OpenLegislation

Division 4.2.8.2 Power supplyF1

United Kingdom Repealed

Original text. Later amendments are not shown.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  1. 4.2.8.2.1General
  2. 4.2.8.2.2Operation within range of voltages and frequencies
  3. 4.2.8.2.3Regenerative brake with energy to the overhead contact line
  4. 4.2.8.2.4Maximum power and current from the overhead contact line
  5. 4.2.8.2.5Maximum current at standstill for DC systems
  6. 4.2.8.2.6Power factor
  7. 4.2.8.2.7System energy disturbances for ac systems
  8. 4.2.8.2.8On-board energy measurement system
  9. 4.2.8.2.9Requirements linked to pantograph
  10. 4.2.8.2.10Electrical protection of the train

Annotations

Textual amendments

F1

Regulation revoked (31.12.2020) by The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), reg. 1(2)(c), Sch. 2