact
EUR -210 613 733,99-1 184 862,42-209 428 871,57

Budget Item: 6711

Member State Measure FY Reason Type Correction % Currency Amount Deductions Financial Impact
BE Clearance of Accounts - Financial Clearance2017Substantial error on sampling (Annex 15 of CB report)ONE OFFEUR- 3 869,020,00- 3 869,02
Clearance of Accounts - Financial Clearance2017Substantial error on sampling (annex 14 of CB report)ONE OFFEUR- 205,570,00- 205,57
Total BE: EUR - 4 074,59 0,00 - 4 074,59
BG Cross-compliance2016Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2015FLAT RATE5,00 %EUR- 223 326,63- 8 009,67- 215 316,96
Cross-compliance2017Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2015FLAT RATE5,00 %EUR- 834,400,00- 834,40
Cross-compliance2018Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2015FLAT RATE5,00 %EUR- 293,610,00- 293,61
Cross-compliance2017Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2016FLAT RATE5,00 %EUR- 184 118,4- 688,70- 183 429,7
Cross-compliance2018Deficient on-the-spot checks of animal-related SMRs - Deficient reporting - CY 2016FLAT RATE5,00 %EUR- 8 204,10,00- 8 204,1
Total BG: EUR - 416 777,14 - 8 698,37 - 408 078,77
CZ Rural Development EAFRD measures subject to IACS2016M10: double financingONE OFFEUR- 7 674,670,00- 7 674,67
Rural Development EAFRD measures subject to IACS2017M10: double financingONE OFFEUR- 7 484,020,00- 7 484,02
Rural Development EAFRD measures subject to IACS2017M14: advance notification of on-the-spot checks - FY2017FLAT RATE5,00 %EUR- 14 191,540,00- 14 191,54
Rural Development EAFRD measures subject to IACS2018M14: advance notification of on-the-spot checks - FY2018 and FY2019FLAT RATE5,00 %EUR- 15 511,620,00- 15 511,62
Rural Development EAFRD measures subject to IACS2019M14: advance notification of on-the-spot checks - FY2018 and FY2019FLAT RATE5,00 %EUR- 5 405,860,00- 5 405,86
Total CZ: EUR - 50 267,71 0,00 - 50 267,71
DE Certification2017Differences in debts' reconciliation EAFRDONE OFFEUR- 9 497,410,00- 9 497,41
Rural Development EAFRD forestry measures2016Double-financing between M8 (first afforestation) and EFA greening - FY 2016.ONE OFFEUR- 10 543,250,00- 10 543,25
Rural Development EAFRD forestry measures2017Double-financing between M8 (first afforestation) and EFA greening - FY 2017.ONE OFFEUR- 8 997,060,00- 8 997,06
Rural Development EAFRD forestry measures2018Double-financing between M8 (first afforestation) and EFA greening - FY 2018.ONE OFFEUR- 8 919,870,00- 8 919,87
Clearance of Accounts - Financial Clearance2017Financial errors found in substantive testing on EAFRD (annexes 11, 7a, 7b) of CB reportONE OFFEUR- 35 267,330,00- 35 267,33
Certification2017Individual errors in EAFRDONE OFFEUR- 7 618,010,00- 7 618,01
Total DE: EUR - 80 842,93 0,00 - 80 842,93
ES Rural Development EAFRD investment - private beneficiaries2018M121: 5 % flat rate correction (transitional expenditure on M04 in FY2018)FLAT RATE5,00 %EUR- 2 447,560,00- 2 447,56
Rural Development EAFRD Axis 1+3 - Investment orientated measures (2007-2013)2013M121: Weakness in KC (Verification of eligibility - 5 %) and lack of Ancillary Control (Audit trail - 2 %) => 5 % flat rate correction (FY: 2013)FLAT RATE5,00 %EUR- 24 078,530,00- 24 078,53
Rural Development EAFRD Investment - private beneficiaries2014M121: Weakness in KC (Verification of eligibility - 5 %) and lack of Ancillary Control (Audit trail - 2 %) => 5 % flat rate correction (FY: 2014)FLAT RATE5,00 %EUR- 29 716,690,00- 29 716,69
Rural Development EAFRD investment - private beneficiaries2016M121: Weakness in KC (Verification of eligibility - 5 %) and lack of Ancillary Control (Audit trail - 2 %) => 5 % flat rate correction (FY: 2016)FLAT RATE5,00 %EUR- 576 669,130,00- 576 669,13
Rural Development EAFRD Measures with flat-rate support2016M121: Weakness in KC (Verification of eligibility - 5 %) and lack of Ancillary Control (Audit trail - 2 %) => 5 % flat rate correction. FYs 2016, 2017 [transitional expenditure on M06]FLAT RATE5,00 %EUR- 23 343,350,00- 23 343,35
Rural Development EAFRD Measures with flat-rate support2017M121: Weakness in KC (Verification of eligibility - 5 %) and lack of Ancillary Control (Audit trail - 2 %) => 5 % flat rate correction. FYs 2016, 2017 [transitional expenditure on M06]FLAT RATE5,00 %EUR- 3 889,090,00- 3 889,09
Rural Development EAFRD investment - private beneficiaries2015M121: Weakness in KC (Verification of eligibility - 5 %) and lack of Ancillary Control (Audit trail - 2 %) => 5 % flat rate correction (FYs: 2015-2016-2017, incl. transitional expenditure on M04) [for FY 2016 and 2017: overlap with exp. on M4.1]FLAT RATE5,00 %EUR- 35 782,980,00- 35 782,98
Rural Development EAFRD investment - private beneficiaries2016M121: Weakness in KC (Verification of eligibility - 5 %) and lack of Ancillary Control (Audit trail - 2 %) => 5 % flat rate correction (FYs: 2015-2016-2017, incl. transitional expenditure on M04) [for FY 2016 and 2017: overlap with exp. on M4.1]FLAT RATE5,00 %EUR- 58 528,570,00- 58 528,57
Rural Development EAFRD investment - private beneficiaries2017M121: Weakness in KC (Verification of eligibility - 5 %) and lack of Ancillary Control (Audit trail - 2 %) => 5 % flat rate correction (FYs: 2015-2016-2017, incl. transitional expenditure on M04) [for FY 2016 and 2017: overlap with exp. on M4.1]FLAT RATE5,00 %EUR- 50 965,720,00- 50 965,72
Rural Development EAFRD Axis 1+3 - Investment orientated measures (2007-2013)2013M123: Lack of Ancillary Control (Audit trail) => 2 % flat rate correction (FY: 2013)FLAT RATE2,00 %EUR- 24 354,540,00- 24 354,54
Rural Development EAFRD Investment - private beneficiaries2014M123: Lack of Ancillary Control (Audit trail) => 2 % flat rate correction (FY: 2014)FLAT RATE2,00 %EUR- 6 109,940,00- 6 109,94
Rural Development EAFRD investment - private beneficiaries2015M123: Lack of Ancillary Control (Audit trail) => 2 % flat rate correction (FYs: 2015-2016-2017)FLAT RATE2,00 %EUR- 267 943,180,00- 267 943,18
Rural Development EAFRD investment - private beneficiaries2016M123: Lack of Ancillary Control (Audit trail) => 2 % flat rate correction (FYs: 2015-2016-2017)FLAT RATE2,00 %EUR- 315 906,150,00- 315 906,15
Total ES: EUR -1 419 735,43 0,00 -1 419 735,43
FR Rural Development EAFRD Axis 1+3 - Investment orientated measures (2007-2013)2012Absence of the key control ‘In-situ visits carried out for all investment operations to verify the realisation of the investment’FLAT RATE10,00 %EUR- 5 560,80,00- 5 560,8
Rural Development EAFRD Axis 1+3 - Investment orientated measures (2007-2013)2013Absence of the key control ‘In-situ visits carried out for all investment operations to verify the realisation of the investment’FLAT RATE10,00 %EUR- 6 579,040,00- 6 579,04
Rural Development EAFRD Investment - public beneficiaries2014Absence of the key control ‘In-situ visits carried out for all investment operations to verify the realisation of the investment’FLAT RATE10,00 %EUR- 4 875,0- 2 437,5- 2 437,5
Rural Development EAFRD Measures with flat-rate support2015Absence of the key control ‘In-situ visits carried out for all investment operations to verify the realisation of the investment’FLAT RATE10,00 %EUR- 28 776,35- 28 776,350,00
Rural Development EAFRD investment - public beneficiaries2015Deficiencies in the execution of the key control ‘Appropriate evaluation of the reasonableness of costs’FLAT RATE5,00 %EUR- 3 506,13- 3 506,130,00
Rural Development EAFRD Investment - public beneficiaries2014deficiency in the execution of the key controls ‘Verification that public procurement procedures are in compliance with national and Union regulations’ and ‘Appropriate evaluation of the reasonableness of costs’FLAT RATE5,00 %EUR- 73 581,420,00- 73 581,42
Rural Development EAFRD investment - private beneficiaries2015deficiency in the execution of the key controls ‘Verification that public procurement procedures are in compliance with national and Union regulations’ and ‘Appropriate evaluation of the reasonableness of costs’FLAT RATE5,00 %EUR- 162 273,81- 161 526,67- 747,14
Rural Development EAFRD investment - public beneficiaries2015deficiency in the execution of the key controls ‘Verification that public procurement procedures are in compliance with national and Union regulations’ and ‘Appropriate evaluation of the reasonableness of costs’FLAT RATE5,00 %EUR- 797 732,62- 797 732,620,00
Rural Development EAFRD Measures with flat-rate support2015deficiency in the execution of the key controls ‘Verification that public procurement procedures are in compliance with national and Union regulations’ and ‘Appropriate evaluation of the reasonableness of costs’FLAT RATE5,00 %EUR- 265 184,89- 265 184,890,00
Rural Development EAFRD investment - private beneficiaries2016deficiency in the execution of the key controls ‘Verification that public procurement procedures are in compliance with national and Union regulations’ and ‘Appropriate evaluation of the reasonableness of costs’FLAT RATE5,00 %EUR- 147 822,7- 86 087,35- 61 735,35
Rural Development EAFRD investment - public beneficiaries2016deficiency in the execution of the key controls ‘Verification that public procurement procedures are in compliance with national and Union regulations’ and ‘Appropriate evaluation of the reasonableness of costs’FLAT RATE5,00 %EUR- 560 112,8- 363 185,54- 196 927,26
Rural Development EAFRD Measures with flat-rate support2016deficiency in the execution of the key controls ‘Verification that public procurement procedures are in compliance with national and Union regulations’ and ‘Appropriate evaluation of the reasonableness of costs’FLAT RATE5,00 %EUR- 110 309,1- 71 526,07- 38 783,03
Rural Development EAFRD investment - private beneficiaries2017deficiency in the execution of the key controls ‘Verification that public procurement procedures are in compliance with national and Union regulations’ and ‘Appropriate evaluation of the reasonableness of costs’FLAT RATE5,00 %EUR- 35 929,52- 24 437,81- 11 491,71
Rural Development EAFRD Measures with flat-rate support2016OTSC not performed before the final payment - Follow up of RD3/2014/012/FRFLAT RATE2,00 %EUR- 7 141,250,00- 7 141,25
Rural Development EAFRD Measures with flat-rate support2017OTSC not performed before the final payment - Follow up of RD3/2014/012/FRFLAT RATE2,00 %EUR- 86 868,350,00- 86 868,35
Rural Development EAFRD Measures with flat-rate support2018OTSC not performed before the final payment - Follow up of RD3/2014/012/FRFLAT RATE2,00 %EUR- 329,600,00- 329,60
Rural Development EAFRD investment - private beneficiaries2016Reasonableness of the costs not assessed with the required qualityFLAT RATE2,66 %EUR- 458 109,26- 457 977,66- 131,60
Rural Development EAFRD investment - private beneficiaries2017Reasonableness of the costs not assessed with the required qualityFLAT RATE2,66 %EUR- 253 541,50,00- 253 541,5
Rural Development EAFRD investment - private beneficiaries2016Reasonableness of the costs not assessed with the required qualityFLAT RATE4,14 %EUR- 913 484,71- 820 627,41- 92 857,3
Rural Development EAFRD investment - private beneficiaries2017Reasonableness of the costs not assessed with the required qualityFLAT RATE4,14 %EUR- 129 621,33- 64 754,26- 64 867,07
Total FR: EUR -4 051 340,18 -3 147 760,26 - 903 579,92
GB Rural Development EAFRD measures subject to IACS2018Checks of the active farmer status - impact on RD 2017FLAT RATE2,00 %EUR- 1 313,520,00- 1 313,52
Rural Development EAFRD measures subject to IACS2017Weakness in the definition of Active Farmer- connected companies (Natural constraints)ONE OFFEUR- 81 774,790,00- 81 774,79
Total GB: EUR - 83 088,31 0,00 - 83 088,31
HU Rural Development EAFRD measures subject to IACS2017No application of reductions related with late submission of payment claims (M14 of RDP 2014-2020) - FY2017FLAT RATE5,00 %EUR-1 080 678,640,00-1 080 678,64
Rural Development EAFRD measures subject to IACS2016No verification of all animals during the on-the-spot-checks (Measure 215 of RDP 2007-2013); No application of reductions related with late submission of payment claims (Measure 215 of RDP 2007-2013; M14 of RDP 2014-2020) - FY2016FLAT RATE5,00 %EUR-1 011 685,760,00-1 011 685,76
Rural Development EAFRD Axis 2 (2007-2013, area related measures)2014Sanction system in the last year of RD programme – Warning letter (Measure 214 of RDP 2007-2013) - CY 2013FLAT RATE10,00 %EUR- 20 339,710,00- 20 339,71
Total HU: EUR -2 112 704,11 0,00 -2 112 704,11
IE Rural Development EAFRD measures subject to IACS2016Weaknesses LPISESTIMATED BY AMOUNTEUR- 483 545,110,00- 483 545,11
Rural Development EAFRD measures subject to IACS2017Weaknesses LPISESTIMATED BY AMOUNTEUR- 466 516,590,00- 466 516,59
Rural Development EAFRD measures subject to IACS2018Weaknesses LPISESTIMATED BY AMOUNTEUR- 284 061,570,00- 284 061,57
Total IE: EUR -1 234 123,27 0,00 -1 234 123,27
IT Cross-compliance2016Deficient I&R checks under SMR 7 - CY 2015FLAT RATE2,00 %EUR- 7 296,99- 66,24- 7 230,75
Cross-compliance2017Deficient I&R checks under SMR 7 - CY 2015FLAT RATE2,00 %EUR- 2 923,660,00- 2 923,66
Cross-compliance2018Deficient I&R checks under SMR 7 - CY 2015FLAT RATE2,00 %EUR- 99,120,00- 99,12
Cross-compliance2017Deficient I&R checks under SMR 7 - CY 2016FLAT RATE2,00 %EUR- 27 283,360,00- 27 283,36
Cross-compliance2018Deficient I&R checks under SMR 7 - CY 2016FLAT RATE2,00 %EUR- 2 117,20,00- 2 117,2
Certification2017Errors in the EAFRDONE OFFEUR- 29 136,27- 319,58- 28 816,69
Certification2017Known error (EAFRD)ONE OFFEUR- 121 884,940,00- 121 884,94
Rural Development EAFRD Investment - public beneficiaries2014Public Procurement Procedures not properly checked (artificial splitting)ONE OFFEUR- 431 400,00,00- 431 400,0
Rural Development EAFRD investment - private beneficiaries2015Public Procurement Procedures not properly checked (artificial splitting)ONE OFFEUR- 330 045,020,00- 330 045,02
Rural Development EAFRD investment - private beneficiaries2016Public Procurement Procedures not properly checked (artificial splitting)ONE OFFEUR- 15 123,950,00- 15 123,95
Rural Development EAFRD Investment - public beneficiaries2014Public Procurement Procedures not properly checked (Awarding decision not properly justified)ONE OFFEUR- 44 449,580,00- 44 449,58
Rural Development EAFRD investment - public beneficiaries2015Public Procurement Procedures not properly checked (Awarding decision not properly justified)ONE OFFEUR- 28 584,530,00- 28 584,53
Rural Development EAFRD investment - public beneficiaries2016Public Procurement Procedures not properly checked (Awarding decision not properly justified)ONE OFFEUR- 7 895,280,00- 7 895,28
Total IT: EUR -1 048 239,9 - 385,82 -1 047 854,08
LT Rural Development EAFRD investment - private beneficiaries2016M121 + M123- Scope of on-the-spot checks and checks on reasonableness of costsFLAT RATE5,00 %EUR-1 109 209,770,00-1 109 209,77
Rural Development EAFRD Measures with flat-rate support2015M311 - Ineligible car costs (-5 % flat-rate correction from enquiry RD1/2014/834/LT)ONE OFFEUR- 25 892,39- 1 294,62- 24 597,77
Rural Development EAFRD Measures with flat-rate support2016M311 - Reasonableness of costsFLAT RATE5,00 %EUR- 7 070,440,00- 7 070,44
Rural Development EAFRD Measures with flat-rate support2016M312 - Scope of on-the-spot checks and checks on reasonableness of costsFLAT RATE5,00 %EUR- 297 843,380,00- 297 843,38
Total LT: EUR -1 440 015,98 - 1 294,62 -1 438 721,36
LU Rural Development EAFRD measures subject to IACS2016EAFRD M10 and M11: Insufficient quantity of on-the-spot checksONE OFFEUR- 25 037,520,00- 25 037,52
Rural Development EAFRD measures subject to IACS2017EAFRD M10 and M11: Insufficient quantity of on-the-spot checksONE OFFEUR- 4 245,010,00- 4 245,01
Rural Development EAFRD measures subject to IACS2016M10 and M11: Absence of on-the-spot checksFLAT RATE5,00 %EUR- 27 749,530,00- 27 749,53
Rural Development EAFRD measures subject to IACS2017M10 and M11: Absence of on-the-spot checksFLAT RATE5,00 %EUR- 55 330,540,00- 55 330,54
Rural Development EAFRD measures subject to IACS2018M10 and M11: Absence of on-the-spot checksFLAT RATE5,00 %EUR- 61 198,870,00- 61 198,87
Rural Development EAFRD measures subject to IACS2016M11: payments executed before the completion of the administrative checksONE OFFEUR- 962,050,00- 962,05
Rural Development EAFRD measures subject to IACS2017M11: payments executed before the completion of the administrative checksONE OFFEUR- 263,510,00- 263,51
Rural Development EAFRD investment - public beneficiaries2016M20: weak checks on the eligibility of the costsONE OFFEUR- 24 360,560,00- 24 360,56
Rural Development EAFRD investment - public beneficiaries2017M20: weak checks on the eligibility of the costsONE OFFEUR- 38 435,810,00- 38 435,81
Rural Development EAFRD Measures with flat-rate support2017M6.1: weak checks on the eligibility of the project (Business Plans)ONE OFFEUR- 47 340,00,00- 47 340,0
Rural Development EAFRD Measures with flat-rate support2018M6.1: weak checks on the eligibility of the project (Business Plans)ONE OFFEUR- 11 835,00,00- 11 835,0
Total LU: EUR - 296 758,4 0,00 - 296 758,4
MT Rural Development EAFRD investment - private beneficiaries2015Appropriate evaluation of the reasonableness of costsFLAT RATE5,00 %EUR- 639,69- 199,58- 440,11
Rural Development EAFRD Leader2015Appropriate evaluation of the reasonableness of costsFLAT RATE5,00 %EUR- 264,48- 82,52- 181,96
Rural Development EAFRD investment - private beneficiaries2016Appropriate evaluation of the reasonableness of costsFLAT RATE5,00 %EUR- 30 407,390,00- 30 407,39
Rural Development EAFRD Leader2016Appropriate evaluation of the reasonableness of costsFLAT RATE5,00 %EUR- 253,800,00- 253,80
Rural Development EAFRD Measures with flat-rate support2016Appropriate evaluation of the reasonableness of costsFLAT RATE5,00 %EUR- 4 212,630,00- 4 212,63
Rural Development EAFRD investment - private beneficiaries2015Performance of OTSC of sufficient qualityONE OFFEUR- 64 128,03- 1 000,4- 63 127,63
Rural Development EAFRD investment - private beneficiaries2016Performance of OTSC of sufficient qualityONE OFFEUR- 41 890,440,00- 41 890,44
Cross-compliance2016CY 2015 - Beneficiaries subject to the requirements of SMR 6 and/or SMR 7 but not SMR 8 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervisionFLAT RATE2,00 %EUR- 144,270,00- 144,27
Cross-compliance2017CY 2016 - Beneficiaries subject to the requirements of SMR 7 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervisionFLAT RATE2,00 %EUR- 79,810,00- 79,81
Cross-compliance2018CY 2017 - Beneficiaries subject to the requirements of SMR 7 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervisionFLAT RATE2,00 %EUR- 88,000,00- 88,00
Cross-compliance2016CY 2015 - Beneficiaries subject to the requirements of SMR 6 and/or SMR 7 and SMR 8 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 84,040,00- 84,04
Cross-compliance2017CY 2016 - Beneficiaries subject to combinations of SMRs - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 75,050,00- 75,05
Cross-compliance2018CY 2017 - Beneficiaries subject to combinations of SMRs - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 73,910,00- 73,91
Cross-compliance2016CY 2015 - Beneficiaries subject to the requirements of SMR 8 only - No evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 400,380,00- 400,38
Cross-compliance2017CY 2016 - Beneficiaries subject to the requirements of SMR 6 and/or SMR 8 and not subject to SMR7 - Deficient on-the-spot checks of animal-related SMRs and/or no evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 465,510,00- 465,51
Cross-compliance2018CY 2017 - Beneficiaries subject to the requirements of SMR 6 and/or SMR 8 and not subject to SMR 7 - Deficient on-the-spot checks of animal-related SMRs and no evidence of adequate supervision proceduresFLAT RATE2,00 %EUR- 445,900,00- 445,90
Total MT: EUR - 143 653,33 - 1 282,5 - 142 370,83
NL Rural Development EAFRD Risk management2016Deficiency regarding active farmer status - impact on RDONE OFFEUR- 19 981,450,00- 19 981,45
Rural Development EAFRD measures subject to IACS2018LPIS and other weaknessesONE OFFEUR- 29 502,310,00- 29 502,31
Rural Development EAFRD measures subject to IACS2017Weaknesses in the LPIS (EAFRD)ONE OFFEUR- 805 547,410,00- 805 547,41
Total NL: EUR - 855 031,17 0,00 - 855 031,17
PT Rural Development EAFRD forestry measures2016Double-financing between M8 (first afforestation) and EFA greening - FY 2016.ONE OFFEUR- 45 335,01- 166,16- 45 168,85
Rural Development EAFRD forestry measures2017Double-financing between M8 (first afforestation) and EFA greening - FY 2017.ONE OFFEUR- 62 829,110,00- 62 829,11
Rural Development EAFRD forestry measures2018Double-financing between M8 (first afforestation) and EFA greening - FY 2018 + FY 2019ONE OFFEUR- 64 068,90,00- 64 068,9
Rural Development EAFRD forestry measures2019Double-financing between M8 (first afforestation) and EFA greening - FY 2018 + FY 2019ONE OFFEUR- 2 485,970,00- 2 485,97
Total PT: EUR - 174 718,99 - 166,16 - 174 552,83
RO Certification2017Individual errors in EAFRD.ONE OFFEUR- 54 870,220,00- 54 870,22
Total RO: EUR - 54 870,22 0,00 - 54 870,22
SE Rural Development EAFRD investment - private beneficiaries20151 KC - Selection and appraisal of projects applicationsFLAT RATE5,00 %EUR- 45 164,84- 45 164,840,00
Rural Development EAFRD investment - private beneficiaries20161 KC - Selection and appraisal of projects applicationsFLAT RATE5,00 %EUR- 3 966,680,00- 3 966,68
Rural Development EAFRD investment - private beneficiaries2017KC Appropriate checks to ensure that investment/project/application fulfil all eligibility criteria as laid down in the EU legislation and the eligibility criteria as laid down in the RDP of the Member State or region (M04.4)ONE OFFEUR- 15 197,090,00- 15 197,09
Rural Development EAFRD investment - private beneficiaries2018KC Appropriate checks to ensure that investment/project/application fulfil all eligibility criteria as laid down in the EU legislation and the eligibility criteria as laid down in the RDP of the Member State or region (M04.4)ONE OFFEUR- 21 238,150,00- 21 238,15
Rural Development EAFRD investment - private beneficiaries2015Selection and appraisal of projects/applications (M121)FLAT RATE5,00 %EUR- 9 197,44- 9 197,440,00
Rural Development EAFRD investment - private beneficiaries2016Selection and appraisal of projects/applications (M121)FLAT RATE5,00 %EUR- 300,26- 300,260,00
Rural Development EAFRD investment - private beneficiaries2016Transitional expenditure (M121)FLAT RATE5,00 %EUR- 185,670,00- 185,67
Rural Development EAFRD investment - private beneficiaries2016Transitional expenditure (M216)FLAT RATE5,00 %EUR- 949,820,00- 949,82
Rural Development EAFRD investment - private beneficiaries2016weakness in reasonableness of costs to be covered by public procurement procedures (M216)FLAT RATE5,00 %EUR- 3 685,070,00- 3 685,07
Rural Development EAFRD measures subject to IACS2017Weakness in the key control in respect of the administrative checks to establish access to the aid claimed regarding active farmer status CY2016ESTIMATED BY PERCENTAGE0,58 %EUR- 1 824,630,00- 17 824,63
Total SE: EUR - 117 709,65 - 54 662,54 - 63 047,11
SK Rural Development EAFRD forestry measures2016M8.3 and M8.4: deficiency in key control 'Selection and appraisal of projects' - CY2015 and 2016 - FY2016 and 2017FLAT RATE5,00 %EUR- 214 806,09- 168 268,94- 46 537,15
Rural Development EAFRD forestry measures2017M8.3 and M8.4: deficiency in key control 'Selection and appraisal of projects' - CY2015 and 2016 - FY2016 and 2017FLAT RATE5,00 %EUR-1 326 332,650,00-1 326 332,65
Total SK: EUR -1 541 138,74 - 168 268,94 -1 372 869,8
Currency Amount Deductions Financial Impact
EUR -15 125 090,05-3 382 519,21-11 742 570,84