Annex III Voltage ranges referred to in Article 18
United Kingdom
| Synchronous Area | Voltage Range | Time period for operation |
|---|---|---|
| F1. . . | . . . | . . . |
| . . . | . . . | |
| F2. . . | . . . | . . . |
| . . . | . . . | |
| Great Britain | F30.90 pu-F41.10 pu | Unlimited |
| F5. . . | . . . | . . . |
| F6. . . | . . . | . . . |
| . . . | . . . |
Table 4: Minimum time periods an HVDC system shall be capable of operating for voltages deviating from the reference 1 pu value at the connection points without disconnecting from the network. This table applies in case of pu voltage base values at or above 110 kV and up to (not including) 300 kV.
| Synchronous Area | Voltage Range | Time period for operation |
|---|---|---|
| F7. . . | . . . | . . . |
| . . . | . . . | |
| . . . | . . . | |
| F8. . . | . . . | . . . |
| . . . | . . . | |
| Great Britain | F90.90 pu-F101.05 pu | Unlimited |
| 1.05 pu-F111.10 pu | 15 minutes | |
| F12. . . | . . . | . . . |
| F13. . . | . . . | . . . |
| . . . | . . . |
Table 5: Minimum time periods an HVDC system shall be capable of operating for voltages deviating from the reference 1 pu value at the connection points without disconnecting from the network. This table applies in case of pu voltage base values from 300 kV to 400 kV (included).
Annotations
Textual amendments
- F1
Words in Annex 3 omitted (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(2)(a)
- F2
Words in Annex 3 omitted (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(2)(b)
- F3
Word in Annex 3 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(2)(c)(i)
- F4
Word in Annex 3 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(2)(c)(ii)
- F5
Words in Annex 3 omitted (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(2)(d)
- F6
Words in Annex 3 omitted (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(2)(e)
- F7
Words in Annex 3 omitted (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(3)(a)
- F8
Words in Annex 3 omitted (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(3)(b)
- F9
Word in Annex 3 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(3)(c)(i)
- F10
Word in Annex 3 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(3)(c)(ii)
- F11
Word in Annex 3 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(3)(c)(iii)
- F12
Words in Annex 3 omitted (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(3)(d)
- F13
Words in Annex 3 omitted (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 37(3)(e)