Division 5 The draft UK Assessment DocumentF1
The responsible TAB must finalise a draft UK Assessment Document with the working group referred to in section 2 and must share this draft with the parties concerned within 6 months of the date the Secretary of State was informed of the work programme.
Annotations
Textual amendments
- F1
Annex 2 substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 66 (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 paras. 12, 17); 2020 c. 1, Sch. 5 para. 1(1)