The following economic performance indicators (as defined below) are the key indicators of the economic analysis:
- (1)
Economic Net Present Value (ENPV) is the main reference indicator for project appraisal. It is defined as the difference between the discounted total social benefits and costs.
- (2)
For a major project to be acceptable from an economic standpoint the project's economic net present value should be positive (ENPV>0) demonstrating that the society in a given region or country gains from the project because the project's benefits exceed its costs and therefore, the project should be implemented.
- (3)
Economic rate of return (ERR) is the internal rate of return calculated using the economic values and expressing the socio-economic profitability of a project.
- (4)
Economic rate of return should be greater than the social discount rate (ERR>SDR) to justify EU support to a major project.
- (5)
Benefit/Cost ratio (B/C) is defined as the net present value of project benefits divided by the net present value of project costs.
- (6)
Benefit/Cost ratio should be greater than one (B/C>1) to justify EU support to a major project.
The main economic benefits per sector to be considered in the economic analysis are set out in table 1. Additional economic benefits can be added if needed and justified. In some specific cases those benefits may become economic costs e.g. increased vehicle operating costs in certain road projects.
Table 1
| Sector/Subsector | Economic benefits |
|---|---|
| Water supply and sanitation |
|
| Waste management |
|
| Energy | Energy Efficiency projects
Renewable Energy Sources projects
Electricity/gas grids and infrastructure
|
| Roads, Railways, Public Transport |
|
| Airports, Seaports, Intermodal |
|
| Research & Innovation |
|
| Broadband |
|