Division 4.2.13.2 Procedure
The container shall be tested in the following sequence:
- (a)
Restrain the body of the container against rotation;
- (b)
Apply a torque of 2 times the valve or pressure relief device installation torque specified by the manufacturer to each end boss of the container; first in the direction to tighten the threaded connection, then in the direction to loosen, and finally again in the direction to tighten;
- (c)
For type-approval, the following tests shall also be conducted:
- (i)
Leak test in accordance with section 4.2.11.;
- (ii)
Burst test in accordance with sections 4.2.1.2. and 4.2.1.3.
- (i)
For batch testing, follow the test sequence given in explanatory note (6) to Table IV.3.9.