Commission Implementing Decision (EU) 2020/1675 of 11 November 2020 amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance)
EU Decision 2020/1675 · Adopted 11 November 2020 · Extends to United Kingdom
Commission Implementing Decision (EU) 2020/1675
of 11 November 2020
amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1257/2013 of the European Parliament and of the Council of 20 November 2013 on ship recycling and amending Regulation (EC) No 1013/2006 and Directive 2009/16/ECf1, and in particular Article 16 thereof,
Whereas:
(1)
Article 6(2) of Regulation (EU) No 1257/2013 requires ship owners to ensure that ships destined to be recycled are only recycled at ship recycling facilities included in the European List of ship recycling facilities published pursuant to Article 16 of that Regulation.
(2)
The European List is set out in Commission Implementing Decision (EU) 2016/2323f2.
(3)
Denmark has informed the Commission that a ship recycling facilityf3 located in its territory has been authorised by the competent authority, in accordance with Article 14 of Regulation (EU) No 1257/2013. Denmark has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility.
(4)
Norway has informed the Commission that a ship recycling facilityf4 located in its territory has been authorised by the competent authority, in accordance with Article 14 of Regulation (EU) No 1257/2013. Norway has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility.
(5)
The authorisation of a ship recycling facility located in Lithuaniaf5 expired on 17 March 2020 and the Commission has received information from Lithuania that the facility does not continue ship recycling activities. The European List should therefore be updated to remove that facility.
(6)
The authorisation of a ship recycling facility located in Latviaf6 expired on 11 June 2020 and the Commission has received information from Latvia that the authorisation granted to that facility to conduct ship recycling has not been renewed. Therefore, the facility no longer meets the requirements set out in Article 13(1)(a) of Regulation (EU) No 1257/2013. The European List should therefore be updated to remove that facility.
(7)
The authorisation of a ship recycling facility located in the United Kingdomf7 expired on 2 July 2020 and the Commission has not received information from the United Kingdom that the authorisation granted to that facility to conduct ship recycling has been renewed. Therefore, the facility no longer meets the requirements set out in Article 13(1)(a) of Regulation (EU) No 1257/2013. The European List should therefore be updated to remove that facility.
(8)
The authorisation of another ship recycling facility located in the United Kingdomf8 expired on 6 October 2020 and the Commission has received information from the United Kingdom that the authorisation granted to that facility to conduct ship recycling has been renewed prior to its expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. However, following the withdrawal of the United Kingdom from the Union on 1 February 2020, ships flying the flag of a Member State of the European Union can no longer be recycled at that facility after the end of the transition period provided for under the Withdrawal Agreement on 31 December 2020. The date of expiry of the inclusion of that facility in the European List should therefore be updated accordingly, i.e. until 31 December 2020.
(9)
The authorisation of another ship recycling facility located in the United Kingdom will expire on 2 November 2022. However, following the withdrawal of the United Kingdom from the Union on 1 February 2020, ships flying the flag of a Member State of the European Union can no longer be recycled at that facility after the end of the transition period provided for under the Withdrawal Agreement on 31 December 2020. The date of expiry of the inclusion of that facility in the European List should therefore be updated accordingly, i.e. until 31 December 2020.
(10)
The authorisation of another ship recycling facility located in the United Kingdomf9 expired on 3 August 2020 and the Commission has received information from the United Kingdom that the authorisation granted to that facility to conduct ship recycling has been renewed prior to its expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. Therefore, and considering that Regulation (EU) No 1257/2013 is made applicable to and in the United Kingdom in respect of Northern Ireland by the Protocol on Ireland/Northern Ireland, the facility can stay on the European List after the end of the transition period and until the date of expiry of the new authorisation. The date of expiry of the inclusion of that facility in the European List should therefore be updated accordingly.
(11)
The authorisation of a ship recycling facility located in Spainf10 expired on 28 July 2020 and the Commission has received information from Spain that the authorisation granted to that facility to conduct ship recycling has been renewed prior to its expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. The date of expiry of the inclusion of that facility in the European List should therefore be updated.
(12)
The authorisation of two ship recycling facilities located in Lithuaniaf11 expired on 17 March 2020 and on 21 May 2020, respectively, and the Commission has received information from Lithuania that the authorisation granted to those facilities to conduct ship recycling have been renewed prior to their expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. The date of expiry of the inclusion of those facilities in the European List should therefore be updated.
(13)
The authorisation of a ship recycling facility located in Portugalf12 expired on 26 July 2020 and the Commission has received information from Portugal that the authorisation granted to that facility to conduct ship recycling has been renewed prior to its expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. The date of expiry of the inclusion of that facility in the European List should therefore be updated.
(14)
The authorisation of a ship recycling facility located in Francef13 will expire on 24 May 2021 and the Commission has received information from France that the authorisation granted to that facility to conduct ship recycling has been renewed, in accordance with Article 14 of Regulation (EU) No 1257/2013. The date of expiry of the inclusion of that facility in the European List should therefore be updated.
(15)
The Commission has received applications, in accordance with Article 15(1) of Regulation (EU) No 1257/2013, for two ship recycling facilities located in Turkeyf14 to be included in the European List. Having assessed the information and supporting evidence provided or gathered in accordance with Article 15 of that Regulation, the Commission considers that the facilities comply with the requirements set out in Article 13 of that Regulation to conduct ship recycling and to be included in the European List. The European List should therefore be updated to include those facilities.
(16)
Implementing Decision (EU) 2016/2323 should therefore be amended accordingly.
(17)
The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 25 of Regulation (EU) No 1257/2013,
HAS ADOPTED THIS DECISION:
Annotations to the whole text
Footnotes
- f1
- f2
-
Commission Implementing Decision (EU) 2016/2323 of 19 December 2016 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council on ship recycling (OJ L 345, 20.12.2016, p. 119).
- f3
-
Jatob ApS.
- f4
-
Fosen Gjenvinning AS.
- f5
-
UAB ‘Armar’ (berth 127A).
- f6
-
A/S ‘Tosmares kuģubūvētava’.
- f7
-
Swansea Drydock Ltd.
- f8
-
Able UK Limited.
- f9
-
Harland and Wolff Heavy Industries Limited.
- f10
-
DDR VESSELS XXI, S.L.
- f11
-
UAB ‘APK’ and UAB Vakarų refonda.
- f12
-
Navalria – Docas, Construções e Reparações Navais.
- f13
-
Les recycleurs Bretons.
- f14
-
Simsekler Gida Gemi Sokum Insaat Sanayi Ticaret Ltd.Sti. and Avsar Gemi Sokum San. Dis Tic. Ltd. Sti.
Contents
1
The Annex to Implementing Decision (EU) 2016/2323 is replaced by the text in the Annex to this Decision.
2
This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
Signature
Done at Brussels, 11 November 2020.
For the Commission
The President
Ursula von der Leyen
‘ANNEX
THE EUROPEAN LIST OF SHIP RECYCLING FACILITIES REFERRED TO IN ARTICLE 16 OF REGULATION (EU) NO 1257/2013
PART A
Ship recycling facilities located in a Member State
As referred to in Article 7(3) of Regulation (EU) No 1257/2013 on ship recycling.
As referred to in the third sentence of Article 32(1)(a) of Regulation (EU) No 1257/2013.
The date of expiry of inclusion in the European List corresponds to the date of expiry of the permit or authorisation granted to the facility in the Member State.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 30 000 LDT per year.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 200 000 LDT per year.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 45 000 LDT per year.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 15 000 LDT per year.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 18 000 LDT per year.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 23 000 LDT per year.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 40 000 LDT per year.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 10 000 LDT per year.
According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year.
According to its permit, the facility is authorised to recycle a maximum 6 000 LDT per year.
According to its permit, the facility is authorised to recycle a maximum 10 000 LDT per year.
According to its permit, the facility is authorised to recycle a maximum 45 000 LDT per year.
According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.
According to its permit, the facility is authorised to recycle a maximum 75 000 LDT per year.
According to its permit, the facility is authorised to recycle a maximum 85 000 LDT per year.
According to its permit, the facility is authorised to recycle a maximum 200 000 LDT per year.
According to its permit, the facility is authorised to recycle a maximum 100 000 LDT per year.
According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 5 000 LDT per year.
According to its permit, the facility is authorised to recycle a maximum of 230 000 LDT per year.
According to its permit, the facility is authorised to recycle a maximum of 7 275 LDT per year.
According to its permit, the facility is authorised to recycle a maximum of 300 000 LDT per year.
Name of the facility Method of recycling Type and size of ships that can be recycled Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authorityf1 Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facilityf2 Date of expiry of inclusion in the European Listf3 BELGIUM NV Galloo Recycling Ghent
Scheepszatestraat 9
9000 Gent
Belgium
Phone: +32(0)9/251 25 21
Email: [email protected]
Alongside (wet berth), slope Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 265 metres
Width: 37 metres
Draught: 12,5 metres
Tacit approval, with a maximum review period of 30 days 34 000f4 31 March 2025 DENMARK FAYARD A/S
Kystvejen 100
DK-5330 Munkebo
Denmark
www.fayard.dk
Phone: +45 7592 0000
Email: [email protected]
Drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 415 metres
Width: 90 metres
Draught: 7,8 metres
The ship recycling facility is regulated in accordance with applicable legislation and with the conditions set out in Environmental Permit of 7 November 2018 issued by the Municipality of Kerteminde. The Environmental Permit includes conditions for operating hours, special operating conditions, handling and storage of waste and also includes a condition that the activity must be carried out in a dry dock. Tacit approval, with a maximum review period of 14 days. 0f5 7 November 2023 Fornæs ApS
Rolshøjvej 12-16
8500 Grenaa
Denmark
www.fornaes.dk
Phone: +45 86326393
Email: [email protected]
Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 150 metres
Width: 25 metres
Draught: 6 metres
GT: 10 000
The municipality of Norddjurs has the right to allocate Hazardous waste for environmentally approved reception facilities. Tacit approval, with a maximum review period of 14 days. 30 000 30 June 2021 Jatob ApS
Langerak 12
9900 Frederikshavn
Denmark
www.jatob.dk
Phone: +45 8668 1689
Alongside, slipway Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 150 metres
Width: 30 metres
Draught: 6 metres
Handling and storage of waste fractions is given by Environmental Authorization. Intermediate storage of hazardous waste may occur for up to one year at the site. Tacit approval, with a maximum review period of 14 days. 13 000 9 March 2025 Modern American Recycling Services Europe (M.A.R.S)
Sandholm 60
9900 Frederikshavn
Denmark
www.modernamericanrecyclingservices.com/
Email: [email protected]
Slipway Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 290 metres Width: 90 metresDraught: 14 metres
The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 9 March 2018 issued by the Municipality of Frederikshavn
The Municipality of Frederikshavn has the right to allocate hazardous waste to environmentally approved reception facilities, as set out in the Environmental Permit for the ship recycling facility.
The facility must not store hazardous waste for more than one year.
Tacit approval, with a maximum review period of 14 days. 0f6 23 August 2023 Smedegaarden A/S
Vikingkaj 5
6700 Esbjerg
Denmark
www.smedegaarden.net
Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 170 metres
Width: 40 metres
Draught: 7,5 metres
Tacit approval, with a maximum review period of 14 days 20 000 15 September 2021 Stena Recycling A/S
Grusvej 6
6700 Esbjerg
DENMARK
Phone: +45 20699190
Website:
www.stenarecycling.dk
Email:[email protected]
Drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013.
Maximum ship dimensions:
Length: 40 metres Width: 40 metresDraught: 10 metres
The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 5 October2017 issued by Esbjerg Municipality.
Esbjerg Municipality has the right to allocate hazardous waste to environmentally approved reception facilities, as set out in the Environmental Permit for the ship recycling facility
Tacit approval, with a maximum review period of 14 days 0f7 7 February 2024 ESTONIA BLRT Refonda Baltic OÜ
Kopli 103, 11712 Tallinn,
Estonia
Phone: +372 610 2933
Fax +372 610 2444
Email: [email protected]
www.refonda.ee
Afloat at the quayside and in the floating dock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 197 metres
Width: 32 metres
Draught: 9,6 metres
GT: 28 000
Waste permit No. L.JÄ/327249. Hazardous waste management licence No 0222. Rules of the Vene-Balti Port, Manual on Ships Recycling MSR-Refonda. Environmental Management System, Waste management EP 4.4.6-1-13
The facility can recycle only the hazardous materials for which it has been licensed.
Tacit approval, with a maximum review period of 30 days. 21 852f8 15 February 2021 SPAIN DDR VESSELS XXI, S.L.
Port of “El Musel”
Gijon
Spain
Phone: +34 630 14 44 16
Email: [email protected]
Dismantling ramp Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013.
Maximum ship dimensions:
Length: 169,9 metres
(Ships above that size which can operate a zero rollover or negative ramp movement may be accepted depending on the outcome of a detailed feasibility study)
The limitations are included in the integrated environmental authorisation. Explicit approval – The competent authority for the approval decision is the Harbour Masters Office 0f9 28 July 2025 FRANCE Démonaval Recycling
ZI du Malaquis
Rue François Arago
76580 LE TRAIT
Phone: (+ 33) (0)7 69 79 12 80
Email:
Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 140 metres
Width: 25 metres
Depth: 5 metres
Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment 0 11 December 2022 GARDET & DE BEZENAC Recycling /Groupe BAUDELETENVIRONNEMENT – GIE MUG
616, Boulevard Jules Durand
76600 Le Havre
France
Phone: +33(0)2 35 95 16 34
Email:[email protected]
Floating and slipway Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 150 metres
Width: 18 metres
Depth: 7 metres
LDT: 7 000
Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment. 16 000f10 30 December 2021 Grand Port Maritime de Bordeaux
152, Quai de Bacalan – CS 41320 – 33082 Bordeaux Cedex
France
Phone: +33(0)5 56 90 58 00
Email: [email protected]
Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 240 metres
Width: 37 metres
Depth: 17 metres
Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment. 18 000f11 21 October 2021 Les recycleurs Bretons
Zone Industrielle de Kerbriant – 29 610 Plouigneau
France
Phone: +33(0)2 98 01 11 06
Email: [email protected]
Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 225 metres
Width: 34 metres
Depth: 27 metres
Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment. 15 000f12 19 June 2025 ITALY San Giorgio del Porto S.p.A.
Calata Boccardo 8
16128 – Genova –
Italy
Phone:+39 (0)10 251561
Email:
www.sgdp.it
Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 350 metres
Width: 75 metres
Depth: 16 metres
GT: 130 000
The limitations and restrictions are included in the integrated environmental authorisation. Explicit approval 38 564 6 June 2023 LATVIA “Galaksis N”, Ltd.
Kapsedes street 2D,
Liepāja, LV – 3414
Latvia
Phone: +371 29410506
Email: [email protected]
Alongside (wet berth), drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 165 metres
Width:22 metres
Depth: 7 metres
GT: 12 000
See national permit No. LI12IB0053 Explicit approval – written notification in 30 working days 0f13 17 July 2024 LITHUANIA UAB APK
Minijos 180 (berth 133A), LT 93269, Klaipėda,
Lithuania
Phone: +370 (46) 365776
Fax +370 (46) 365776
Email: [email protected]
Alongside (wet berth) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 130 metres
Width: 35 metres
Depth: 10 metres
GT: 3 500
See national permit No. TL-KL.1-15/2015 Explicit approval – written notification in 30 working days 1 500f14 12 March 2025 UAB Armar
Minijos 180 (berth 131A), LT 93269, Klaipėda,
Lithuania
Phone: +370 685 32607
Email: [email protected]; [email protected]
Alongside (wet berth) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 80 metres
Width: 16 metres
Depth: 5 metres
GT: 1 500
See national permit No. TL-KL.1-51/2017 Explicit approval – written notification in 30 working days 3 910f15 19 April 2022 UAB Demeksa
Nemuno g. 42A (berth 121), LT 93277 Klaipėda
Lithuania
Phone: +370 630 69903
Email: [email protected]
Alongside (wet berth) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 58 metres;
Width: 16 metres;
Depth: 5 metres;
GT: 3500
See national permit No. TL-KL.1-64/2019 Explicit approval – written notification in 30 working days 0f16 22 May 2024 UAB Vakarų refonda
Minijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda,
Lithuania
Phone: +370 (46) 483940/483891
Fax +370 (46) 483891
Email: [email protected]
Alongside (wet berth) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 230 metres
Width: 55 metres
Depth: 14 metres
GT: 70 000
See national permit No. (11.2)-30-161/2011/TL-KL.1-18/2015 Explicit approval – written notification in 30 working days 20 140f17 30 April 2025 THE NETHERLANDS Damen Verolme Rotterdam B.V.
Prof. Gerbrandyweg 25
3197 KK Rotterdam-Botlek
The Netherlands
Phone: +31 18 123 43 53
Email: [email protected]
Drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 405 metres
Width: 90 metres
Depth: 11,6 metres
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. Explicit approval 52 000f18 21 July 2021 Sagro Aannemingsmaatschappij Zeeland B.V.
Estlandweg 10
4455 SV Nieuwdorp
The Netherlands
Phone: +31 113351710
Email: [email protected]
Preparatory actions along the quayside, lifted onshore for scrapping Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 120 metres
Width: 20 metres
Depth: 6 metres
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. Explicit approval 15 000 28 March 2024 Scheepssloperij Nederland B.V.
Havenweg 1; 3295 XZ 's-Gravendeel
Postbus 5234; 3295 ZJ 's-Gravendeel
The Netherlands
Phone: +31 78 673 60 55
Email: [email protected]
Wet mooring and slipway Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 200 metres
Width: 33 metres
Depth: 6 metres
Height: 45 metres (Botlekbridge)
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.
Preparatory actions take place along the quayside, until the hull can be towed onto the slipway using a winch which has a pulling capacity of 2 000 tonnes.
Explicit approval 9 300 27 September 2021 NORWAY ADRS Decom Gulen
Facility address:
Sløvågen 2,
5960 Dalsøyra,
Norway
Office address:
Statsminister Michelsens vei 38,
5230 Paradis,
Norway
https://adrs.no/
Alongside, slipway, dry/wet-dock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013.
Maximum ship dimensions:
Length: 360 metres
Width: No limit
Depth: No limit
See national permit No 2 019,0501.T Explicit approval 0f19 1 October 2024 AF Offshore Decom
Raunesvegen 597,
5578 Nedre Vats
Norway
https://afgruppen.no/selskaper/af-offshore-decom/
Alongside Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 290 metres
Width: no limit
Depth: no limit
See national permit No 2 005,0038.T Explicit approval 31 000 28 January 2024 Green Yard AS
Angholmen,
4485 Feda,
Norway
www.greenyard.no
Drydock (indoors), slipway Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 230 metres
Width: 25 metres
Depth: 20 metres
See national permit No 2 018,0833.T
Major dismantling operations must be performed indoors.
The only dismantling and cutting operations that are allowed outside in open air are minor operations necessary to fit ships to the indoor facility. See permit for further details.
Explicit approval 0 28 January 2024 Fosen Gjenvinning AS
Stokksundveien 1432,
7177 Revsnes
Norway
Phone: +47 400 39 479
Email: [email protected]
Alongside Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, with the exception of rigs or vessels used for extracting hydrocarbons
Maximum ship dimensions:
Length: 150 metres
Width: 20 metres
Depth: 7 metres
See national permit No 2 006,025.T Explicit approval 8 000 9 January 2024 Kvaerner AS (Stord)
Eldøyane 59,
5411 Stord,
Norway
www.kvaerner.com
Alongside (wet berth), slipway Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 230 metres
Width: No limit
Depth: No limit
See national permit No 2 013,0111.T Explicit approval 43 000f20 28 January 2024 Lutelandet Industrihamn
Lutelandet Offshore AS
6964 Korssund,
Norway
www.lutelandetoffshore.com
Alongside Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: No limit
Width: No limit
Depth: No limit
See national permit
No 2 014,0646.T
Explicit approval 14 000f21 28 January 2024 Norscrap West AS
Hanøytangen 122,
5310 Hauglandhella,
Norway
www.norscrap.no
Alongside, floating slipway, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 150 metres
Width: 34 metres
Depth: no limit
See national permit No 2 017,0864.T
Maximum 8 000 LDT on floating slipway. Ships exceeding 8 000 LDT need to be reduced prior to pulling in the slipway
Explicit approval 4 500f22 1 March 2024 PORTUGAL Navalria – Docas, Construções e Reparações Navais
Porto Comercial, Terminal Sul, Apartado 39, 3811-901 Aveiro
Portugal
Phone: +351 234378970, +351 232767700
Email: [email protected]
Drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 104 metres
Width: 6,5 metres
Draught: 6,5 metres
Conditions applied to the activity are defined in specifications annexed to Title AL n° 5/2015/CCDRC of 26 January 2016.
Decontamination and dismantling take place on a horizontal plane and inclined plane, according to the ship’s size. The horizontal plane has a nominal capacity of 700 tonnes. The inclined plane has a nominal capacity of 900 tonnes.
Explicit approval 1 900f23 26 November 2020 FINLAND Turun Korjaustelakka Oy (Turku Repair Yard Ltd)
Navirentie, 21110 Naantali
Finland
Phone: +358 2 44 511
Email: [email protected]
Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 250 metres
Width: 40 metres
Draught: 7,9 metres
The limitations are included in the national environmental permit. Explicit approval 20 000 1 October 2023 UNITED KINGDOM Able UK Limited
Teesside Environmental Reclamation and Recycling Centre
Graythorp Dock
Tees Road
Hartlepool
Cleveland
TS25 2DB
United Kingdom
Phone: +44(0)1642 806080
Email: [email protected]
Wet berth Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 337,5 metres
Width: 120 metres
Draught: 6,65 metres (9,5 m when dredged)
The site is authorised by way of a permit (Reference EPR/VP3296ZM) that limits the operations and places conditions on the operator of the facility. Explicit approval 95 490f24 31 December 2020 Dales Marine Services Ltd
Imperial Dry Dock
Leith
Edinburgh
EH6 7DR
Phone:+44(0)131 454 3380
Email:
Dry dock and wet berth Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 165 metres
Width: 21 metres
Draught: 7,7 metres
The site is authorised by way of a licence (Ref: WML L 1157331) that limits the operations and places conditions on the operator of the facility. Explicit approval 7 275f25 31 December 2020 Harland and Wolff (Belfast) Ltd
Queen’s Island
Belfast
BT3 9DU
Phone +44(0)2890534189
Fax +44(0)2890458515
Email [email protected]
Dry dock and wet berth Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 556 metres
Width: 93 metres
Draught: 7,5 metres
DWT: 550 000
The site is authorised by way of a waste management licence, authorisation number LN/20/11 that limits the operations and places conditions on the operator of the facility. Explicit approval 12 000f26 16 June 2025 PART B
Ship recycling facilities located in a third country
As referred to in Article 7(3) of Regulation (EU) No 1257/2013 on ship recycling.
As referred to in the third sentence of Article 32(1)(a) of Regulation (EU) No 1257/2013.
The inclusion of a ship recycling facility located in a third country in the European List is valid for a period of five years from the date of entry into force of the relevant Commission Implementing Decision which provides for the inclusion of that facility, unless otherwise stated.
The theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year.
The theoretical maximum annual ship recycling capacity of the facility is 120 000 LDT per year.
The theoretical maximum annual ship recycling capacity of the facility is 80 000 LDT per year.
The theoretical maximum annual ship recycling capacity of the facility is 90 000 LDT per year.
The theoretical maximum annual ship recycling capacity of the facility is 70 000 LDT per year.
The theoretical maximum annual ship recycling capacity of the facility is 100 000 LDT per year.’
Name of the facility Method of recycling Type and size of ships that can be recycled Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authorityf27 Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facilityf28 Date of expiry of inclusion in the European Listf29 TURKEY Avsar Gemi Sokum San. Dis Tic. Ltd. Sti.
Gemi Söküm Tesisleri,
Parcel 5 Aliağa
İzmir 35800,
Turkey
Phone: +90 232 618 21 07 – 08 – 09
Email: [email protected]
Landing Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, with the exception of rigs
Maximum ship dimensions:
Length: no limit
Width: 50 metres
Draught: 15 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.
Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning.
Tacit approval
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
54 224f30 2 December 2025 Isiksan Gemi Sokum Pazarlama Ve Tic. Ltd. Sti.
Gemi Söküm Tesisleri,
Parcel 22 Aliağa
İzmir 35800,
Turkey
Phone: +90 232 618 21 65
Email: [email protected]
Landing Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 75 metres
Draught: 17 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.
Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning.
Tacit approval
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalonedocument.
91 851f31 7 July 2024 EGE CELIK SAN. VE TIC. A.S.
Gemi Söküm Tesisleri,
Parcel 10 Aliağa,
Izmir 35800,
Turkey
Phone: +90 232 618 21 62
Email: [email protected]
Landing Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 50 metres
Draught: 15 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.
Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning.
Tacit approval
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
55 503 12 February 2025 LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET
LTD.
Gemi Söküm Tesisleri,
Parcel 3-4 Aliağa,
Izmir 35800,
Turkey
Phone: +90 232 618 20 30
Email: [email protected]
Landing Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 100 metres
Draught: 15 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.
Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning.
Tacit approval
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
55 495f32 9 December 2023 LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş.
Gemi Söküm Tesisleri,
Parcel 25 Aliağa,
Izmir 35800,
Turkey
Phone: +90 232 618 20 65
Email: [email protected]
Landing Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 63 metres
Draught: 15 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.
Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning.
Tacit approval
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship.The SRP is neither explicitly approved nor rejected as a standalonedocument.
50 350 9 December 2023 ÖGE GEMİ SÖKÜM İTH. İHR. TİC. SAN.AŞ.
Gemi Söküm Tesisleri,
Parcel 23 Aliağa,
Izmir 35800,
Turkey
Phone: +90 232 618 21 05
Email: [email protected]
www.ogegemi.com
Landing Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 70 metres
Draught: 15 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.
Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning.
Tacit approval
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
62 471f33 12 February 2025 Simsekler Gida Gemi Sokum Insaat Sanayi Tic. Ltd.Sti
Gemi Söküm Tesisleri,
Parcel 11-12 Aliağa,
Izmir 35800,
Turkey
Phone: +90 232 618 20 36
Email: [email protected]
Landing Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 95 metres
Draught: 15 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.
Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning.
Tacit approval
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document.
51 569f34 2 December 2025 Sök Denizcilik Tic. Ltd. Sti
Gemi Söküm Tesisleri,
Parcel 8-9 Aliağa,
Izmir 35800,
Turkey
Phone: +90 232 618 2092
Email: [email protected]
Landing Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 90 metres
Draught: 15 metres
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.
Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning.
Tacit approval
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalonedocument.
66 167f35 12 February 2025 UNITED STATES OF AMERICA International Shipbreaking Limited L.L.C
18601 R.L Ostos Road Brownsville TX, 78521
United States
Phone: 956-831-2299
Email: [email protected]
Alongside (wet berth), slope Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 366 metres Width: 48 metres Draught: 9 metres
The conditions under which the facility is authorised to operate are defined in permits, certificates and authorisations issued to the facility by the Environmental Protection Agency, the Texas Commission of Environmental Quality, the Texas General Land Office and the U.S Coast Guard.
The U.S. Toxic Substances Control Act prohibits the import into the US of foreign flagged vessels that contain PCB concentrations greater than 50 parts per million.
The facility has two slips with ramps for final vessel recycling (East Slip and West Slip). Ships flying a flag of EU Member States shall be recycled exclusively on the East Slip ramp.
There is currently no procedure in US law related to the approval of ship recycling plans 120 000 9 December 2023