Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (Text with EEA relevance) (revoked)

EU Regulation 2015/1222 · Adopted 24 July 2015 · Extends to United Kingdom

Original text. legislation.gov.uk does not revise this item, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Commission Regulation (EU) 2015/1222

of 24 July 2015

establishing a guideline on capacity allocation and congestion management

(Text with EEA relevance) (revoked)

F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annotations to the whole text

Textual amendments

F1

Regulation revoked (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (Markets and Trading) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/532), regs. 1(1), 5(1)(a) (as amended by S.I. 2020/1016, regs. 1(2), 5(2)); 2020 c. 1, Sch. 5 para. 1(1)

Contents

  1. Title I: GENERAL PROVISIONS Repealed
  2. 1Subject matter and scope Repealed
  3. 2Definitions Repealed
  4. 3Objectives of capacity allocation and congestion management cooperation Repealed
  5. 4NEMOs designation and revocation of the designation Repealed
  6. 5NEMOs designation in case of a national legal monopoly for trading services Repealed
  7. 6NEMO designation criteria Repealed
  8. 7NEMO tasks Repealed
  9. 8TSOs' tasks related to single day-ahead and intraday coupling Repealed
  10. 9Adoption of terms and conditions or methodologies Repealed
  11. 10Day-to-day management of the single day-ahead and intraday coupling Repealed
  12. 11Stakeholder involvement Repealed
  13. 12Consultation Repealed
  14. 13Confidentiality obligations Repealed
  15. Title II: REQUIREMENTS FOR TERMS, CONDITIONS AND METHODOLOGIES CONCERNING CAPACITY ALLOCATION AND CONGESTION MANAGEMENT Repealed
  16. Chapter 1: Capacity calculation Repealed
  17. General requirements Repealed
  18. 14Capacity calculation time-frames Repealed
  19. 15Capacity calculation regions Repealed
  20. The common grid model Repealed
  21. 16Generation and load data provision methodology Repealed
  22. 17Common grid model methodology Repealed
  23. 18Scenarios Repealed
  24. 19Individual grid model Repealed
  25. Capacity calculation methodologies Repealed
  26. 20Introduction of flow-based capacity calculation methodology Repealed
  27. 21Capacity calculation methodology Repealed
  28. 22Reliability margin methodology Repealed
  29. 23Methodologies for operational security limits, contingencies and allocation constraints Repealed
  30. 24Generation shift keys methodology Repealed
  31. 25Methodology for remedial actions in capacity calculation Repealed
  32. 26Cross-zonal capacity validation methodology Repealed
  33. The capacity calculation process Repealed
  34. 27General provisions Repealed
  35. 28Creation of a common grid model Repealed
  36. 29Regional calculation of cross-zonal capacity Repealed
  37. 30Validation and delivery of cross-zonal capacity Repealed
  38. Biennial report on capacity calculation and allocation Repealed
  39. 31Biennial report on capacity calculation and allocation Repealed
  40. Chapter 2: Bidding zone configuration Repealed
  41. 32Reviewing existing bidding zone configurations Repealed
  42. 33Criteria for reviewing bidding zone configurations Repealed
  43. 34Regular reporting on current bidding zone configuration by ENTSO for Electricity and the Agency Repealed
  44. Chapter 3: Redispatching and countertrading Repealed
  45. 35Coordinated redispatching and countertrading Repealed
  46. Chapter 4: Algorithm development Repealed
  47. 36General provisions Repealed
  48. 37Algorithm development Repealed
  49. Chapter 5: Single day-ahead coupling Repealed
  50. The price coupling algorithm Repealed
  51. 38Objectives of the price coupling algorithm Repealed
  52. 39Inputs and results of the price coupling algorithm Repealed
  53. 40Products accommodated Repealed
  54. 41Maximum and minimum prices Repealed
  55. 42Pricing of day-ahead cross-zonal capacity Repealed
  56. 43Methodology for calculating scheduled exchanges resulting from single day-ahead coupling Repealed
  57. 44Establishment of fallback procedures Repealed
  58. 45Arrangements concerning more than one NEMO in one bidding zone and for interconnectors which are not operated by certified TSOs Repealed
  59. The single day-ahead coupling process Repealed
  60. 46Provision of input data Repealed
  61. 47Operation of single day-ahead coupling Repealed
  62. 48Delivery of results Repealed
  63. 49Calculation of scheduled exchanges resulting from single day-ahead coupling Repealed
  64. 50Initiation of fallback procedures Repealed
  65. Chapter 6: Single intraday coupling Repealed
  66. Objectives, conditions and results of single intraday coupling Repealed
  67. 51Objectives of the continuous trading matching algorithm Repealed
  68. 52Results of the continuous trading matching algorithm Repealed
  69. 53Products accommodated Repealed
  70. 54Maximum and minimum prices Repealed
  71. 55Pricing of intraday capacity Repealed
  72. 56Methodology for calculating scheduled exchanges resulting from single intraday coupling Repealed
  73. 57Arrangements concerning more than one NEMO in one bidding zone and for interconnectors which are not operated by certified TSOs Repealed
  74. The single intraday coupling process Repealed
  75. 58Provision of input data Repealed
  76. 59Operation of single intraday coupling Repealed
  77. 60Delivery of results Repealed
  78. 61Calculation of scheduled exchanges resulting from single intraday coupling Repealed
  79. 62Publication of market information Repealed
  80. 63Complementary regional auctions Repealed
  81. Transitional intraday arrangements Repealed
  82. 64Provisions relating to explicit allocation Repealed
  83. 65Removal of explicit allocation Repealed
  84. 66Provisions relating to intraday arrangements Repealed
  85. 67Explicit requests for capacity Repealed
  86. Chapter 7: Clearing and settlement for single day-ahead and intraday coupling Repealed
  87. 68Clearing and settlement Repealed
  88. Chapter 8: Firmness of allocated cross-zonal capacity Repealed
  89. 69Proposal for day-ahead firmness deadline Repealed
  90. 70Firmness of day-ahead capacity and allocation constraints Repealed
  91. 71Firmness of intraday capacity Repealed
  92. 72Firmness in the event of force majeure or emergency situations Repealed
  93. Title III: COSTS Repealed
  94. Chapter 1: Congestion income distribution methodology for single day-ahead and intraday coupling Repealed
  95. 73Congestion income distribution methodology Repealed
  96. Chapter 2: Redispatching and countertrading cost sharing methodology for single day-ahead and intraday coupling Repealed
  97. 74Redispatching and countertrading cost sharing methodology Repealed
  98. Chapter 3: Capacity allocation and congestion management cost recovery Repealed
  99. 75General provisions on cost recovery Repealed
  100. 76Costs of establishing, amending and operating single day-ahead and intraday coupling Repealed
  101. 77Clearing and settlement costs Repealed
  102. 78Costs of establishing and operating the coordinated capacity calculation process Repealed
  103. 79Costs of ensuring firmness Repealed
  104. 80Cost sharing between NEMOs and TSOs in different Member States Repealed
  105. Title IV: DELEGATION OF TASKS AND MONITORING Repealed
  106. 81Delegation of tasks Repealed
  107. 82Monitoring of the implementation of single day-ahead and intraday coupling Repealed
  108. Title V: TRANSITIONAL AND FINAL PROVISIONS Repealed
  109. 83Transitional provisions for Ireland and Northern Ireland Repealed
  110. 84Entry into force Repealed
  111. Signature