Article 18 Nomination and re-nomination procedure at points other than interconnection points
United Kingdom
1.
The national regulatory authority shall, if not determined already, after consultation of the transmission system operator, determine at which points other than interconnection points nominations and re-nominations are required.
2.
Where nominations and re-nominations are required at points other than interconnection points the following principles shall apply:
(a)
network users shall be entitled to submit re-nominations for the gas day;
(b)
the transmission system operator shall confirm or reject the submitted nominations and re-nominations considering the timelines referred to in Article 17.