Division 2.1.1 Symbols
United Kingdom
- 2.1.1.1.
‘p1’ represents the maximum system operational pressure (cut-out pressure) in the energy storage devices specified by the manufacturer.
- 2.1.1.2.
‘p2’ represents the pressure after four full-stroke actuations with the service braking system control device, starting at p1, without having fed the energy storage devices.
- 2.1.1.3.
‘t’ represents the time required for the pressure to rise from p2 to p1 in the energy storage devices without application of the service braking system control device.