Division 2.3.3 Conditions of measurement
United Kingdom
During the test to determine the time tR the following requirements shall be satisfied:
- 2.3.3.1.
The pressure in the energy storage device at the beginning of the test shall be the pressure ‘pR1’.
- 2.3.3.2.
The service braking system shall be operated four times by the control line of the tractor simulator.
- 2.3.3.3.
At each brake application, the pressure in the control line shall be 13 300 kPa.
- 2.3.3.4.
Energy storage devices for auxiliary equipment shall not be isolated other than automatically.
- 2.3.3.5.
The valve feeding the energy storage device by the pressure of the control line shall be closed during the test.