Annex F1
United Kingdom Repealed
- 1INTRODUCTION
- 2DEFINITION AND SCOPE OF SUBSYSTEM
- 3ESSENTIAL REQUIREMENTS
- 4DESCRIPTION OF THE INFRASTRUCTURE SUBSYSTEM
- 5INTEROPERABILITY CONSTITUENTS
- 6ASSESSMENT OF CONFORMITY OF INTEROPERABILITY CONSTITUENTS AND EC VERIFICATION OF THE SUBSYSTEMS
- 7IMPLEMENTATION OF THE INFRASTRUCTURE TSI
- AAssessment of interoperability constituents
- BAssessment of the infrastructure subsystem
- CTechnical characteristics of track design and switches and crossings design
- DConditions of use of track design and switches and crossings design
- ECapability requirements for structures according to traffic code
- FCapability requirements for structures according to traffic code in the United Kingdom of Great Britain and Northern Ireland
- GSpeed conversion to miles per hour for Ireland and the United Kingdom of Great Britain and Northern Ireland
- HStructure gauge for the 1 520 mm track gauge system
- IReverse curves with radii in the range from 150 m up to 300 m
- JSafety assurance over fixed obtuse crossings
- KBasis of minimum requirements for structures for passenger coaches and multiple units
- LDefinition of EN line category a12 for traffic code P6
- MSpecific case on the Estonian network
- NSpecific cases of the Hellenic network
- OSpecific case on the Ireland and United Kingdom of Northern Ireland networks
- PStructure gauge for the lower parts for the 1 668 mm track gauge on the Spanish network
- QNational technical rules for UK-GB Specific Cases
- RAppendix R
- SGlossary
- TList of referenced standards
Annotations
Textual amendments
- F1
Regulation revoked (31.12.2020) by The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), reg. 1(2)(c), Sch. 2