Commission Regulation (EU) No 406/2010 of 26 April 2010 implementing Regulation (EC) No 79/2009 of the European Parliament and of the Council on type-approval of hydrogen-powered motor vehicles (Text with EEA relevance)
EU Regulation No 406/2010 · Adopted 26 April 2010 · Extends to United Kingdom
Commission Regulation (EU) No 406/2010
of 26 April 2010
implementing Regulation (EC) No 79/2009 of the European Parliament and of the Council on type-approval of hydrogen-powered motor vehicles
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EC) No 79/2009 of the European Parliament and of the Council of 14 January 2009 on type-approval of hydrogen-powered motor vehicles, and amending Directive 2007/46/ECf1, and in particular Article 12 thereof,
Whereas:
(1)
Regulation (EC) No 79/2009 is a separate Regulation for the purposes of the Community type-approval procedure provided for by Directive 2007/46/EC of the European Parliament and of the Council of 5 September 2007 establishing a framework for the approval of motor vehicles and their trailers, and of systems, components and separate technical units intended for such vehicles (Framework Directive)f2.
(2)
Regulation (EC) No 79/2009 lays down fundamental provisions on requirements for the type-approval of motor vehicles with regard to hydrogen propulsion, for the type-approval of hydrogen components and hydrogen systems and for the installation of such components and systems.
(3)
From entry into force of the present Regulation manufacturers should be able to apply for the EC whole-vehicle type-approval of hydrogen-powered vehicles on a voluntary basis. However, some of the separate Directives in the context of the Community type-approval procedure under Directive 2007/46/EC or some of their requirements should not apply to hydrogen-powered vehicles, since the technical characteristics of hydrogen-powered vehicles differ significantly from conventional ones, for which those type-approval Directives were essentially designed. Pending the amendment of those Directives to include specific provisions and test procedures on hydrogen-powered vehicles, it is necessary to set out transitional provisions in order to exempt hydrogen-powered vehicles from those Directive or some of their requirements.
(4)
Adopting harmonised rules on hydrogen receptacles, including receptacles designed to use liquid hydrogen, is necessary in order to ensure that hydrogen vehicles can be refuelled throughout the Community in a safe and reliable manner.
(5)
The measures provided for in this Regulation are in accordance with the opinion of the Technical Committee — Motor Vehicles,
HAS ADOPTED THIS REGULATION:
Annotations to the whole text
Footnotes
Contents
- 1Definitions
- 2Administrative provisions for GB type-approval of a vehicle with regard to hydrogen propulsion
- 3Administrative provisions for GB component type-approval of hydrogen components and systems
- 4Article 4
- 5GB component type-approval mark
- 6Entry into force
- Signature
- Annex LIST OF ANNEXESAnnex LIST OF ANNEXES
- Annex I: Administrative Documents for GB type-approval of vehicles with regard to hydrogen propulsion
- Part 1: MODEL
- INFORMATION DOCUMENT No …relating to GB type-approval of a vehicle with regard to hydrogen propulsion
- Part 2: MODEL
- GB TYPE-APPROVAL CERTIFICATE
- Division
- Division
- Division
- Division
- Part 3: Information to be provided for inspection
- 1Division 1
- 2Division 2
- Annex II: Administrative documents for GB component type-approval of hydrogen components and systems
- Part 1: MODEL
- INFORMATION DOCUMENT Norelating to GB component type-approval of a hydrogen component or system
- Part 2: MODEL
- GB TYPE-APPROVAL CERTIFICATE
- Division
- Division
- Division
- Division
- Part 3: GB component type-approval mark
- 1Division 1
- 1.1Division 1.1
- 1.2Division 1.2
- 2Division 2
- 3Division 3
- Annex III: Requirements for hydrogen components and systems designed to use liquid hydrogen and their installation on hydrogen powered vehicles
- 1INTRODUCTION
- GENERAL REQUIREMENTS
- 2.1Division 2.1
- Part 1: Requirements for the installation of hydrogen components and systems designed to use liquid hydrogen on hydrogen powered vehicles
- General requirements
- 1.1Division 1.1
- 1.2Division 1.2
- 1.3Division 1.3
- 1.4Division 1.4
- 1.5Division 1.5
- Installation of the hydrogen container on-board of a vehicle
- 2.1Division 2.1
- 2.2Division 2.2
- Division
- Vehicle of categories M1 and N1:
- Vehicles of categories M2 and N2:
- Vehicles of categories M3 and N3:
- 2.4Division 2.4
- Accessories fitted to the hydrogen container
- Automatic shut-off valves or non-return valves
- 3.1.1Division 3.1.1
- 3.1.2Division 3.1.2
- 3.1.3Division 3.1.3
- 3.1.4Division 3.1.4
- 3.1.5Division 3.1.5
- Pressure relief devices
- 3.2.1Division 3.2.1
- 3.2.2Division 3.2.2
- 3.2.3Division 3.2.3
- Division
- Gas tight housing on the hydrogen container(s)
- 3.3.1Division 3.3.1
- 3.3.2Division 3.3.2
- 3.3.3Division 3.3.3
- 3.3.4Division 3.3.4
- 3.3.5Division 3.3.5
- 3.3.6Division 3.3.6
- 3.3.7Division 3.3.7
- Rigid and flexible fuel lines
- 4.1Division 4.1
- 4.2Division 4.2
- 4.3Division 4.3
- 4.4Division 4.4
- 4.5Division 4.5
- Fittings or gas connections between the components
- 5.1Division 5.1
- 5.2Division 5.2
- 5.3Division 5.3
- 5.4Division 5.4
- Refuelling connection or receptacle
- 6.1Division 6.1
- 6.2Division 6.2
- 6.3Division 6.3
- 6.4Division 6.4
- 6.5Division 6.5
- Electrical installation
- 7.1Division 7.1
- 7.2Division 7.2
- Boil-off under normal conditions
- 8.1Division 8.1
- 8.2Division 8.2
- 8.3Division 8.3
- Other requirements
- 9.1Division 9.1
- 9.2Division 9.2
- 9.3Division 9.3
- 9.4Division 9.4
- Safety instrumented systems
- 10.1Division 10.1
- 10.2Division 10.2
- Requirements for the inspection of the hydrogen system
- 11.1Division 11.1
- 11.2Division 11.2
- Part 2: Requirements for hydrogen containers designed to use liquid hydrogen
- 1INTRODUCTION
- TECHNICAL REQUIREMENTS
- 2.1Division 2.1
- Mechanical stresses
- Division
- Inner tank
- 2.2.1.1Test pressure
- 2.2.1.2Outer pressure
- Outer jacket
- 2.2.2.1Division 2.2.2.1
- 2.2.2.2Division 2.2.2.2
- 2.2.3Outer supports
- 2.2.4Inner supports
- 2.2.5Division 2.2.5
- 2.2.6Division 2.2.6
- Design temperature
- 2.3.1Inner tank and outer jacket
- 2.3.2Other equipment
- 2.3.3Division 2.3.3
- Chemical compatibility
- 2.4.1Division 2.4.1
- MATERIALS
- 3.1Division 3.1
- Characteristics
- 3.2.1Division 3.2.1
- 3.2.2Division 3.2.2
- 3.2.3Division 3.2.3
- Certificates and proofs of the material characteristics
- 3.3.1Division 3.3.1
- 3.3.2Division 3.3.2
- 3.3.3Division 3.3.3
- 3.3.4Division 3.3.4
- 3.3.5Division 3.3.5
- Design calculation
- 3.4.1Division 3.4.1
- 3.4.2Division 3.4.2
- 3.4.3Division 3.4.3
- MANUFACTURING AND MOUNTING OF THE CONTAINER
- 4.1Division 4.1
- 4.2Division 4.2
- 4.3Division 4.3
- 4.4Division 4.4
- 4.5Division 4.5
- 4.6Division 4.6
- 4.7Division 4.7
- 4.8Division 4.8
- OTHER REQUIREMENTS
- 5.1Protection of the outer jacket
- Provisions regarding the insulation
- 5.2.1Division 5.2.1
- Level gauge
- 5.3.1Division 5.3.1
- 5.3.2Division 5.3.2
- Maximum filling level
- 5.4.1Division 5.4.1
- 5.4.2Division 5.4.2
- Marking
- Division
- 5.5.1.1Division 5.5.1.1
- 5.5.1.2Division 5.5.1.2
- 5.5.2Division 5.5.2
- 5.6Inspection openings
- TESTS AND INSPECTION
- 6.1Tests and inspection for the approval
- 6.2Tests and inspection during production
- Testing procedures
- Pressure test
- 6.3.1.1Division 6.3.1.1
- 6.3.1.2Division 6.3.1.2
- 6.3.1.3Division 6.3.1.3
- 6.3.1.4Division 6.3.1.4
- 6.3.1.5Division 6.3.1.5
- 6.3.1.6Division 6.3.1.6
- 6.3.1.7Division 6.3.1.7
- 6.3.1.8Division 6.3.1.8
- 6.3.1.9Division 6.3.1.9
- 6.3.2Leak testing
- 6.3.3Verification of the dimensions
- 6.3.4Destructive and non-destructive tests of welding seams
- 6.3.5Visual inspection
- 6.3.6Marking
- Burst test
- Division
- Criteria
- 6.3.7.1.1Division 6.3.7.1.1
- 6.3.7.1.2Division 6.3.7.1.2
- Procedure
- 6.3.7.2.1Division 6.3.7.2.1
- 6.3.7.2.2Division 6.3.7.2.2
- 6.3.7.2.3Division 6.3.7.2.3
- 6.3.7.2.4Division 6.3.7.2.4
- 6.3.7.2.5Division 6.3.7.2.5
- 6.3.7.2.6Division 6.3.7.2.6
- 6.3.7.3Results
- Bonfire test
- Criteria
- 6.3.8.1.1Division 6.3.8.1.1
- Procedure
- 6.3.8.2.1Division 6.3.8.2.1
- 6.3.8.2.2Division 6.3.8.2.2
- Division
- 6.3.8.2.3.1Division 6.3.8.2.3.1
- 6.3.8.2.3.2Division 6.3.8.2.3.2
- 6.3.8.2.3.3Division 6.3.8.2.3.3
- 6.3.8.2.3.4Division 6.3.8.2.3.4
- 6.3.8.3Results
- Maximum filling level test
- 6.3.9.1Criteria
- Procedure
- 6.3.9.2.1Division 6.3.9.2.1
- 6.3.9.2.2Division 6.3.9.2.2
- 6.3.9.2.3Division 6.3.9.2.3
- 6.3.9.2.4Division 6.3.9.2.4
- 6.3.9.2.5Division 6.3.9.2.5
- 6.3.9.3Results
- Part 3: Requirements for hydrogen components other than containers designed to use liquid hydrogen
- 1INTRODUCTION
- GENERAL REQUIREMENTS
- 2.1Division 2.1
- 2.2Division 2.2
- 2.3Division 2.3
- 2.4Division 2.4
- TECHNICAL REQUIREMENTS
- Pressure relief devices
- Pressure relief devices for the inner tank
- 3.1.1.1Division 3.1.1.1
- 3.1.1.2Division 3.1.1.2
- 3.1.1.3Division 3.1.1.3
- 3.1.1.4Division 3.1.1.4
- 3.1.1.5Division 3.1.1.5
- 3.1.1.6Division 3.1.1.6
- 3.1.1.7Division 3.1.1.7
- Pressure relief devices for other components
- 3.1.2.1Division 3.1.2.1
- 3.1.2.2Division 3.1.2.2
- 3.1.2.3Division 3.1.2.3
- 3.1.2.4Division 3.1.2.4
- Provisions regarding the approval of pressure relief devices
- 3.1.3.1Division 3.1.3.1
- 3.1.3.2Division 3.1.3.2
- 3.1.3.3Division 3.1.3.3
- Set pressure
- 3.1.3.4.1Division 3.1.3.4.1
- 3.1.3.4.2Division 3.1.3.4.2
- 3.1.3.4.3Division 3.1.3.4.3
- Design temperatures
- 3.1.3.5.1Division 3.1.3.5.1
- 3.1.3.5.2Division 3.1.3.5.2
- 3.1.3.6Division 3.1.3.6
- Lines incorporating pressure relief devices
- 3.1.4.1Division 3.1.4.1
- 3.1.4.2Division 3.1.4.2
- Valves
- Provisions regarding the approval of hydrogen valves
- 3.2.1.1Division 3.2.1.1
- 3.2.1.2Division 3.2.1.2
- Design temperatures
- 3.2.1.3.1Division 3.2.1.3.1
- 3.2.1.3.2Division 3.2.1.3.2
- 3.2.1.4Division 3.2.1.4
- Heat exchangers
- 3.3.1Division 3.3.1
- 3.3.2Division 3.3.2
- 3.3.3Division 3.3.3
- Provisions regarding the approval of hydrogen valves
- 3.3.4.1Division 3.3.4.1
- Design temperatures
- 3.3.4.2.1Division 3.3.4.2.1
- 3.3.4.2.2Division 3.3.4.2.2
- 3.3.4.3Applicable test procedures
- 3.3.4.4Division 3.3.4.4
- Refuelling connections or receptacles
- 3.4.1Division 3.4.1
- Provisions regarding the approval of refuelling connections or receptacles
- 3.4.2.1Division 3.4.2.1
- Design temperatures
- 3.4.2.2.1Division 3.4.2.2.1
- 3.4.2.2.2Division 3.4.2.2.2
- 3.4.2.3Applicable test procedures
- Pressure regulators
- Provisions regarding the approval of pressure regulators
- 3.5.1.1Division 3.5.1.1
- Design temperatures
- 3.5.1.2.1Division 3.5.1.2.1
- 3.5.1.2.2Division 3.5.1.2.2
- 3.5.1.3Applicable test procedures
- Sensors
- Provisions regarding the approval of sensors
- 3.6.1.1Division 3.6.1.1
- Design temperatures
- 3.6.1.2.1Division 3.6.1.2.1
- 3.6.1.2.2Division 3.6.1.2.2
- 3.6.1.3Applicable test procedures
- Flexible fuel lines
- Provisions regarding the approval of flexible fuel lines
- 3.7.1.1Division 3.7.1.1
- 3.7.1.2Division 3.7.1.2
- Design temperatures
- 3.7.1.3.1Division 3.7.1.3.1
- 3.7.1.3.2Division 3.7.1.3.2
- 3.7.1.4Applicable test procedures
- Provisions regarding electrical components of the hydrogen system
- 3.8.1Division 3.8.1
- 3.8.2Division 3.8.2
- TEST PROCEDURES
- General provisions
- 4.1.1Division 4.1.1
- 4.1.2Division 4.1.2
- 4.1.3Division 4.1.3
- 4.1.4Division 4.1.4
- 4.1.5Division 4.1.5
- 4.1.6Division 4.1.6
- Pressure test
- 4.2.1Division 4.2.1
- 4.2.2Division 4.2.2
- 4.2.3Division 4.2.3
- External leakage test
- 4.3.1Division 4.3.1
- Division
- 4.3.2.1Division 4.3.2.1
- 4.3.2.2Division 4.3.2.2
- 4.3.2.3Division 4.3.2.3
- 4.3.3Division 4.3.3
- 4.3.4Division 4.3.4
- Endurance test
- 4.4.1Division 4.4.1
- 4.4.2Division 4.4.2
- 4.4.3Division 4.4.3
- 4.4.4Division 4.4.4
- 4.4.5Division 4.4.5
- 4.4.6Division 4.4.6
- Operational test
- 4.5.1Division 4.5.1
- Corrosion resistance test
- 4.6.1Division 4.6.1
- 4.6.2Division 4.6.2
- 4.7Resistance to dry-heat test
- Ozone ageing test
- 4.8.1Division 4.8.1
- 4.8.2Division 4.8.2
- 4.9Temperature cycle test
- Pressure cycle test
- 4.10.1Division 4.10.1
- 4.10.2Division 4.10.2
- 4.10.3Division 4.10.3
- Hydrogen compatibility test
- 4.11.1Division 4.11.1
- 4.11.2Division 4.11.2
- Seat leakage test
- 4.12.1Division 4.12.1
- 4.12.2Division 4.12.2
- 4.12.3Division 4.12.3
- 4.12.4Division 4.12.4
- 4.12.5Division 4.12.5
- 4.12.6Division 4.12.6
- Annex IV: Requirements for hydrogen components and systems designed to use compressed (gaseous) hydrogen and their installation on hydrogen powered vehicles
- 1INTRODUCTION
- GENERAL REQUIREMENTS
- 2.1Division 2.1
- 2.2Division 2.2
- 2.3Division 2.3
- 2.4Pressure classification
- 2.5Division 2.5
- 2.6Division 2.6
- Service conditions
- Division
- 2.7.1Service life
- 2.7.2Working pressure
- 2.7.3External surfaces
- 2.7.4Gas Composition
- Temperatures
- 2.7.5.1Material temperatures
- 2.7.5.2Gas Temperatures
- Filling cycles
- Division
- 2.7.6.1General
- 2.7.6.2Number of filling cycles if usage monitoring and control system is installed
- 2.7.6.3Reduced number of filling cycles
- Duty cycles
- 2.7.7.1General
- 2.7.7.2Number of duty cycles if usage monitoring and control system is installed
- 2.7.7.3Reduced number of duty cycles
- Part 1: Requirements for the installation of hydrogen components and systems designed to use compressed (gaseous) hydrogen on hydrogen powered vehicles
- GENERAL REQUIREMENTS
- 1.1Division 1.1
- 1.2Division 1.2
- 1.3Division 1.3
- 1.4Division 1.4
- 1.5Division 1.5
- 1.6Division 1.6
- 1.7Division 1.7
- 1.8Division 1.8
- 1.9Division 1.9
- INSTALLATION OF A CONTAINER ON-BOARD A VEHICLE
- 2.1Division 2.1
- Division
- Vehicles of categories M1 and N1:
- Vehicles of categories M2 and N2:
- Vehicles of categories M3 and N3:
- 2.3Division 2.3
- 2.4Division 2.4
- 2.5Division 2.5
- REMOVABLE STORAGE SYSTEM
- 3.1Division 3.1
- 3.2Division 3.2
- 3.3Division 3.3
- 3.4Division 3.4
- 3.5Division 3.5
- 3.6Division 3.6
- 3.7Division 3.7
- 3.8Division 3.8
- 3.9Division 3.9
- 3.10Division 3.10
- 3.11Division 3.11
- 3.12Division 3.12
- 3.13Division 3.13
- 3.14Division 3.14
- 3.15Division 3.15
- AUTOMATIC VALVE(S) OR NON-RETURN VALVE(S) FOR ISOLATING A CONTAINER OR CONTAINER ASSEMBLY OR PROPULSION SYSTEM
- 4.1Division 4.1
- 4.2Division 4.2
- 4.3Division 4.3
- 4.4Division 4.4
- 4.5Division 4.5
- 4.6Division 4.6
- 4.7Division 4.7
- PRESSURE RELIEF DEVICE(S)
- 5.1Division 5.1
- 5.2Division 5.2
- 5.3Division 5.3
- 5.4Division 5.4
- 5.5Division 5.5
- 5.6Division 5.6
- 5.7Division 5.7
- PRESSURE RELIEF VALVE(S)
- 6.1Division 6.1
- 6.2Division 6.2
- 6.3Division 6.3
- 6.4Division 6.4
- RIGID AND FLEXIBLE FUEL LINES
- 7.1Division 7.1
- 7.2Division 7.2
- 7.3Division 7.3
- 7.4Division 7.4
- 7.5Division 7.5
- 7.6Division 7.6
- 7.7Division 7.7
- FITTINGS BETWEEN HYDROGEN COMPONENTS
- 8.1Division 8.1
- 8.2Division 8.2
- 8.3Division 8.3
- REFILLING SYSTEM
- 9.1Division 9.1
- 9.2Division 9.2
- 9.3Division 9.3
- 9.4Division 9.4
- 9.5Division 9.5
- 9.6Division 9.6
- GAS TIGHT HOUSING
- 10.1Division 10.1
- 10.2Division 10.2
- 10.3Division 10.3
- 10.4Division 10.4
- 10.5Division 10.5
- ELECTRICAL INSTALLATION
- 11.1Division 11.1
- 11.2Division 11.2
- SAFETY INSTRUMENTED SYSTEMS
- 12.1Division 12.1
- 12.2Division 12.2
- REQUIREMENTS FOR THE INSPECTION OF THE HYDROGEN SYSTEM
- 13.1Division 13.1
- 13.2Division 13.2
- Part 2: Requirements for hydrogen containers designed to use compressed (gaseous) hydrogen
- INTRODUCTION
- Division
- 1.1Container types
- GENERAL REQUIREMENTS
- 2.1Division 2.1
- Container assembly
- 2.2.1Division 2.2.1
- 2.2.2Division 2.2.2
- 2.2.3Division 2.2.3
- 2.2.4Division 2.2.4
- 2.2.5Division 2.2.5
- TECHNICAL REQUIREMENTS
- 3.1General requirements
- 3.2Fire protection
- 3.3Opening threads
- 3.4Exterior environmental protection
- Material requirements
- 3.5.1General
- Steel
- 3.5.2.1Division 3.5.2.1
- 3.5.2.2Division 3.5.2.2
- 3.5.2.3Division 3.5.2.3
- Aluminium alloy
- 3.5.3.1Division 3.5.3.1
- 3.5.3.2Division 3.5.3.2
- 3.5.4Plastic liner materials
- 3.5.5Fibres
- 3.5.6Resins
- 3.6Burst pressure ratios
- Container manufacturing requirements
- 3.7.1Type 1 containers
- Type 2, 3 and 4 containers
- 3.7.2.1Composite filament winding
- 3.7.2.2Curing of thermosetting resins
- 3.7.2.3Auto-frettage
- 3.7.2.4Metallic liners
- 3.8Container markings
- Batch test requirements
- Batch test
- 3.9.1.1General
- 3.9.1.2Frequency of ambient temperature pressure cycling test
- 3.9.2Failure to meet test requirements
- 3.10Production examination and test requirements
- 3.11Modifications
- TEST PROCEDURES
- Material tests
- Division
- Tensile test
- 4.1.1.1Sampling
- 4.1.1.2Procedure
- 4.1.1.3Requirements
- 4.1.1.4Results
- Softening temperature test
- 4.1.2.1Sampling
- 4.1.2.2Procedure
- 4.1.2.3Requirement
- 4.1.2.4Results
- Glass transition temperature test
- 4.1.3.1Sampling
- 4.1.3.2Procedure
- 4.1.3.3Requirements
- 4.1.3.4Results
- Resin shear strength test
- 4.1.4.1Sampling
- 4.1.4.2Procedure
- 4.1.4.3Requirement
- 4.1.4.4Results
- Coating test
- 4.1.5.1Sampling
- 4.1.5.2Procedure and requirement
- 4.1.5.3Results
- Coating batch test
- 4.1.6.1Sampling
- 4.1.6.2Procedure and Requirement
- 4.1.6.3Results
- Hydrogen compatibility test
- 4.1.7.1Sampling
- 4.1.7.2Procedure
- 4.1.7.3Requirement
- 4.1.7.4Results
- Hardness test
- 4.1.8.1Sampling
- 4.1.8.2Procedure
- 4.1.8.3Requirement
- 4.1.8.4Results
- Container tests
- Burst test
- 4.2.1.1Sampling
- 4.2.1.2Procedure
- 4.2.1.3Requirement
- 4.2.1.4Results
- Ambient temperature pressure cycle test
- 4.2.2.1Sampling
- 4.2.2.2Procedure
- 4.2.2.3Requirement
- 4.2.2.4Results
- Leak-Before-Break (LBB) performance test
- 4.2.3.1Sampling
- 4.2.3.2Procedure
- 4.2.3.3Requirement
- 4.2.3.4Results
- Bonfire test
- 4.2.4.1Sampling
- 4.2.4.2Procedure
- 4.2.4.3Requirement
- 4.2.4.4Results
- Penetration test
- 4.2.5.1Sampling
- 4.2.5.2Procedure
- 4.2.5.3Requirement
- 4.2.5.4Results
- Chemical exposure test
- 4.2.6.1Sampling
- 4.2.6.2Procedure
- 4.2.6.3Requirement
- 4.2.6.4Results
- Composite flaw tolerance test
- 4.2.7.1Sampling
- 4.2.7.2Procedure
- 4.2.7.3Requirement
- 4.2.7.4Results
- Accelerated stress rupture test
- 4.2.8.1Sampling
- 4.2.8.2Procedure
- 4.2.8.3Requirement
- 4.2.8.4Results
- Extreme temperature pressure cycle test
- 4.2.9.1Sampling
- 4.2.9.2Procedure
- Explanatory note:
- 4.2.9.3Requirement
- 4.2.9.4Results
- Impact damage test
- 4.2.10.1Sampling
- Procedure
- 4.2.10.2.1Division 4.2.10.2.1
- 4.2.10.2.2Division 4.2.10.2.2
- 4.2.10.3Requirements
- 4.2.10.4Results
- Leak test
- 4.2.11.1Sampling
- 4.2.11.2Procedure
- 4.2.11.3Requirement
- 4.2.11.4Results
- Permeation test
- 4.2.12.1Sampling
- 4.2.12.2Procedure
- 4.2.12.3Requirements
- 4.2.12.4Results
- Boss torque test
- 4.2.13.1Sampling
- 4.2.13.2Procedure
- 4.2.13.3Requirement
- 4.2.13.4Results
- Hydrogen gas cycling test
- 4.2.14.1Sampling
- 4.2.14.2Procedure
- 4.2.14.3Requirement
- 4.2.14.4Results
- Hydraulic test
- 4.2.15.1Sampling
- 4.2.15.2Procedure and Requirement
- 4.2.15.3Results
- Part 3: Requirements for hydrogen components other than containers designed to use compressed (gaseous) hydrogen
- 1INTRODUCTION
- GENERAL REQUIREMENTS
- 2.1Division 2.1
- 2.2Division 2.2
- Division
- 2.3.1Division 2.3.1
- 2.3.2Division 2.3.2
- 2.4Division 2.4
- TECHNICAL REQUIREMENTS
- General requirements
- 3.1.1Division 3.1.1
- 3.1.2Division 3.1.2
- 3.1.3Division 3.1.3
- 3.1.4Division 3.1.4
- 3.1.5Division 3.1.5
- 3.1.6Division 3.1.6
- 3.1.7Division 3.1.7
- 3.1.8Division 3.1.8
- Specific requirements
- 3.2.1Division 3.2.1
- 3.2.2Division 3.2.2
- 3.2.3Division 3.2.3
- 3.2.4Division 3.2.4
- Division
- 3.2.5Division 3.2.5
- TEST PROCEDURES
- Material tests
- Hydrogen compatibility test
- 4.1.1.1Sampling
- 4.1.1.2Procedure and Requirements
- 4.1.1.3Results
- Ageing test
- 4.1.2.1Sampling
- 4.1.2.2Procedure and Requirements
- 4.1.2.3Results
- Ozone compatibility test
- 4.1.3.1Sampling
- 4.1.3.2Procedure and Requirements
- 4.1.3.3Results
- Component tests
- Corrosion resistance test
- 4.2.1.1Sampling
- Procedure and Requirements
- Test a:Division Test a:
- Test b:Division Test b:
- 4.2.1.3Results
- Endurance test
- 4.2.2.1Sampling
- Procedures and Requirements
- 4.2.2.2.1Division 4.2.2.2.1
- 4.2.2.2.2Fittings
- 4.2.2.2.3Flexible fuel lines
- 4.2.2.2.4Pressure regulators
- 4.2.2.2.5Pressure relief devices
- 4.2.2.2.6Pressure Relief Valves
- 4.2.2.2.7Receptacles
- 4.2.2.2.8Sensors for hydrogen systems
- 4.2.2.2.9Removable storage system connector
- 4.2.2.3Results
- Hydraulic pressure cycle test
- 4.2.3.1Sampling
- Procedure and Requirements
- 4.2.3.2.1Pressure relief devices
- 4.2.3.2.2Components other than pressure relief devices
- 4.2.3.3Results
- Internal leakage test
- 4.2.4.1Sampling
- 4.2.4.2Procedure
- 4.2.4.3Requirements
- 4.2.4.4Results
- External leakage test
- 4.2.5.1Sampling
- 4.2.5.2Procedure
- 4.2.5.3Requirements
- 4.2.5.4Results
- Annex V: Vehicle identification requirements
- INTRODUCTION
- 1.1Division 1.1
- REQUIREMENTS
- Division
- 2.1.1Division 2.1.1
- 2.1.2Division 2.1.2
- 2.1.3Division 2.1.3
- 2.1.4Division 2.1.4
- 2.2Division 2.2
- LABELS FOR HYDROGEN VEHICLES
- 3.1Labels for hydrogen vehicles using liquid hydrogen
- Colours:
- Dimensions of the label:
- Font size:
- 3.2Labels for hydrogen vehicles using compressed (gaseous) hydrogen
- Colours:
- Dimensions:
- Font size:
- LABELS FOR PUBLIC SERVICE HYDROGEN VEHICLES OF CATEGORIES M2 AND M3 TO BE INSTALLED ON THE FRONT AND REAR OF THE VEHICLE
- 4.1Labels for hydrogen vehicles using liquid hydrogen
- Colours:
- Dimensions of the label
- Font size:
- 4.2Labels for hydrogen vehicles using compressed (gaseous) hydrogen
- Colours:
- Dimensions:
- Font size:
- Annex VI: Safety requirements of complex electronic vehicle control systems
- 1INTRODUCTION
- DOCUMENTATION REQUIREMENTS
- 2.1General requirements
- 2.2Description of the functions of the safety instrumented system
- System layout and schematics
- 2.3.1Inventory of components
- 2.3.2Functions of the units
- 2.3.3Interconnections
- 2.3.4Signal flow and priorities
- Identification of units
- Division
- 2.3.5.1Division 2.3.5.1
- Safety concept of the vehicle manufacturer
- 2.4.1Division 2.4.1
- 2.4.2Division 2.4.2
- Division
- 2.4.3.1Division 2.4.3.1
- 2.4.3.2Division 2.4.3.2
- 2.4.3.3Division 2.4.3.3
- 2.4.3.4Division 2.4.3.4
- 2.4.4Division 2.4.4
- 2.4.5Division 2.4.5
- TEST PROCEDURES
- Division
- 3.1.1Verification of the function of the safety instrumented system
- 3.1.2Verification of the safety concept of section 2.4
- 3.1.3Division 3.1.3
- 3.2Division 3.2
- ADDITIONAL REQUIREMENTS
- 4.1Division 4.1
- Annex VIIStandards referenced by this Regulation