Division 3 ContractF1
For construction products referred to in Article 21(1)(c), within 1 month from the receipt of the technical file, a contract must be concluded between the manufacturer and the responsible TAB for the production of the UK Technical Assessment, defining the work programme for drawing up the UK Assessment Document, including:
— the organisation of work between any relevant TABs,
— if applicable, the composition of the working group referred to in section 2.
Annotations
Textual amendments
- F1
Annex 2 substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 66 (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 paras. 12, 17); 2020 c. 1, Sch. 5 para. 1(1)