Division 1 Prior to issuing an approval for a processing plant, as provided for in Article 44(1) of Regulation (EC) No 1069/2009, the competent authority must check that a validation of the processing plant has been carried out by the operator in accordance with the following procedures and indicators:

United Kingdom

Original text. Later amendments are not shown.

  1. (a)

    a description of the process by a process flow diagram;

  2. (b)

    an identification of critical control points (CCPs) including the material process rate for continuous systems;

  3. (c)

    the compliance with the specific process requirements laid down by this Regulation; and

  4. (d)

    the achievement of the following requirements:

    1. (i)

      particle size for batch-pressure and continuous processes, defined by the mincer hole or the anvil gap size;

    2. (ii)

      temperature, pressure, processing time and, in the case of continuous processing systems, the material processing rate, as specified in points 2 and 3.