OpenLegislation

Division 4.2.4.4 Results

Original text. Later amendments are not shown.

The results shall be presented in a test summary, as specified in the addendum to the F1GB type-approval certificate as set out in Part 2 to Annex II, and shall include at least the following data for each container:

  1. (a)

    The elapsed time from ignition of the fire to the start of venting through the pressure relief device(s);

  2. (b)

    The maximum pressure and time of evacuation until a pressure ≤ 1,0 MPa is reached.

Annotations

Textual amendments

F1

Word in Annex 4 substituted (31.12.2022 at 11.00 p.m.) by The Road Vehicles and Non-Road Mobile Machinery (Type-Approval) (Amendment and Transitional Provisions) (EU Exit) Regulations 2022 (S.I. 2022/1273), regs. 1(2), 56(11)(a)