Commission Implementing Regulation (EU) 2015/207 of 20 January 2015 laying down detailed rules implementing Regulation (EU) No 1303/2013 of the European Parliament and of the Council as regards the models for the progress report, submission of the information on a major project, the joint action plan, the implementation reports for the Investment for growth and jobs goal, the management declaration, the audit strategy, the audit opinion and the annual control report and the methodology for carrying out the cost-benefit analysis and pursuant to Regulation (EU) No 1299/2013 of the European Parliament and of the Council as regards the model for the implementation reports for the European territorial cooperation goal
EU Regulation 2015/207 · Adopted 20 January 2015 · Extends to United Kingdom
Commission Implementing Regulation (EU) 2015/207
of 20 January 2015
laying down detailed rules implementing Regulation (EU) No 1303/2013 of the European Parliament and of the Council as regards the models for the progress report, submission of the information on a major project, the joint action plan, the implementation reports for the Investment for growth and jobs goal, the management declaration, the audit strategy, the audit opinion and the annual control report and the methodology for carrying out the cost-benefit analysis and pursuant to Regulation (EU) No 1299/2013 of the European Parliament and of the Council as regards the model for the implementation reports for the European territorial cooperation goal
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1303/2013 of 17 December 2013 of the European Parliament and of the Council laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund and laying down general provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund and the European Maritime and Fisheries Fund and repealing Council Regulation (EC) No 1083/2006f1, and in particular Article 52(4), the second and the fifth paragraphs of Article 101, the second paragraph of Article 106, and Articles 111(5), 125(10) and 127(6), thereof,
Having regard to Regulation (EU) No 1299/2013 of 17 December 2013 of the European Parliament and of the Council on specific provisions for the support from the European Regional Development Fund to the European territorial cooperation goalf2, and in particular Article 14(5) thereof,
After consulting the Coordination Committee for the European Structural and Investment Funds,
Whereas:
(1)
Commission Implementing Regulation (EU) No 288/2014f3 lays down provisions necessary for the preparation of programmes. In order to ensure implementation of the programmes financed by the European Structural and Investment Funds (the ‘ESI Funds’), it is necessary to lay down further provisions for the application of Regulation (EU) No 1303/2013. To facilitate a comprehensive view and the access to those provisions, those provisions should be set out in one implementing act.
(2)
The model for the progress report on implementation of the Partnership Agreement should set out uniform conditions for presenting information required in each part of the progress report in order to ensure that the information provided in the progress report is consistent and comparable and can, where necessary, be aggregated. To this end and taking into account that all information exchanges between Member States and the Commission should take place electronically through a system established for that purpose, the model should also define the technical characteristics of each field, including the format of the data, the input method and the character limits. The character limits proposed for the text fields are based on the needs of the most comprehensive reports.
(3)
To comply with the requirements laid down in Regulation (EU) No 1303/2013, the model for the progress report is divided into five parts. Part I sets out the information and assessment required for all the European Structural and Investment Funds. Part II sets out information and assessment required in the progress report on the Youth Employment Initiative. The information set out in Parts III, IV and V of the model for the progress report should be provided for the European Regional Development Fund (ERDF), the European Social Fund (ESF) and the Cohesion Fund where, in accordance with the third subparagraph of Article 111(4) of Regulation (EU) No 1303/2013, Member States with no more than one operational programme per Fund have opted to include the information required by Article 50(5) of the same Regulation and the information referred to in points (a), (b), (c) and (h) of the second subparagraph of Article 111(4) of that Regulation in the progress report on implementation of the Partnership Agreement instead of in the annual implementation reports submitted in 2017 and 2019 and in the final implementation report. Where such information has already been provided in Part I or II of the progress report, it should not be repeated in Part III, IV or V, as all information should be submitted once only.
(4)
Major projects represent a substantial proportion of EU spending and are of strategic importance for achieving the EU strategy for smart, sustainable and inclusive growth. To ensure uniform application it is necessary to provide a standard format for submitting the information requested for the approval of major projects. The information specified within this model should provide sufficient assurance that the financial contribution from the ERDF and the Cohesion Fund will not result in a substantial loss of jobs in existing locations within the Union.
(5)
A cost-benefit analysis, including an economic analysis, a financial analysis and a risk assessment is a prerequisite for the approval of a major project. A methodology for carrying out the cost-benefit analysis should be developed based on recognised best practices and with a view to ensuring consistency, quality and rigour, both in carrying out the analysis and in its assessment by the Commission or independent experts. The cost-benefit analysis of major projects should show that the project is desirable from an economic point of view and that the contribution from the ERDF and the Cohesion Fund is needed for the project to be financially viable.
(6)
To ensure uniform conditions for the implementation of Article 106 of Regulation (EU) No 1303/2013 it is necessary to set out a format of the model for the joint action plan. Taking into account that all information exchanges between Member States and the Commission should take place electronically through a system established for that purpose, the model should also define the technical characteristics of each field, including the format of the data, the input method and the character limits.
(7)
As the reporting requirements for the Investment for growth and jobs goal and for the European territorial cooperation goal are not identical, it is necessary to set out two models for the implementation reports, one for operational programmes under the Investment for growth and jobs goal and one for cooperation programmes under the European territorial cooperation goal. Nevertheless it should be ensured that where reporting requirements are the same or similar for the two goals, the content of the models is harmonised to the extent possible.
(8)
A model for the annual and final implementation reports should set out uniform conditions for presenting the information required in each part of the reports. This will ensure that the information provided is consistent and comparable, and can, where necessary, be aggregated. To this end and taking into account that all information exchanges between Member States and the Commission should take place electronically through a system established for that purpose, the model should also define the technical characteristics of each field, including the format of the data, the input method and the character limits. The character limits proposed for the text fields are based on the needs of the most comprehensive reports.
(9)
In order to comply with the requirements of Regulation (EU) No 1303/2013 for the annual implementation report under the Investment in growth and jobs goal, whereby different types of information are to be reported depending on the year in question, the model is divided into three parts in order to set out clearly the information required for each year's report. Part A sets out the information required every year starting from 2016, Part B sets out additional information to be provided in the reports submitted in 2017 and 2019 and in the final reports and Part C sets out information to be provided in the report submitted in 2019 and in the final report, in addition to the information set out in Parts A and B. In accordance with the third subparagraph of Article 111(4) of Regulation (EU) No 1303/2013, Member States with no more than one operational programme per Fund may include certain information in the progress report instead of the annual implementation reports submitted in 2017 and 2019 and the final implementation report. It is necessary to identify this information in the model to ensure uniform application of those provisions.
(10)
Pursuant to Article 50(9) of Regulation (EU) No 1303/2013, a citizen's summary of the content of the annual and final implementation reports should be made available to the public. It should be uploaded as a separate file in the form of an annex to the annual and final implementation reports. No specific model is envisaged for the citizen's summary, thus allowing Member States to use the structure and formatting they consider most appropriate.
(11)
To harmonise standards for the preparation and presentation of the management declaration for which a managing authority is responsible pursuant to point (e) of the first subparagraph of Article 125(4) of Regulation (EU) No 1303/2013, it is necessary to set out uniform conditions for its content in the form of a standard model.
(12)
To harmonise standards for the preparation and presentation of the audit strategy, the audit opinion and the annual control report for which an audit authority is responsible pursuant to Article 127(4) and the first subparagraph of Article 127(5) of Regulation (EU) No 1303/2013, a model should be provided setting out uniform conditions for the structure, and specifying the nature and the quality of the information to be used in their preparation.
(13)
In order to allow for the prompt application of the measures provided for in this Regulation, this Regulation should enter into force on the day following that of its publication in the Official Journal of the European Union,
HAS ADOPTED THIS REGULATION:
Annotations to the whole text
Footnotes
- f1
- f2
- f3
-
Commission Implementing Regulation (EU) No 288/2014 of 25 February 2014 laying down rules pursuant to Regulation (EU) No 1303/2013 of the European Parliament and of the Council laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund and laying down general provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund and the European Maritime and Fisheries Fund with regard to the model for operational programmes under the Investment for growth and jobs goal and pursuant to Regulation (EU) No 1299/2013 of the European Parliament and of the Council on specific provisions for the support from the European Regional Development Fund to the European territorial cooperation goal with regard to the model for cooperation programmes under the European territorial cooperation goal (OJ L 87, 22.3.2014, p. 1).
Contents
- 1Model for the progress report
- 2Format for submission of the information on a major project
- 3Methodology for carrying out the cost-benefit analysis
- 4Format of the model for the joint action plan
- 5Model for the implementation reports for the Investment for growth and jobs goal
- 6Model for the management declaration
- 7Models for the audit strategy, the audit opinion and the annual control report
- 8Model for the implementation reports for the European territorial cooperation goal
- 9Entry into force
- Signature
- Annex I: MODEL FOR THE PROGRESS REPORT
- Information and assessment required for all the European Structural and Investment Funds (ESI Funds)
- 1Changes in the development needs in the Member State since the adoption of the Partnership Agreement (Article 52(2)(a) of Regulation (EU) No 1303/2013 of the European Parliament and of the Council )
- 2Progress towards achievement of the Union strategy for smart, sustainable and inclusive growth, as well as of the Fund-specific missions through the contribution of the ESI Funds to the thematic objectives selected, and in particular in respect to the milestones set out in the performance framework for each programme, and to the support used for climate change objectives (Article 52(2)(b) of Regulation (EU) No 1303/2013)
- 3For 2017 report only — Actions taken to fulfil the ex ante conditionalities set out in the Partnership Agreement (Article 52(2)(c) of Regulation (EU) No 1303/2013)
- 4Implementation of mechanisms to ensure coordination between the ESI Funds and other Union and national funding instruments and with the European Investment Bank (EIB) (Article 52(2)(d) of Regulation (EU) No 1303/2013)
- 5Implementation of the integrated approach to territorial development, or a summary of the implementation of the integrated approaches that are based on the programmes, including progress towards achievement of priority areas established for cooperation (Article 52(2)(e) of Regulation (EU) No 1303/2013)
- 6Where appropriate, actions taken to reinforce the capacity of the Member State authorities and beneficiaries to administer and use the ESI Funds (Article 52(2)(f) of Regulation (EU) No 1303/2013)
- 7Actions taken and progress achieved towards a reduction in the administrative burden for beneficiaries (Article 52(2)(g) of Regulation (EU) No 1303/2013)
- 8The role of the partners referred to in Article 5 of Regulation (EU) No 1303/2013 in the implementation of the Partnership Agreement (Article 52(2)(h) of Regulation (EU) No 1303/2013)
- 9A summary of the actions taken in relation to the application of horizontal principles and policy objectives for the implementation of the ESI Funds (Article 52(2)(i) of Regulation (EU) No 1303/2013)
- Information and assessment on the Youth Employment Initiative (for the purposes of Article 19(5) of Regulation (EU) No 1304/2013 of the European Parliament and of the Council )
- 10Implementation of the Youth Employment Initiative (YEI) (Article 19(5) of Regulation (EU) No 1304/2013)
- Information and assessment to be provided for cohesion policy if use is made of the option provided by Article 111(4) of Regulation (EU) No 1303/2013 to include certain elements of the annual implementation reports in the progress report — to be provided in 2017 and 2019
- Additional information and assessment which may be added depending on the content and objectives of the operational programme (Article 111(4) of Regulation (EU) No 1303/2013, included where necessary to complement the other sections of the progress report)
- 11.1Division 11.1
- 11.2Division 11.2
- 11.3Division 11.3
- 11.4Division 11.4
- Information and assessment on the implementation of the YEI in case use is made of the option provided by Article 111(4) of Regulation (EU) of No 1303/2013 — to be provided in 2019
- 12Implementation of the YEI (Article 19(4) of Regulation (EU) No 1304/2013)
- Information and assessment to be provided for cohesion policy if use is made of the option provided by Article 111(4) of Regulation (EU) No 1303/2013 (included where necessary to complement the other sections of the progress report) — to be provided in 2019
- 13Programme contribution to achieving the Union strategy for smart, sustainable and inclusive growth (Article 50(5) of Regulation (EU) No 1303/2013)
- Annex II: Format for submission of the information on a major project
- EUROPEAN REGIONAL DEVELOPMENT FUND / COHESION FUND
- INFRASTRUCTURE/PRODUCTIVE INVESTMENT
- THE BODY RESPONSIBLE FOR IMPLEMENTATION OF THE MAJOR PROJECT, AND ITS CAPACITY
- A.1Authority responsible for project application (managing authority or intermediate body)
- A.2Body/-ies responsible for project implementation (beneficiary/-ies )
- Details of the undertaking (to be filled in for productive investments only)
- A.3.1Name of the undertaking:
- A.3.2Is the undertaking an SME ? <type='C' input=M>
- A.3.3Turnover (value in million EUR and year):
- A.3.4Total number of persons employed (value and year):
- A.3.5Group structure:
- Capacity of the body responsible for project implementation by referring to its technical, legal, financial and administrative capacity
- A.4.1Division A.4.1
- A.4.2Division A.4.2
- A.4.3Division A.4.3
- A.4.4Division A.4.4
- A.5Provide information on all relevant institutional arrangements with third parties for the implementation of the project and the successful operation of the resulting facilities that have been planned and possibly concluded
- A.5.1Division A.5.1
- A DESCRIPTION OF THE INVESTMENT AND ITS LOCATION; EXPLANATION AS TO HOW IT IS CONSISTENT WITH THE RELEVANT PRIORITY AXES OF THE OPERATIONAL PROGRAMME(S) CONCERNED, AND ITS EXPECTED CONTRIBUTION TO ACHIEVING THE SPECIFIC OBJECTIVES OF THOSE PRIORITY AXES AND THE EXPECTED CONTRIBUTION TO SOCIO-ECONOMIC DEVELOPMENT
- B.1Operational programme(s) and priority axes
- B.1.1Division B.1.1
- B.2Categorisation of project activity
- Project description
- B.3.1Division B.3.1
- B.3.2Division B.3.2
- B.3.3Division B.3.3
- B.3.4Division B.3.4
- B.3.5Division B.3.5
- B.3.6In case of productive investments is this investment:
- B.4Division B.4
- B.4.1Division B.4.1
- B.4.2Division B.4.2
- B.4.3Division B.4.3
- B.4.4Division B.4.4
- TOTAL COST AND TOTAL ELIGIBLE COST
- C.1Please complete table below taking into account the following
- C.2Verification of compliance with State aid rules
- C.3Total eligible cost calculation
- FEASIBILITY STUDIES CARRIED OUT, INCLUDING OPTION ANALYSIS, AND THE RESULTS
- D.1Demand analysis
- Option analysis
- D.2.1Division D.2.1
- D.2.2Division D.2.2
- D.3Feasibility of the option selected
- D.3.1Institutional aspect
- D.3.2Technical aspects including location, designed capacity of the main infrastructure, justification of the project scope and size in the context of the forecasted demand, justification of the choices made with regard to climate and natural disaster risks assessment (where relevant), investment and operating costs estimates
- D.3.3Environmental, and climate change mitigation (GHG emissions) and adaptation aspects (where applicable)
- D.3.4Other aspects
- EA COST-BENEFIT ANALYSIS, INCLUDING A FINANCIAL AND AN ECONOMIC ANALYSIS, AND A RISK ASSESSMENT
- Financial analysis
- E.1.1Division E.1.1
- E.1.2Main elements and parameters used in the CBA for financial analysis (all values in euro)
- E.1.3Main indicators of the financial analysis in accordance with the CBA document
- Tariff strategy and affordability (if applicable)
- E.1.4.1Division E.1.4.1
- E.1.4.2Division E.1.4.2
- E.1.4.3Division E.1.4.3
- E.1.4.4Division E.1.4.4
- E.1.4.5Division E.1.4.5
- Economic analysis
- E.2.1Division E.2.1
- E.2.2Division E.2.2
- E.2.3Main indicators of the economic analysis in accordance with the CBA document
- E.2.4Employment effects of project
- E.2.5Division E.2.5
- Risk assessment and sensitivity analysis
- E.3.1Division E.3.1
- E.3.2Sensitivity analysis
- E.3.3Risk assessment
- E.3.4Additional assessments carried out, if applicable
- AN ANALYSIS OF THE ENVIRONMENTAL IMPACT, TAKING INTO ACCOUNT CLIMATE CHANGE ADAPTATION AND MITIGATION NEEDS, AND DISASTER RESILIENCE
- Consistency of the project with environmental policy
- F.1.1Division F.1.1
- F.1.2Division F.1.2
- Application of Directive 2001/42/EC of the European Parliament and of the Council (the ‘SEA Directive’)
- F.2.1Division F.2.1
- F.2.2Division F.2.2
- Application of Directive 2011/92/EU of the European Parliament and of the Council (the ‘EIA Directive’)
- F.3.1Division F.3.1
- F.3.2Division F.3.2
- F.3.3Division F.3.3
- F.3.4Division F.3.4
- Development consent/construction permit (as applicable)
- F.3.5.1Division F.3.5.1
- F.3.5.2Division F.3.5.2
- F.3.5.3Division F.3.5.3
- F.3.5.4Division F.3.5.4
- F.3.5.5Division F.3.5.5
- F.3.5.6Division F.3.5.6
- F.3.5.7Division F.3.5.7
- Application of the Directive 92/43/EEC on the conservation of natural habitats and of wild fauna and flora (Habitats Directive); assessment of effects on Natura 2000 sites
- F.4.1Division F.4.1
- F.4.2Division F.4.2
- F.4.3Division F.4.3
- Application of Directive 2000/60/EC of the European Parliament and of the Council (the ‘Water Framework Directive’); assessment of effects on water bodies
- F.5.1Division F.5.1
- F.5.2Division F.5.2
- F.5.2.1Division F.5.2.1
- F.5.2.2Division F.5.2.2
- F.5.3Division F.5.3
- Where applicable, information on compliance with other environmental directives
- F.6.1Application of Council Directive 91/271/EEC (the ‘UWWT Directive’) — projects in urban waste water sector
- Application of Directive 2008/98/EC of the European Parliament and of the Council (the ‘Waste Framework Directive’) — projects in waste management sector
- F.6.2.1Division F.6.2.1
- F.6.2.2Division F.6.2.2
- F.6.3Application of Directive 2010/75/EU of the European Parliament and of the Council (the ‘Industrial Emissions Directive’) — Projects requiring the granting of a permit under that Directive
- F.6.4Any other relevant environmental directives (please explain below)
- Cost of measures taken to mitigate and/or compensate negative environmental impacts, in particular resulting from the EIA procedure or other assessment procedures (such as the Habitats Directive, the Water Framework Directive, the Industrial Emissions Directive) or national/regional requirements
- F.7.1Division F.7.1
- F.7.2Division F.7.2
- Climate change adaptation and mitigation, and disaster resilience
- F.8.1Division F.8.1
- F.8.2Division F.8.2
- F.8.3Division F.8.3
- THE FINANCING PLAN SHOWING THE TOTAL PLANNED FINANCING RESOURCES AND THE PLANNED SUPPORT FROM THE FUNDS, THE EIB, AND ALL OTHER SOURCES OF FINAnCING, TOGETHER WITH PHYSICAL AND FINANCIAL INDICATORS FOR MONITORING PROGRESS, TAKING ACCOUNT OF THE IDENTIFIED RISKS
- Total planned financial resources and planned support from the Funds, the EIB, and all other sources of financing
- G.1.1Sources of co-financing
- G.1.2Annual plan of total eligible expenditure to be declared to the Commission (financial indicator for monitoring progress)
- Other Union financing sources
- G.1.3.1Division G.1.3.1
- G.1.3.2Division G.1.3.2
- G.1.3.3Division G.1.3.3
- G.1.3.4Division G.1.3.4
- G.1.4Division G.1.4
- G.1.5Division G.1.5
- G.1.6Impact of Union assistance on project implementation
- G.2Output indicators and physical indicators for monitoring progress
- G.3Risk assessment
- HTHE TIMETABLE FOR IMPLEMENTING THE MAJOR PROJECT
- H.1Project timetable
- H.2Project maturity
- H.2.1Technical (feasibility studies, project design etc.):
- H.2.2Administrative with a minimum reference to necessary authorisations such as EIA, development consent, territorial/planning decisions, land purchase (if relevant), public procurement etc.:
- H.2.3Public procurement:
- H.2.4Financial (commitment decisions in respect of national public expenditure, loans requested or granted, etc. — give references):
- H.2.5If the project has already started, indicate the current state of implementation:
- IIS THE PROJECT SUBJECT TO A LEGAL PROCEDURE FOR NON-COMPLIANCE WITH UNION LAW? <type='C' input='M'>
- JHAS THE UNDERTAKING PREVIOUSLY BEEN, OR IS IT CURRENTLY, SUBJECT OF A PROCEDURE TO RECOVER UNION SUPPORT FOLLOWING THE RELOCATION OF A PRODUCTIVE ACTIVITY OUTSIDE THE PROGRAMME AREA? <type='C' input='M'>
- INVOLVEMENT OF JASPERS IN PROJECT PREPARATION
- K.1Division K.1
- K.2Division K.2
- STATUS OF THE PROJECT IN RELATION TO ARTICLE 102 OF REGULATION (EU) No 1303/2013
- L.1Division L.1
- MSUMMARY OF REVISIONS TO THE APPLICATION FORM IN CASE THE MAJOR PROJECT IS SUBJECT TO MODIFICATION
- NENDORSEMENT OF COMPETENT NATIONAL AUTHORITY
- 1Appendix 1
- 2Appendix 2
- 3Appendix 3
- 4FEASIBILITY STUDIES (OR BUSINESS PLAN IF PRODUCTIVE INVESTMENT) AND COST-BENEFIT ANALYSIS (AS REQUIRED IN D AND E)
- 5MAP IDENTIFYING THE PROJECT AREA AND GEO-REFERENCED DATA (AS REQUIRED IN B.3.1)
- 6DOCUMENTATION REQUIRED IN F.3.3
- Annex III: Methodology for carrying out the cost-benefit analysis
- GENERAL PRINCIPLES
- 1.1Division 1.1
- 1.2Division 1.2
- 1.3Division 1.3
- 1.4Division 1.4
- ELEMENTS OF THE COST BENEFIT ANALYSIS
- Presentation of the context and definition of objectives, identification of the project, feasibility of the project with demand and option analysis
- 2.1.1Presentation of the context
- 2.1.2Definition of project's objectives
- 2.1.3Identification of the project
- 2.1.4Feasibility of the project with demand and option analysis
- 2.2Financial analysis
- 2.2.1Discounted cash flow methodology, incremental method and other principles of financial analysis
- Results of the financial analysis
- (a)Evaluation of financial profitability of the investment and national capital
- For a project to require the contribution of the Funds:
- For a project to require the contribution of the Funds:
- (b)Determination of the appropriate (maximum) contribution from the Funds
- (c)Ensuring financial viability (sustainability)
- 2.2.3Financial analysis in Public Private Partnership (PPP)
- 2.3Economic analysis
- 2.3.1Key steps of economic analysis
- 2.3.2Calculation of the economic performance indicators
- 2.3.3Climate change mitigation and adaptation in the economic analysis
- 2.3.4Simplified economic analysis in special cases
- 2.4Risk assessment
- Formulas
- Formulas for financial analysis:
- —Financial net present value (FNPV)
- —Financial rate of return (FRR)
- Formulas for economic analysis
- —Economic Net Present Value (ENPV)
- —Economic rate of return (ERR)
- —Benefit/Cost ratio (B/C)
- Annex IVFormat of the model for the joint action plan (JAP)
- AGENERAL CHARACTERISTICS
- A.9Categorisation of operation activity
- BCONTACT DETAILS: Authority responsible for the JAP application [to be completed by the authority submitting the application]
- OBJECTIVES OF THE JAP
- C.1Division C.1
- C.2Division C.2
- C.3Division C.3 Repealed
- C.4Division C.4
- DESCRIPTION OF THE JAP
- D.1Division D.1
- D.1.1Division D.1.1
- D.1.2Division D.1.2
- D.1.3Division D.1.3
- D.2Division D.2
- D.3Division D.3 Repealed
- GEOGRAPHIC COVERAGE AND TARGET GROUP(S)
- E.1Geographic coverage of the JAP. Where relevant, please justify why the JAP is concentrated in a specific area
- E.2Target group(s) of the JAP
- E.2.3Division E.2.3
- FEXPECTED IMPLEMENTATION PERIOD OF THE JAP
- GCONTRIBUTION OF THE JAP TO HORIZONTAL PRINCIPLES
- G.1The promotion of equality between men and women
- G.2On the prevention of discrimination
- G.3The promotion of sustainable development
- IMPLEMENTING PROVISIONS FOR THE JAP
- Beneficiary of the JAP.
- H.1.1Contact Details
- H.1.2Division H.1.2
- H.1.2.1Division H.1.2.1 Repealed
- H.1.2.2Division H.1.2.2 Repealed
- Arrangements for steering the JAP
- H.2.1Division H.2.1
- Arrangements for monitoring and evaluating the JAP
- H.3.1Division H.3.1
- H.3.2Division H.3.2
- H.4Arrangements ensuring the dissemination of information and communication in relation to the JAP and to the Funds supporting the JAP Repealed
- FINANCIAL ARRANGEMENTS OF THE JAP
- I.1Costs of achieving milestones, and targets for outputs and results (please also complete the appendix on indicators).
- I.1.1Output indicators
- I.1.2Result indicators
- I.1.3Financial flexibility: please explain if financial flexibility is required and how it will be applied
- I.2Indicative schedule of payments to the beneficiary, linked to the milestones and targets: please provide an indicative overview of the expected payments to every JAP (type of) project (in EUR), based on the information provided in table D.1.3 and section I.1 Repealed
- I.3Financing plan by operational programme and priority axis (and Fund and category of region where relevant)
- Appendix
- Annex V: Model for the annual and final implementation reports for the Investment for growth and jobs goal
- DATA REQUIRED EVERY YEAR (‘LIGHT REPORTS’) (Article 50(2) of Regulation (EU) No 1303/2013)
- 1IDENTIFICATION OF THE ANNUAL/FINAL IMPLEMENTATION REPORT
- 2OVERVIEW OF THE IMPLEMENTATION OF THE OPERATIONAL PROGRAMME (Article 50(2) and 111(3)(a) of Regulation (EU) No 1303/2013)
- IMPLEMENTATION OF THE PRIORITY AXIS (Article 50(2) of Regulation (EU) No 1303/2013)
- 3.1Overview of the implementation
- 3.2Common and programme specific indicators (Article 50(2) of Regulation (EU) No 1303/2013)
- 3.3Milestones and targets defined in the performance framework (Article 50(2) of Regulation (EU) No 1303/2013) — submitted in annual implementation reports from 2017 onwards
- 3.4Financial data (Article 50(2) of Regulation (EU) No 1303/2013)
- Table 6
- Table 7
- 4SYNTHESIS OF THE EVALUATIONS (Article 50(2) of Regulation (EU) No 1303/2013)
- 5INFORMATION ON THE IMPLEMENTATION OF THE YOUTH EMPLOYMENT INITIATIVE, WHERE APPLICABLE (Article 19(2) and 19(4) of Regulation (EU) No 1304/2013)
- 6ISSUES AFFECTING THE PERFORMANCE OF THE PROGRAMME AND MEASURES TAKEN (Article 50(2) of Regulation (EU) No 1303/2013)
- 7CITIZEN'S SUMMARY (Article 50(9) of Regulation (EU) No 1303/2013)
- 8REPORT ON THE IMPLEMENTATION OF FINANCIAL INSTRUMENTS (Article 46 of Regulation (EU) No 1303/2013)
- Optional for the report to be submitted in 2016, not applicable to other light reports: ACTIONS TAKEN TO FULFILL EX-ANTE CONDITIONALITIES (Article 50(2) of Regulation (EU) No 1303/2013) in case applicable ex-ante conditionalities were not fulfilled upon the adoption of the OP: (see point 13 of the model)
- PROGRESS IN PREPARATION AND IMPLEMENTATION OF MAJOR PROJECTS AND JOINT ACTION PLANS (Article 101(h) and 111(3) of Regulation (EU) No 1303/2013)
- 10.1Major projects
- 10.2Joint action plans
- REPORTING SUBMITTED IN YEARS 2017, 2019 AND FINAL IMPLEMENTATION REPORT
- ASSESSMENT OF THE IMPLEMENTATION OF THE OPERATIONAL PROGRAMME (Articles 50(4) and 111(4) of Regulation (EU) No 1303/2013)
- 11.1Information in Part A and achieving objectives of the programme (Article 50(4) of Regulation (EU) No 1303/2013)
- 11.2Specific actions taken to promote equality between men and women and to prevent discrimination, in particular accessibility for persons with disabilities, and the arrangements implemented to ensure the integration of the gender perspective in the operational programme and operations (Articles 50(4) and 111(4), second subparagraph, (e) of Regulation (EU) No 1303/2013)
- 11.3Sustainable development (Articles 50(4) and 111(4), second subparagraph, (f) of Regulation (EU) No 1303/2013)
- Reporting on support used for climate change objectives (Article 50(4) of Regulation (EU) No 1303/2013)
- Division
- 11.5Role of partners in the implementation of the programme (Articles 50(4) and 111(4), first subparagraph, (c) of Regulation (EU) No 1303/2013)
- OBLIGATORY INFORMATION AND ASSESSMENT ACCORDING TO ARTICLE 111(4), FIRST SUBPARAGRAPH, (a) AND (b), OF REGULATION (EU) No 1303/2013
- 12.1Progress in implementation of the evaluation plan and the follow-up given to the findings of evaluations
- 12.2The results of the information and publicity measures of the Funds carried out under the communication strategy
- 13ACTIONS TAKEN TO FULFILL EX-ANTE CONDITIONALITIES (Article 50(4) of Regulation (EU) No 1303/2013) (May be included in report to be submitted in 2016 (see point 9 above). Required in report submitted in 2017) Option: progress report
- ADDITIONAL INFORMATION WHICH MAY BE ADDED DEPENDING ON THE CONTENT AND OBJECTIVES OF THE OPERATIONAL PROGRAMME (Article 111(4), second subparagraph, (a), (b), (c), (d), (g) and (h), of Regulation (EU) No 1303/2013)
- Progress in the implementation of the integrated approach to territorial development, including development of regions facing demographic challenges and permanent or natural handicaps, integrated territorial investments, sustainable urban development, and community led local development under the operational programme
- Division
- Progress in the implementation of actions to reinforce the capacity of Member State authorities and beneficiaries to administer and use the Funds
- Division
- Progress in the implementation of any interregional and transnational actions
- Division
- 14.4Where appropriate, the contribution to macro-regional and sea basin strategies.
- 14.5Progress in the implementation of actions in the field of social innovation, where appropriate
- Progress in the implementation of measures to address the specific needs of geographical areas most affected by poverty or of target groups at highest risk of poverty discrimination or social exclusion, with special regard to marginalised communities and persons with disabilities, long term unemployment and young people not in employment including, where appropriate, the financial resources used
- Division
- REPORTING SUBMITTED IN YEAR 2019 AND FINAL IMPLEMENTATION REPORT (Article 50(5) of Regulation (EU) No 1303/2013)
- 15FINANCIAL INFORMATION AT PRIORITY AXIS AND PROGRAMME LEVEL (Articles 21(2) and 22(7) of Regulation (EU) No 1303/2013)
- REPORTING SUBMITTED IN YEAR 2019 AND FINAL IMPLEMENTATION REPORT (Article 50(5) of Regulation (EU) No 1303/2013)
- 16SMART, SUSTAINABLE AND INCLUSIVE GROWTH (option progress report)
- 17ISSUES AFFECTING THE PERFORMANCE OF THE PROGRAMME AND MEASURES TAKEN — PERFORMANCE FRAMEWORK (Article 50(2) of Regulation (EU) No 1303/2013)
- 18YOUTH EMPLOYMENT INITIATIVE (Article 19(4) and (6) of Regulation (EU) No 1304/2013 (where applicable))
- Annex VIModel for the management declaration
- Annex VII: Model for the audit strategy
- 1INTRODUCTION
- 2RISK ASSESSMENT
- 3METHODOLOGY
- 3.1Overview
- 3.2Audits on the functioning of management and control systems (system audits)
- 3.3Audits of operations
- 3.4Audits of the accounts
- 3.5Verification of the management declaration
- 4AUDIT WORK PLANNED
- 5RESOURCES
- Annex VIIIModel for the audit opinion
- 1INTRODUCTION
- 2RESPONSIBILITIES OF THE MANAGING AND CERTIFYING AUTHORITIES
- 3RESPONSIBILITIES OF THE AUDIT AUTHORITY
- SCOPE LIMITATION
- Either
- Or
- 5OPINION
- Either(Unqualified opinion)
- Or(Qualified opinion)
- Or(Adverse opinion)
- Annex IX: Model for the annual control report
- 1INTRODUCTION
- 2SIGNIFICANT CHANGES IN MANAGEMENT AND CONTROL SYSTEM(S)
- 3CHANGES TO THE AUDIT STRATEGY
- 4SYSTEM AUDITS
- 5AUDITS OF OPERATIONS
- 6AUDITS OF ACCOUNTS
- 7COORDINATION BETWEEN AUDIT BODIES AND SUPERVISORY WORK BY THE AUDIT AUTHORITY (where applicable)
- 8OTHER INFORMATION
- 9OVERALL LEVEL OF ASSURANCE
- ANNEXES TO THE ANNUAL CONTROL REPORT
- 10.1Results of systems audits
- 10.2Results of audit of operations
- Calculations underlying the random sample selection and the total error rate
- Annex X: Model for the implementation reports for the European territorial cooperation goal
- DATA REQUIRED EVERY YEAR (‘LIGHT REPORTS’) (Article 50(2) of Regulation (EU) No 1303/2013)
- 1IDENTIFICATION OF THE ANNUAL/FINAL IMPLEMENTATION REPORT
- 2OVERVIEW OF THE IMPLEMENTATION OF THE COOPERATION PROGRAMME (Article 50(2) of Regulation (EU) No 1303/2013 and Article 14(3)(a) of Regulation (EU) No 1299/2013)
- IMPLEMENTATION OF THE PRIORITY AXIS (Article 50(2) of Regulation (EU) No 1303/2013)
- 3.1Overview of the implementation
- 3.2Common and programme specific indicators (Article 50(2) of Regulation (EU) No 1303/2013)
- 3.3Milestones and targets defined in the performance framework (Article 50(2) of Regulation (EU) No 1303/2013) — submitted in annual implementation reports from 2017 onwards
- Financial data (Article 50(2) of Regulation (EU) No 1303/2013)
- Table 4
- Table 5
- 4SYNTHESIS OF THE EVALUATIONS (Article 50(2) of Regulation (EU) No 1303/2013)
- 5ISSUES AFFECTING THE PERFORMANCE OF THE PROGRAMME AND MEASURES TAKEN (article 50(2) of Regulation (EU) No 1303/2013)
- 6CITIZEN'S SUMMARY (Article 50(9) of Regulation (EU) No 1303/2013)
- 7REPORT ON THE IMPLEMENTATION OF FINANCIAL INSTRUMENTS (Article 46 of Regulation (EU) No 1303/2013)
- WHERE APPROPRIATE, PROGRESS IN PREPARATION AND IMPLEMENTATION OF MAJOR PROJECTS AND JOINT ACTION PLANS (Article 101(h) and Article 111(3) of Regulation (EU) No 1303/2013 and Article 14(3)(b) of Regulation (EU) No 1299/2013)
- 8.1Major projects
- 8.2Joint action plans
- REPORTING SUBMITTED IN YEARS 2017, 2019 AND FINAL IMPLEMENTATION REPORT (Article 50(4) of Regulation (EU) No 1303/2013 and Article 14(4) of Regulation (EU) No 1299/2013)
- ASSESSMENT OF THE IMPLEMENTATION OF THE COOPERATION PROGRAMME (Article 50(4) of Regulation (EU) No 1303/2013 and Article 14(4) of Regulation (EU) No 1299/2013)
- 9.1Information in Part A and achieving the objectives of the programme (Article 50(4) of Regulation (EU) No 1303/2013)
- 9.2Specific actions taken to promote equality between men and women and to promote non-discrimination, in particular accessibility for persons with disabilities, and the arrangements implemented to ensure the integration of the gender perspective in the cooperation programme and operations (Article 50(4) of Regulation (EU) No 1303/2013 and Article 14(4), subparagraph 2, (d) of Regulation (EU) No 1299/2013)
- 9.3Sustainable development (Article 50(4) of Regulation (EU) No 1303/2013 and Article 14(4), subparagraph 2, (e) of Regulation (EU) No 1299/2013)
- 9.4Reporting on support used for climate change objectives (Article 50(4) of Regulation (EU) No 1303/2013)
- 9.5Role of partners in the implementation of the cooperation programme (Article 50(4) of Regulation (EU) No 1303/2013 and Article 14(4), subparagraph 1, (c) of Regulation (EU) No 1299/2013)
- OBLIGATORY INFORMATION AND ASSESSMENT ACCORDING TO ARTICLE 14(4), SUBPARAGRAPH 1 (a) AND (b), OF REGULATION (EU) No 1299/2013
- 10.1Progress in implementation of the evaluation plan and the follow-up given to the findings of evaluations
- 10.2The results of the information and publicity measures of the Funds carried out under the communication strategy
- ADDITIONAL INFORMATION WHICH MAY BE ADDED DEPENDING ON THE CONTENT AND OBJECTIVES OF THE COOPERATION PROGRAMME (Article 14(4), subparagraph 2 (a), (b), (c) and (f), of Regulation (EU) No 1299/2013)
- 11.1Progress in the implementation of the integrated approach to territorial development, including integrated territorial investments, sustainable urban development, and community led local development under the cooperation programme
- 11.2Progress in implementation of actions to reinforce the capacity of authorities and beneficiaries to administer and to use the ERDF
- 11.3Contribution to macro-regional and sea basin strategies (where appropriate)
- 11.4Progress in the implementation of actions in the field of social innovation
- 12FINANCIAL INFORMATION AT PRIORITY AXIS AND PROGRAMME LEVEL (Articles 21(2) and 22(7) of Regulation (EU) No 1303/2013)
- REPORTING SUBMITTED IN YEAR 2019 AND FINAL IMPLEMENTATION REPORT (Article 50(5) of Regulation (EU) No 1303/2013)
- 13SMART, SUSTAINABLE AND INCLUSIVE GROWTH
- 14ISSUES AFFECTING THE PERFORMANCE OF THE PROGRAMME AND MEASURES TAKEN — PERFORMANCE FRAMEWORK (Article 50(2) of Regulation (EU) No 1303/2013)