OpenLegislation

Division 5.1.3.1.4 F1

United Kingdom

Original text. Later amendments are not shown.

After 50 and 300 Fuel aging cycles, a measurement of BWC is performed. This measurement consists of loading the canister according to paragraph 5.1.6.3, of Annex 7 to UN/ECE Regulation No 83 until breakthrough. The BWC is recorded.

Then, the canister(s) shall be purged according the procedure of paragraph 5.1.3.8 of Annex 7 to UN/ECE Regulation No 83.

The canister must be purged between 5 minutes to 1 hour maximum after loading.

The operation of butane loading is repeated 5 times. The BWC is recorded after each butane loading step. The BWC 50 is calculated as the average of the 5 BWC and recorded.

In total, the canister(s) will be aged with 300 fuel aging cycles + 10 butane cycles and considered to be stabilised.

Annotations

Textual amendments

F1

Substituted by Commission Regulation (EU) 2017/1221 of 22 June 2017 amending Regulation (EC) No 692/2008 as regards the methodology for the determination of evaporative emissions (Type 4 test) (Text with EEA relevance).