OpenLegislation

Division 3.1

United Kingdom

Original text. Later amendments are not shown.

The following measurements shall be carried out at the point of waste water discharge:

  1. (a)

    continuous measurements of pH, temperature and flow;

  2. (b)

    spot sample daily measurements of total suspended solids or measurements of a flow proportional representative sample over a period of 24 hours;

  3. (c)

    at least monthly measurements of a flow proportional representative sample of the discharge over a period of 24 hours of Hg, Cd, TI, As, Pb, Cr, Cu, Ni and Zn;

  4. (d)

    at least every 6 months measurements of dioxins and furans; however, one measurement at least every 3 months shall be carried out for the first 12 months of operation.