Commission Regulation (EU) No 1299/2014 of 18 November 2014 on the technical specifications for interoperability relating to the ‘infrastructure’ subsystem of the rail system in the European Union (Text with EEA relevance) (revoked)
EU Regulation No 1299/2014 · Adopted 18 November 2014 · Extends to United Kingdom
Commission Regulation (EU) No 1299/2014
of 18 November 2014
on the technical specifications for interoperability relating to the ‘infrastructure’ subsystem of the rail system in the European Union
(Text with EEA relevance) (revoked)
F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Annotations to the whole text
Textual amendments
- F1
Regulation revoked (31.12.2020) by The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), reg. 1(2)(c), Sch. 2
Contents
- 1Subject matter Repealed
- 2Scope Repealed
- 3Open points Repealed
- 4Specific cases Repealed
- 5Notification of bilateral agreements Repealed
- 6Projects at an advanced stage of development Repealed
- 7‘EC’ certificate of verification Repealed
- 8Conformity assessment Repealed
- 9Implementation Repealed
- 10Innovative solutions Repealed
- 11Repeal Repealed
- 12Entry into force Repealed
- Signature
- Annex Repealed
- 1INTRODUCTION Repealed
- 1.1Technical Scope Repealed
- 1.2Geographical Scope Repealed
- 1.3Content of this TSI Repealed
- 2DEFINITION AND SCOPE OF SUBSYSTEM Repealed
- 2.1Definition of the infrastructure subsystem Repealed
- 2.2Interfaces of this TSI with other TSIs Repealed
- 2.3Interfaces of this TSI with the Persons with Reduced Mobility TSI Repealed
- 2.4Interfaces of this TSI with the Safety in Railway Tunnels TSI Repealed
- 2.5Relation to the safety management system Repealed
- 3ESSENTIAL REQUIREMENTS Repealed
- 4DESCRIPTION OF THE INFRASTRUCTURE SUBSYSTEM Repealed
- 4.1Introduction Repealed
- 4.2Functional and technical specifications of the infrastructure subsystem Repealed
- 4.2.1TSI Categories of Line Repealed
- 4.2.2Basic parameters characterising the infrastructure subsystem Repealed
- 4.2.2.1List of Basic Parameters Repealed
- 4.2.2.2Requirements for Basic Parameters Repealed
- 4.2.3Line layout Repealed
- 4.2.3.1Structure gauge Repealed
- 4.2.3.2Distance between track centres Repealed
- 4.2.3.3Maximum gradients Repealed
- 4.2.3.4Minimum radius of horizontal curve Repealed
- 4.2.3.5Minimum radius of vertical curve Repealed
- 4.2.4Track parameters Repealed
- 4.2.4.1Nominal track gauge Repealed
- 4.2.4.2Cant Repealed
- 4.2.4.3Cant deficiency Repealed
- 4.2.4.4Abrupt change of cant deficiency Repealed
- 4.2.4.5Equivalent conicity Repealed
- 4.2.4.6Railhead profile for plain line Repealed
- 4.2.4.7Rail inclination Repealed
- 4.2.4.7.1Plain line Repealed
- 4.2.4.7.2Requirements for switches and crossings Repealed
- 4.2.5Switches and crossings Repealed
- 4.2.5.1Design geometry of switches and crossings Repealed
- 4.2.5.2Use of swing nose crossing Repealed
- 4.2.5.3Maximum unguided length of fixed obtuse crossings Repealed
- 4.2.6Track resistance to applied loads Repealed
- 4.2.6.1Track resistance to vertical loads Repealed
- 4.2.6.2Longitudinal track resistance Repealed
- 4.2.6.2.1Design forces Repealed
- 4.2.6.2.2Compatibility with braking systems Repealed
- 4.2.6.3Lateral track resistance Repealed
- 4.2.7Structures resistance to traffic loads Repealed
- 4.2.7.1Resistance of new bridges to traffic loads Repealed
- 4.2.7.1.1Vertical loads Repealed
- 4.2.7.1.2Allowance for dynamic effects of vertical loads Repealed
- 4.2.7.1.3Centrifugal forces Repealed
- 4.2.7.1.4Nosing forces Repealed
- 4.2.7.1.5Actions due to traction and braking (longitudinal loads) Repealed
- 4.2.7.1.6Design track twist due to rail traffic actions Repealed
- 4.2.7.2Equivalent vertical loading for new earthworks and earth pressure effects Repealed
- 4.2.7.3Resistance of new structures over or adjacent to tracks Repealed
- 4.2.7.4Resistance of existing bridges and earthworks to traffic loads Repealed
- 4.2.8Immediate action limits on track geometry defects Repealed
- 4.2.8.1The immediate action limit for alignment Repealed
- 4.2.8.2The immediate action limit for longitudinal level Repealed
- 4.2.8.3The immediate action limit for track twist Repealed
- 4.2.8.4The immediate action limit of track gauge as an isolated defect Repealed
- 4.2.8.5The immediate action limit for cant Repealed
- 4.2.8.6The immediate action limits for switches and crossings Repealed
- 4.2.9Platforms Repealed
- 4.2.9.1Usable length of platforms Repealed
- 4.2.9.2Platform height Repealed
- 4.2.9.3Platform offset Repealed
- 4.2.9.4Track layout alongside platforms Repealed
- 4.2.10Health, safety and environment Repealed
- 4.2.10.1Maximum pressure variations in tunnels Repealed
- 4.2.10.2Effect of crosswinds Repealed
- 4.2.10.3Aerodynamic effect on ballasted track Repealed
- (1)Division (1) Repealed
- (2)Division (2) Repealed
- (3)Division (3) Repealed
- 4.2.11Provision for operation Repealed
- 4.2.11.1Location markers Repealed
- 4.2.11.2Equivalent conicity in service Repealed
- 4.2.12Fixed installations for servicing trains Repealed
- 4.2.12.1General Repealed
- 4.2.12.2Toilet discharge Repealed
- 4.2.12.3Train external cleaning facilities Repealed
- 4.2.12.4Water restocking Repealed
- 4.2.12.5Refuelling Repealed
- 4.2.12.6Electrical shore supply Repealed
- 4.3Functional and technical specification of the interfaces Repealed
- 4.3.1Interfaces with the rolling stock subsystem Repealed
- 4.3.2Interfaces with the energy subsystem Repealed
- 4.3.3Interfaces with the control command and signalling subsystem Repealed
- 4.3.4Interfaces with the operation and traffic management subsystem Repealed
- 4.4Operating rules Repealed
- 4.5Maintenance rules Repealed
- 4.5.1Maintenance file Repealed
- 4.5.2Maintenance plan Repealed
- 4.6Professional qualifications Repealed
- 4.7Health and safety conditions Repealed
- 5INTEROPERABILITY CONSTITUENTS Repealed
- 5.1Basis on which interoperability constituents have been selected Repealed
- 5.2List of constituents Repealed
- 5.3Constituents performances and specifications Repealed
- 5.3.1The rail Repealed
- 5.3.1.1Railhead profile Repealed
- 5.3.1.2Rail steel Repealed
- 5.3.2The rail fastening systems Repealed
- 5.3.3Track sleepers Repealed
- 6ASSESSMENT OF CONFORMITY OF INTEROPERABILITY CONSTITUENTS AND EC VERIFICATION OF THE SUBSYSTEMS Repealed
- 6.1Interoperability Constituents Repealed
- 6.1.1Conformity assessment procedures Repealed
- 6.1.2Application of modules Repealed
- 6.1.3Innovative solutions for interoperability constituents Repealed
- 6.1.4EC declaration of conformity for interoperability constituents Repealed
- 6.1.4.1Interoperability constituents subject to other European Union Directives Repealed
- (1)Division (1) Repealed
- (2)Division (2) Repealed
- 6.1.4.2EC declaration of conformity for rails Repealed
- 6.1.4.3EC declaration of conformity for rail fastening systems Repealed
- 6.1.4.4EC declaration of conformity for track sleepers Repealed
- 6.1.5Particular assessment procedures for interoperability constituents Repealed
- 6.1.5.1Assessment of rails Repealed
- 6.1.5.2Assessment of sleepers Repealed
- 6.2Infrastructure subsystem Repealed
- 6.2.1General provisions Repealed
- 6.2.2Application of modules Repealed
- 6.2.2.1Application of module SG Repealed
- 6.2.2.2Application of module SH1 Repealed
- 6.2.3Innovative solutions Repealed
- 6.2.4Particular assessment procedures for infrastructure subsystem Repealed
- 6.2.4.1Assessment of Structure gauge Repealed
- 6.2.4.2Assessment of distance between track centres Repealed
- 6.2.4.3Assessment of nominal track gauge Repealed
- 6.2.4.4Assessment of track layout Repealed
- 6.2.4.5Assessment of cant deficiency for trains designed to travel with higher cant deficiency Repealed
- 6.2.4.6Assessment of design values for equivalent conicity Repealed
- 6.2.4.7Assessment of railhead profile Repealed
- 6.2.4.8Assessment of switches and crossings Repealed
- 6.2.4.9Assessment of new structures, earthworks and earth pressure effects Repealed
- 6.2.4.10Assessment of existing structures Repealed
- 6.2.4.11Assessment of platform offset Repealed
- 6.2.4.12Assessment of maximum pressure variations in tunnels Repealed
- 6.2.4.13Assessment of effect of crosswinds Repealed
- 6.2.4.14Assessment of fixed installations for servicing trains Repealed
- 6.2.4.15Assessment of compatibility with braking systems Repealed
- 6.2.5Technical solutions giving presumption of conformity at design stage Repealed
- 6.2.5.1Assessment of track resistance for plain line Repealed
- 6.2.5.2Assessment for switches and crossing Repealed
- 6.3EC Verification when speed is used as a migration criterion Repealed
- 6.4Assessment of maintenance file Repealed
- 6.5Subsystems containing Interoperability constituents not holding an EC declaration Repealed
- 6.5.1Conditions Repealed
- 6.5.2Documentation Repealed
- 6.5.3Maintenance of the subsystems certified according to 6.5.1. Repealed
- 6.6Subsystem containing serviceable interoperability constituents that are suitable for reuse Repealed
- 6.6.1Conditions Repealed
- 6.6.2Documentation Repealed
- 6.6.3Use of serviceable interoperability constituents in maintenance Repealed
- 7IMPLEMENTATION OF THE INFRASTRUCTURE TSI Repealed
- 7.1Application of this TSI to railway lines Repealed
- 7.2Application of this TSI to new railway lines Repealed
- 7.3Application of this TSI to existing railway lines Repealed
- 7.3.1Upgrading or renewal of a line Repealed
- (1)Division (1) Repealed
- (2)Division (2) Repealed
- (3)Division (3) Repealed
- (4)Division (4) Repealed
- (5)Division (5) Repealed
- (6)Division (6) Repealed
- (7)Division (7) Repealed
- 7.3.2Renewal of a line Repealed
- 7.3.3Substitution in the framework of maintenance Repealed
- 7.3.4Existing lines that are not subject to a renewal or upgrading project Repealed
- 7.4Application of this TSI to existing platforms Repealed
- 7.5Speed as an implementation criterion Repealed
- 7.6Route compatibility checks before the use of authorised vehicles Repealed
- 7.7Specific cases Repealed
- 7.7.1Particular features on the Austrian network Repealed
- 7.7.1.1Platform height (4.2.9.2) Repealed
- P cases Repealed
- 7.7.2Particular features on the Belgian network Repealed
- 7.7.2.1Platform offset (4.2.9.3) Repealed
- P cases Repealed
- 7.7.3Particular features on the Bulgarian network Repealed
- 7.7.3.1Platform height (4.2.9.2) Repealed
- P cases Repealed
- 7.7.3.2Platform offset (4.2.9.3) Repealed
- P cases Repealed
- 7.7.4Particular features on the Danish network Repealed
- 7.7.4.1Platform height (4.2.9.2) Repealed
- P cases Repealed
- 7.7.5Particular features on the Estonian network Repealed
- 7.7.5.1Nominal track gauge (4.2.4.1) Repealed
- P cases Repealed
- 7.7.5.2Resistance of new bridges to traffic loads (4.2.7.1) Repealed
- P cases Repealed
- 7.7.5.3The immediate action limit for switches and crossing (4.2.8.6) Repealed
- P cases Repealed
- 7.7.6Particular features on the Finnish network Repealed
- 7.7.6.1TSI Categories of line (4.2.1) Repealed
- P cases Repealed
- 7.7.6.2Structure gauge (4.2.3.1) Repealed
- P cases Repealed
- 7.7.6.3Distance between track centres (4.2.3.2) Repealed
- P cases Repealed
- 7.7.6.4Minimum radius of horizontal curve (4.2.3.4) Repealed
- P cases Repealed
- 7.7.6.5Nominal track gauge (4.2.4.1) Repealed
- P cases Repealed
- 7.7.6.6Cant (4.2.4.2) Repealed
- P cases Repealed
- 7.7.6.7Maximum unguided length of fixed obtuse crossings (4.2.5.3) Repealed
- P cases Repealed
- 7.7.6.8The immediate action limit of track gauge as an isolated defect (4.2.8.4) Repealed
- P cases Repealed
- 7.7.6.9The immediate action limit of cant (4.2.8.5) Repealed
- P cases Repealed
- 7.7.6.10The immediate action limits for switches and crossings (4.2.8.6) Repealed
- P cases Repealed
- 7.7.6.11Platform offset (4.2.9.3) Repealed
- P cases Repealed
- 7.7.6.12Train external cleaning facilities (4.2.12.3) Repealed
- P cases Repealed
- 7.7.6.13Assessment of structure gauge (6.2.4.1) Repealed
- P cases Repealed
- 7.7.7Particular features on the French network Repealed
- 7.7.7.1Platform height (4.2.9.2) Repealed
- P cases Repealed
- 7.7.8Particular features on the German network Repealed
- 7.7.8.1Platform height (4.2.9.2) Repealed
- P cases Repealed
- 7.7.9Particular features on the Hellenic network Repealed
- 7.7.9.1Platform height (4.2.9.2) Repealed
- P cases Repealed
- 7.7.10Particular features on the Italian network Repealed
- 7.7.10.1Platform offset (4.2.9.3) Repealed
- P cases Repealed
- 7.7.10.2Equivalent conicity (4.2.4.5) Repealed
- P cases Repealed
- 7.7.10.3Equivalent conicity in service (4.2.11.2) Repealed
- P cases Repealed
- 7.7.11Particular features on the Latvian network Repealed
- 7.7.11.1Resistance of new bridges to traffic loads — vertical loads (4.2.7.1.1) Repealed
- P cases Repealed
- 7.7.12Particular features on the Polish network Repealed
- 7.7.12.1TSI Categories of line (4.2.1) Repealed
- P cases Repealed
- 7.7.12.2Distance between track centres (4.2.3.2) Repealed
- P cases Repealed
- 7.7.12.3Minimum radius of horizontal curve (4.2.3.4) Repealed
- P cases Repealed
- 7.7.12.4Minimum radius of vertical curve (4.2.3.5) Repealed
- P cases Repealed
- 7.7.12.5Cant deficiency (4.2.4.3) Repealed
- P cases Repealed
- 7.7.12.6Abrupt change of cant deficiency (4.2.4.4) Repealed
- P cases Repealed
- 7.7.12.7The immediate action limit for track twist (4.2.8.3) Repealed
- P cases Repealed
- 7.7.12.8The immediate action limit of track gauge as an isolated defect (4.2.8.4) Repealed
- P cases Repealed
- 7.7.12.9The immediate action limits for switches and crossings (4.2.8.6) Repealed
- P cases Repealed
- 7.7.12.10Platform height (4.2.9.2) Repealed
- P cases Repealed
- 7.7.12.11Equivalent conicity in service (4.2.11.2) Repealed
- T cases Repealed
- 7.7.12.12Track sleepers (5.3.3) Repealed
- P cases Repealed
- 7.7.13Particular features on the Portuguese network Repealed
- 7.7.13.1Structure gauge (4.2.3.1) Repealed
- P cases Repealed
- 7.7.13.2Distance between track centres (4.2.3.2) Repealed
- P cases Repealed
- 7.7.13.3The immediate action limit of track gauge as an isolated defect (4.2.8.4) Repealed
- P cases Repealed
- 7.7.13.4The immediate action limit for switches and crossings (4.2.8.6) Repealed
- P cases Repealed
- 7.7.13.5Platform height (4.2.9.2) Repealed
- 7.7.13.6Platform offset (4.2.9.3) Repealed
- P cases Repealed
- 7.7.13.7Assessment of structure gauge (6.2.4.1) Repealed
- P cases Repealed
- 7.7.13.8Assessment of maximum pressure variations in tunnels (6.2.4.12) Repealed
- P cases Repealed
- 7.7.14Particular features on the Ireland network Repealed
- 7.7.14.1Structure gauge (4.2.3.1) Repealed
- P cases Repealed
- 7.7.14.2Distance between track centres (4.2.3.2) Repealed
- P cases Repealed
- 7.7.14.3Assessment of structure gauge (6.2.4.1) Repealed
- P cases Repealed
- 7.7.15Particular features on the Spanish network Repealed
- 7.7.15.1Structure gauge (4.2.3.1) Repealed
- P cases Repealed
- 7.7.15.2Distance between track centres (4.2.3.2) Repealed
- P cases Repealed
- 7.7.15.3Design track twist due to rail traffic actions (4.2.7.1.6) Repealed
- P cases Repealed
- 7.7.15.4The immediate action limit of track gauge as an isolated defect (4.2.8.4) Repealed
- P cases Repealed
- 7.7.15.5The immediate action limits for switches and crossings (4.2.8.6) Repealed
- P cases Repealed
- 7.7.15.6Platform height (4.2.9.2) Repealed
- P cases Repealed
- 7.7.15.7Platform offset (4.2.9.3) Repealed
- P cases Repealed
- 7.7.15.8Assessment of structure gauge (6.2.4.1) Repealed
- P cases Repealed
- 7.7.15.9Assessment of maximum pressure variations in tunnels (6.2.4.12) Repealed
- P cases Repealed
- 7.7.16Particular features on the Swedish network Repealed
- 7.7.16.1General Repealed
- P cases Repealed
- 7.7.16.2Platform offset (4.2.9.3) Repealed
- P cases Repealed
- 7.7.17Particular features on the UK network for Great Britain Repealed
- 7.7.17.1TSI categories of line (4.2.1) Repealed
- P cases Repealed
- 7.7.17.2Structure gauge (4.2.3.1) Repealed
- P cases Repealed
- 7.7.17.3Distance between track centres (4.2.3.2) Repealed
- P cases Repealed
- 7.7.17.3.bisEquivalent conicity (4.2.4.5) Repealed
- P cases Repealed
- 7.7.17.4Maximum unguided length of fixed obtuse crossings (4.2.5.3) Repealed
- P cases Repealed
- 7.7.17.5The immediate action limits for switches and crossings (4.2.8.6) Repealed
- P cases Repealed
- 7.7.17.6Platform height (4.2.9.2) Repealed
- P cases Repealed
- 7.7.17.7Platform offset (4.2.9.3) Repealed
- P cases Repealed
- 7.7.17.8Equivalent conicity in service (4.2.11.2) Repealed
- P cases Repealed
- 7.7.17.9Assessment of structure gauge (6.2.4.1) Repealed
- P cases Repealed
- 7.7.17.10Assessment of distance between track centres (6.2.4.2) Repealed
- P cases Repealed
- 7.7.17.11Assessment of platform offset (6.2.4.11) Repealed
- P cases Repealed
- 7.7.18Particular features on the UK network for Northern Ireland Repealed
- 7.7.18.1Structure gauge (4.2.3.1) Repealed
- P cases Repealed
- 7.7.18.2Distance between track centres (4.2.3.2) Repealed
- P cases Repealed
- 7.7.18.3Assessment of structure gauge (6.2.4.1) Repealed
- P cases Repealed
- 7.7.19Particular features on the Slovak network Repealed
- 7.7.19.1TSI categories of line (4.2.1) Repealed
- P cases Repealed
- 7.7.19.2Minimum radius of horizontal curve (4.2.3.4) Repealed
- P cases Repealed
- 7.7.19.3Minimum radius of vertical curve (4.2.3.5) Repealed
- P cases Repealed
- 7.7.19.4Cant deficiency (4.2.4.3) Repealed
- P cases Repealed
- 7.7.19.5The immediate action limit for track twist (4.2.8.3) Repealed
- P cases Repealed
- 7.7.19.6The immediate action limit of track gauge as an isolated defect (4.2.8.4) Repealed
- P cases Repealed
- 7.7.19.7The immediate action limit for cant (4.2.8.5) Repealed
- P cases Repealed
- 7.7.19.8The immediate action limits for switches and crossings (4.2.8.6) Repealed
- P cases Repealed
- 7.7.19.9Platform height (4.2.9.2) Repealed
- P cases Repealed
- 7.7.19.10Equivalent conicity in service (4.2.11.2) Repealed
- T cases Repealed
- 7.7.19.11Track sleepers (5.3.3) Repealed
- P cases Repealed
- AAssessment of interoperability constituents Repealed
- BAssessment of the infrastructure subsystem Repealed
- CTechnical characteristics of track design and switches and crossings design Repealed
- C.1Technical characteristics of track design Repealed
- C.2Technical characteristics of switches and crossings design Repealed
- DConditions of use of track design and switches and crossings design Repealed
- D.1Conditions of use of track design Repealed
- D.2Conditions of use of switches and crossings design Repealed
- ECapability requirements for structures according to traffic code Repealed
- FCapability requirements for structures according to traffic code in the United Kingdom of Great Britain and Northern Ireland Repealed
- GSpeed conversion to miles per hour for Ireland and the United Kingdom of Great Britain and Northern Ireland Repealed
- HStructure gauge for the 1 520 mm track gauge system Repealed
- IReverse curves with radii in the range from 150 m up to 300 m Repealed
- JSafety assurance over fixed obtuse crossings Repealed
- KBasis of minimum requirements for structures for passenger coaches and multiple units Repealed
- LDefinition of EN line category a12 for traffic code P6 Repealed
- MSpecific case on the Estonian network Repealed
- NSpecific cases of the Hellenic network Repealed
- OSpecific case on the Ireland and United Kingdom of Northern Ireland networks Repealed
- PStructure gauge for the lower parts for the 1 668 mm track gauge on the Spanish network Repealed
- QNational technical rules for UK-GB Specific Cases Repealed
- RAppendix R Repealed
- SGlossary Repealed
- TList of referenced standards Repealed