OpenLegislation

Division 2.2.1 IntroductionF1

United Kingdom Repealed

Original text. Later amendments are not shown.

  1. (1)

    The energy subsystem interfaces with other subsystems of the rail system in order to achieve the envisaged performance. These subsystems are listed below:

    1. (a)

      Rolling stock;

    2. (b)

      Infrastructure;

    3. (c)

      Trackside control command and signalling;

    4. (d)

      On-board control command and signalling;

    5. (e)

      Operation and traffic management.

  2. (2)

    Point 4.3 of this TSI sets out the functional and technical specification of these interfaces.

Annotations

Textual amendments

F1

Regulation revoked (31.12.2020) by The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), reg. 1(2)(c), Sch. 2