Division 3.11 Modifications
Modifications may be approved in accordance with the reduced test programme specified in Table IV.3.11. Any major changes that are not covered by Table IV.3.11. shall be subjected to full approval testing.
Table IV.3.11.
Approval testing of modifications
Only when thickness change is proportional to diameter or pressure change. | ||||||||||||
A hydrogen cycle test is not required if the stresses in the neck are equal to the original or reduced by the design change (e.g. Reducing the diameter of internal threads, or changing the boss length), the liner to boss interface is not affected, and the original materials are used for boss, liner, and seals. | ||||||||||||
Any deviation from the parameters in the appendix to the information document as set out in Part 1 to Annex II is considered to be a change in manufacturing process. | ||||||||||||
Explanatory notes: for example: ‘2, 3’ indicates that a test is required for type 2 and 3 containers only. | ||||||||||||
| Type of test | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Materials sections 4.1.1.-4.1.8., as applicable | Hydrogen compatibility section 4.1.7. | Burst section 4.2.1. | Ambient temp. pressure cycling section 4.2.2. | Lbb Performance section 4.2.3. | Bonfire section 4.2.4. | Penetration section 4.2.5. | Chemical exposure section 4.2.6. | Composite flaw tolerance section 4.2.7. | Acc. Stress rupture – section 4.2.8. | Impact damage test section 4.2.10. | Permeation (section 4.2.12.) Boss torque (section 4.2.13.) Hydrogen cycling (section 4.2.14.) | |
| Fibre manufacturer | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 3, 4 | |||||||
| Metallic container or liner material | 1, 2, 3 | 1, 2, 3 | 1, 2, 3 | 1, 2, 3 | 1, 2 | 1, 2, 3 | 1, 2, 3 | 1, 2, 3 | 2, 3 | 2, 3 | 3 | |
| Plastic liner material | 4 | 4 | 4 | 4 | ||||||||
| Fibre material | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 3, 4 | ||
| Resin material | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 2, 3, 4 | 3, 4 | |||||||
| Diameter change ≤ 20 % | 1, 2, 3, 4 | 1, 2, 3, 4 | ||||||||||
| Diameter change >20 % | 1, 2, 3, 4 | 1, 2, 3, 4 | 1, 2, 3, 4 | 1, 2, 3, 4 | 2, 3, 4 | 3, 4 | ||||||
| Length change ≤ 50 % | 1, 2, 3, 4 | — | ||||||||||
| Length change > 50 % | 1, 2, 3, 4 | 1, 2, 3, 4 | 1, 2, 3, 4 | 3, 4 | ||||||||
| Nominal working pressure change ≤ 20 %f1 | 1, 2, 3, 4 | 1, 2, 3, 4 | ||||||||||
| Nominal working pressure change > 20 % | 1, 2, 3, 4 | 1, 2, 3, 4 | 1, 2, 3, 4 | 1, 2, 3, 4 | 1, 2, 3, 4 | |||||||
| Dome shape | 1, 2, 3, 4 | 1, 2, 3, 4 | 4 | |||||||||
| Opening size | 1, 2, 3, 4 | 1, 2, 3, 4 | ||||||||||
| Coating change | 2, 3, 4 | 2, 3, 4 | ||||||||||
| End boss design | 4f2 | |||||||||||
| Change in manufacturing processf3 | 1, 2, 3, 4 | 1, 2, 3, 4 | ||||||||||
| Fire protection system | 1, 2, 3, 4 | |||||||||||
Annotations
Footnotes
- f1
Only when thickness change is proportional to diameter or pressure change.
- f2
A hydrogen cycle test is not required if the stresses in the neck are equal to the original or reduced by the design change (e.g. Reducing the diameter of internal threads, or changing the boss length), the liner to boss interface is not affected, and the original materials are used for boss, liner, and seals.
- f3
Any deviation from the parameters in the appendix to the information document as set out in Part 1 to Annex II is considered to be a change in manufacturing process.