OpenLegislation

Regulation (EC) No 66/2010 of the European Parliament and of the Council of 25 November 2009 on the EU Ecolabel (Text with EEA relevance) (revoked)

EU Regulation No 66/2010 · Adopted 25 November 2009 · Extends to United Kingdom

Original text. legislation.gov.uk does not revise this item, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Regulation (EC) No 66/2010 of the European Parliament and of the Council

of 25 November 2009

on the EU Ecolabel

(Text with EEA relevance) (revoked)

F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annotations to the whole text

Textual amendments

F1

Regulation revoked (31.12.2020) by The Environment (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/458), reg. 1(1), Sch. para. 2; 2020 c. 1, Sch. 5 para. 1(1)

Contents

  1. 1Subject matter Repealed
  2. 2Scope Repealed
  3. 3Definitions Repealed
  4. 4Competent bodies Repealed
  5. 5European Union Ecolabelling Board Repealed
  6. 6General requirements for EU Ecolabel criteria Repealed
  7. 7Development and revision of EU Ecolabel criteria Repealed
  8. 8Establishment of EU Ecolabel criteria Repealed
  9. 9Award of the EU Ecolabel and terms and conditions of its use Repealed
  10. 10Market surveillance and control of the use of the EU Ecolabel Repealed
  11. 11Ecolabelling schemes in the Member States Repealed
  12. 12Promotion of the EU Ecolabel Repealed
  13. 13Exchange of information and experiences Repealed
  14. 14Report Repealed
  15. 15Amendment of Annexes Repealed
  16. 16Committee procedure Repealed
  17. 17Penalties Repealed
  18. 18Repeal Repealed
  19. 19Transitional provisions Repealed
  20. 20Entry into force Repealed
  21. Signature
  22. Annex I: PROCEDURE FOR THE DEVELOPMENT AND REVISION OF EU ECOLABEL CRITERIA Repealed
  23. AStandard procedure Repealed
  24. Division Repealed
  25. 1Preliminary report Repealed
  26. 2Proposal for draft criteria and associated technical report Repealed
  27. 3Final report and draft criteria Repealed
  28. 4Manual for potential users of the EU Ecolabel and competent bodies Repealed
  29. 5Manual for authorities awarding public contracts Repealed
  30. BShortened procedure where criteria have been developed by other EN ISO 14024 type I ecolabelling schemes Repealed
  31. CShortened procedure for non-substantial revision of the criteria Repealed
  32. Annex IIForm of the EU Ecolabel Repealed
  33. Annex III Repealed
  34. 1Application fee Repealed
  35. 2Annual fee Repealed
  36. 3Inspection fee Repealed
  37. Annex IVSTANDARD CONTRACT COVERING THE TERMS OF USE OF THE EU ECOLABEL Repealed
  38. PREAMBLE Repealed
  39. 1USE OF THE EU ECOLABEL Repealed
  40. 1.1Division 1.1 Repealed
  41. 1.2Division 1.2 Repealed
  42. 1.3Division 1.3 Repealed
  43. 1.4Division 1.4 Repealed
  44. 1.5Division 1.5 Repealed
  45. 1.6Division 1.6 Repealed
  46. 1.7Division 1.7 Repealed
  47. 2SUSPENSION AND WITHDRAWAL Repealed
  48. 2.1Division 2.1 Repealed
  49. 2.2Division 2.2 Repealed
  50. 3LIMITATION OF LIABILITY AND INDEMNITY Repealed
  51. 3.1Division 3.1 Repealed
  52. 3.2Division 3.2 Repealed
  53. 3.3Division 3.3 Repealed
  54. 3.4Division 3.4 Repealed
  55. 4FEES Repealed
  56. 4.1Division 4.1 Repealed
  57. 4.2Division 4.2 Repealed
  58. 5CONTRACT DURATION AND APPLICABLE LAW Repealed
  59. 5.1Division 5.1 Repealed
  60. 5.2Division 5.2 Repealed
  61. 5.3Division 5.3 Repealed
  62. 5.4Division 5.4 Repealed
  63. 5.5Division 5.5 Repealed
  64. 5.6Division 5.6 Repealed
  65. Annex V: REQUIREMENTS RELATING TO COMPETENT BODIES Repealed
  66. 1Division 1 Repealed
  67. 2Division 2 Repealed
  68. 3Division 3 Repealed
  69. 4Division 4 Repealed
  70. 5Division 5 Repealed
  71. 6Division 6 Repealed
  72. 7Division 7 Repealed

1Subject matterF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2ScopeF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3DefinitionsF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4Competent bodiesF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5European Union Ecolabelling BoardF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6General requirements for EU Ecolabel criteriaF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7Development and revision of EU Ecolabel criteriaF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8Establishment of EU Ecolabel criteriaF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9Award of the EU Ecolabel and terms and conditions of its useF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10Market surveillance and control of the use of the EU EcolabelF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11Ecolabelling schemes in the Member StatesF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12Promotion of the EU EcolabelF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13Exchange of information and experiencesF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

14ReportF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

15Amendment of AnnexesF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

16Committee procedureF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

17PenaltiesF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

18RepealF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

19Transitional provisionsF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

20Entry into forceF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Signature

F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

AStandard procedureF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1Preliminary reportF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2Proposal for draft criteria and associated technical reportF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3Final report and draft criteriaF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4Manual for potential users of the EU Ecolabel and competent bodiesF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5Manual for authorities awarding public contractsF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

BShortened procedure where criteria have been developed by other EN ISO 14024 type I ecolabelling schemesF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

CShortened procedure for non-substantial revision of the criteriaF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annex IIForm of the EU EcolabelF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1Application feeF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2Annual feeF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3Inspection feeF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annex IVSTANDARD CONTRACT COVERING THE TERMS OF USE OF THE EU ECOLABELF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

PREAMBLEF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1USE OF THE EU ECOLABELF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1.1F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1.2F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1.3F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1.4F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1.5F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1.6F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1.7F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2SUSPENSION AND WITHDRAWALF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2.1F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2.2F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3LIMITATION OF LIABILITY AND INDEMNITYF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3.1F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3.2F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3.3F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3.4F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4FEESF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4.1F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4.2F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5CONTRACT DURATION AND APPLICABLE LAWF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.1F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.2F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.3F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.4F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.5F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.6F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .