Division 4.2.8.2 Power supplyF1
United Kingdom Repealed
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- 4.2.8.2.1General
- 4.2.8.2.2Operation within range of voltages and frequencies
- 4.2.8.2.3Regenerative brake with energy to the overhead contact line
- 4.2.8.2.4Maximum power and current from the overhead contact line
- 4.2.8.2.5Maximum current at standstill for DC systems
- 4.2.8.2.6Power factor
- 4.2.8.2.7System energy disturbances for ac systems
- 4.2.8.2.8On-board energy measurement system
- 4.2.8.2.9Requirements linked to pantograph
- 4.2.8.2.10Electrical protection of the train
Annotations
Textual amendments
- F1
Regulation revoked (31.12.2020) by The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), reg. 1(2)(c), Sch. 2