OpenLegislation

Division 4.2.2.4 Results

Original text. Later amendments are not shown.

The number of cycles to failure, along with the location and description of the failure initiation shall be documented and presented in a test summary, as specified in the addendum to the F1GB type-approval certificate as set out in Part 2 to Annex II.

The manufacturer shall keep the results on file throughout the service life of the container.

Annotations

Textual amendments

F1

Word in Annex 4 substituted (31.12.2022 at 11.00 p.m.) by The Road Vehicles and Non-Road Mobile Machinery (Type-Approval) (Amendment and Transitional Provisions) (EU Exit) Regulations 2022 (S.I. 2022/1273), regs. 1(2), 56(11)(a)