Division I.3 Financing plan by operational programme and priority axis (and Fund and category of region where relevant)
United Kingdom
| OP | Priority axis | Fund | Category of region | Total eligible expenditure(national currency) | Public expenditure(national currency) | Total eligible expenditure(EUR) | Public expenditure(EUR) | |
|---|---|---|---|---|---|---|---|---|
| (Type of) Project 1 <type='S' input='G'> | <type='S' input='G'> | <type='S' input='G'> | <type='S' input='G'> | <type='S' input='G'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> |
| (Type of) Project 2 | ||||||||
| (Type of) Project 3 | ||||||||
| Total | <type='N' input='G'> | <type='N' input='G'> | <type='N' input='G'> | <type='N' input='G'> |
The total of ‘total eligible expenditure’ shall be equal to the sum of ‘total eligible expenditure’ from tables I.1.1 and I.1.2.
Where applicable, the difference between total eligible expenditure and public expenditure corresponds to the private contribution to the JAP.
Notes on Annex IV
Footnotes
- f1
-
Legend for the characteristics of fields:
-
type: N = Number, D = Date, S = String, C = Checkbox, P = Percentage
-
input: M = Manual, S = Selection, G = Generated by system
-
maxlength = Maximum number of characters including spaces
-