Division 4.2.14.2 Procedure
Special consideration shall be given to safety when conducting this test.
The container shall be tested in the following sequence:
- (a)
Use hydrogen gas to pressure cycle the container between ≤ 2,0 MPa and ≥ nominal working pressure for 1 000 cycles. The filling time shall not exceed 5 minutes. Temperatures during venting shall not exceed the values specified in section 2.7.5;
- (b)
Leak test in accordance with section 4.2.11.
Section the container and inspect the liner and liner/end boss interface for evidence of any deterioration, such as fatigue cracking or electrostatic discharge.