Division Test conditionsF1
United Kingdom
The minimal depth of the lysimeters shall be 100 cm; their maximal depth shall be 130 cm. The soil monolith must be undisturbed. Soil temperatures must be similar to those pertaining in the field. Where necessary, supplementary irrigation must be provided to ensure optimal plant growth and to ensure that the quantity of infiltration water is similar to that in the regions for which authorisation is sought. When during the study the soil has to be disturbed for agricultural reasons it must not be disturbed deeper than 25 cm.
Annotations
Textual amendments
- F1
Repealed (subject to transitional measures in Arts. 3, 4) by Commission Regulation (EU) No 283/2013 of 1 March 2013 setting out the data requirements for active substances, in accordance with Regulation (EC) No 1107/2009 of the European Parliament and of the Council concerning the placing of plant protection products on the market Text with EEA relevance.
Notes on Division 7.1
Textual amendments
- F2
Words in Annex Pt. A point 7.1 substituted (31.12.2020) by The Plant Protection Products (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/556), regs. 1(1), 16(5)(b)(ix) (as substituted by S.I. 2020/1376, regs. 1(4), 3(14)(a)(ii)); 2020 c. 1, Sch. 5 para. 1(1)