Division 3.1.4.1
United Kingdom
Identical parameters for extending approval are:
- (1)
Engine,
- (2)
Combustion process,
- (3)
Periodically regenerating system (i.e. catalyst, particulate trap),
- (4)
Construction (i.e. type of enclosure, type of precious metal, type of substrate, cell density),
- (5)
Type and working principle,
- (6)
Dosage and additive system,
- (7)
Volume ± 10 per cent,
- (8)
Location (temperature ± 50 °C at 120 km/h or 5 per cent difference of max. temperature/pressure).