Commission Regulation (EU) 2016/1447
of 26 August 2016
establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003f1, and in particular Article 6(11) thereof,
Whereas:
(1)
The swift completion of a fully functioning and interconnected internal energy market is crucial to maintaining security of energy supply, increasing competitiveness and ensuring that all consumers can purchase energy at affordable prices.
(2)
Regulation (EC) No 714/2009 sets out non-discriminatory rules governing access to the network for cross-border exchanges in electricity with a view to ensuring the proper functioning of the internal market in electricity. In addition Article 5 of Directive 2009/72/EC of the European Parliament and of the Councilf2 requires that Member States or, where Member States have so provided, regulatory authorities ensure, inter alia, that objective and non-discriminatory technical rules are developed which establish minimum technical design and operational requirements for the connection to the system. Where requirements constitute terms and conditions for connection to national networks, Article 37(6) of the same Directive requires regulatory authorities to be responsible for fixing or approving at least the methodologies used to calculate or establish them. In order to provide system security within the interconnected transmission system, it is essential to establish a common understanding of the requirements for High-Voltage Direct Current (HVDC) systems and direct current-connected power park modules (DC-connected power park modules). Those requirements that contribute to maintaining, preserving and restoring system security in order to facilitate proper functioning of the internal electricity market within and between synchronous areas, and to achieve cost efficiencies, should be regarded as cross-border network issues and market integration issues.
(3)
Harmonised rules for grid connection for HVDC systems and DC-connected power park modules should be set out in order to provide a clear legal framework for grid connections, facilitate Union-wide trade in electricity, ensure system security, facilitate the integration of renewable electricity sources, increase competition and allow more efficient use of the network and resources, for the benefit of consumers.
(4)
System security depends partly on the technical capabilities of HVDC systems and DC-connected power park modules. Therefore regular coordination at the level of the transmission and distribution networks and adequate performance of the equipment connected to the transmission and distribution networks with sufficient robustness to cope with disturbances and to help to prevent any major disruption or to facilitate restoration of the system after a collapse are fundamental prerequisites.
(5)
Secure system operation is only possible if there is close cooperation between owners of HVDC systems and DC-connected power park modules and system operators. In particular, the functioning of the system under abnormal operating conditions depends on the response of the HVDC systems and DC-connected power park modules to deviations from the reference 1 per unit (pu) values of voltage and nominal frequency. In the context of system security, the networks and the HVDC systems and DC-connected power park modules should be considered as one entity from a system engineering point of view, given that those parts are interdependent. Therefore, as a prerequisite for grid connection, relevant technical requirements should be set for HVDC systems and DC-connected power park modules.
(6)
Regulatory authorities should consider the reasonable costs effectively incurred by system operators in the implementation of this Regulation when fixing or approving transmission or distribution tariffs or their methodologies or when approving the terms and conditions for connection and access to national networks in accordance with Article 37(1) and (6) of Directive 2009/72/EC and with Article 14 of Regulation (EC) No 714/2009.
(7)
Different synchronous electricity systems in the Union have different characteristics which need to be taken into account when setting the requirements for HVDC systems and DC-connected power park modules. It is therefore appropriate to consider regional specificities when establishing network connection rules as required by Article 8(6) of Regulation (EC) No 714/2009.
(8)
In view of the need to provide regulatory certainty, the requirements of this Regulation should apply to new HVDC systems and new DC-connected power park modules but should not apply to HVDC systems and DC-connected power park modules already existing or at an advanced stage of planning but not yet completed unless the relevant regulatory authority or Member State decides otherwise based on evolution of system requirements and a full cost-benefit analysis, or where there has been substantial modernisation of those facilities.
(9)
Due to its cross-border impact, this Regulation should aim at the same frequency-related requirements for all voltage levels, at least within a synchronous area. That is necessary because, within a synchronous area, a change in frequency in one Member State would immediately impact frequency and could damage equipment in all other Member States.
(10)
To ensure system security, it should be possible for HVDC systems and DC-connected power park modules in each synchronous area of the interconnected system to remain connected to the system for specified frequency and voltage ranges.
(11)
Voltage ranges should be coordinated between interconnected systems because they are crucial to secure planning and operation of a power system within a synchronous area. Disconnections because of voltage disturbances have an impact on neighbouring systems. Failure to specify voltage ranges could lead to widespread uncertainty in planning and operation of the system with respect to operation beyond normal operating conditions.
(12)
Appropriate and proportionate compliance testing should be introduced so that system operators can ensure operational security. In accordance with Article 37(1)(b) of Directive 2009/72/EC, regulatory authorities are responsible for ensuring that system operators are compliant with this Regulation.
(13)
The regulatory authorities, Member States and system operators should ensure that, in the process of developing and approving the requirements for network connection, they are harmonised to the extent possible, in order to ensure full market integration. Established technical standards should be taken into particular consideration in the development of connection requirements.
(14)
A process for derogating from the rules should be set out in this Regulation to take into account local circumstances where exceptionally, for example, compliance with those rules could jeopardise the stability of the local network or where the safe operation of an HVDC system or DC-connected power park module might require operating conditions that are not in line with this Regulation.
(15)
In the case of DC-connected power park modules, new modules could, in the future form part of a meshed off-shore grid connecting to more than one synchronous area. In this case, certain technical requirements should be set in order to maintain system security and ensure that future meshed networks can be developed cost-effectively. However, for certain requirements, DC-connected power park modules should only be required to fit the equipment needed for system security at the time it becomes necessary.
(16)
Therefore, the owners of DC-connected power park modules which are, or will be, connected to one synchronous area with a radial connection should have the possibility to apply, via an expedited process, for derogations to requirements that will only be needed where the power park modules become connected to a meshed grid and which take account of case-by-case circumstances. They should also be informed as early as possible whether they qualify for a derogation for the purposes of their investment decision-making.
(17)
Subject to approval by the relevant regulatory authority, or other authority where applicable in a Member State, system operators should be allowed to propose derogations for certain classes of HVDC systems and DC-connected power park modules.
(18)
This Regulation has been adopted on the basis of Regulation (EC) No 714/2009 which it supplements and of which it forms an integral part. References to Regulation (EC) No 714/2009 in other legal acts should be understood as also referring to this Regulation.
(19)
The measures provided for in this Regulation are in accordance with the opinion of the Committee referred to in Article 23(1) of Regulation (EC) No 714/2009,
HAS ADOPTED THIS REGULATION:
Annotations to the whole text
Footnotes
- f1
- f2
-
Directive 2009/72/EC of the European Parliament and of the Council of 13 July 2009 concerning common rules for the internal market in electricity and repealing Directive 2003/54/EC (OJ L 211, 14.8.2009, p. 55).
Contents
- Title I: GENERAL PROVISIONS
- 1Subject matter
- 2Definitions
- 3Scope of application
- 4Application to existing HVDC systems and DC-connected power park modules
- 5Regulatory aspects
- 6Multiple TSOs
- 7Recovery of costs
- 8Public consultation
- 9Stakeholder involvement Repealed
- 10Confidentiality obligations
- Title II: GENERAL REQUIREMENTS FOR HVDC CONNECTIONS
- Chapter 1: Requirements for active power control and frequency support
- 11Frequency ranges
- 12Rate-of-change-of-frequency withstand capability
- 13Active power controllability, control range and ramping rate
- 14Synthetic inertia
- 15Requirements relating to frequency sensitive mode, limited frequency sensitive mode overfrequency and limited frequency sensitive mode underfrequency
- 16Frequency control
- 17Maximum loss of active power
- Chapter 2: Requirements for reactive power control and voltage support
- 18Voltage ranges
- 19Short circuit contribution during faults
- 20Reactive power capability
- 21Reactive power exchanged with the network
- 22Reactive power control mode
- 23Priority to active or reactive power contribution
- 24Power quality
- Chapter 3: Requirements for fault ride through capability
- 25Fault ride through capability
- 26Post fault active power recovery
- 27Fast recovery from DC faults
- Chapter 4: Requirements for control
- 28Energisation and synchronisation of HVDC converter stations
- 29Interaction between HVDC systems or other plants and equipment
- 30Power oscillation damping capability
- 31Subsynchronous torsional interaction damping capability
- 32Network characteristics
- 33HVDC system robustness
- Chapter 5: Requirements for protection devices and settings
- 34Electrical protection schemes and settings
- 35Priority ranking of protection and control
- 36Changes to protection and control schemes and settings
- Chapter 6: Requirements for power system restoration
- 37Black start
- Title III: REQUIREMENTS FOR DC-CONNECTED POWER PARK MODULES AND REMOTE-END HVDC CONVERTER STATIONS
- Chapter 1: Requirements for DC-connected power park modules
- 38Scope
- 39Frequency stability requirements
- 40Reactive power and voltage requirements
- 41Control requirements
- 42Network characteristics
- 43Protection requirements
- 44Power quality
- 45General system management requirements applicable to DC-connected power park modules
- Chapter 2: Requirements for remote-end HVDC converter stations
- 46Scope
- 47Frequency stability requirements
- 48Reactive power and voltage requirements
- 49Network characteristics
- 50Power quality
- Title IV: INFORMATION EXCHANGE AND COORDINATION
- 51Operation of HVDC systems
- 52Parameters and settings
- 53Fault recording and monitoring
- 54Simulation models
- Title V: OPERATIONAL NOTIFICATION PROCEDURE FOR CONNECTION
- Chapter 1: Connection of new HVDC systems
- 55General provisions
- 56EON for HVDC systems
- 57ION for HVDC systems
- 58FON for HVDC systems
- 59Limited operational notification for HVDC systems/derogations
- Chapter 2: Connection of new DC-connected power park modules
- 60General provisions
- 61EON for DC-connected power park modules
- 62ION for DC-connected power park modules
- 63FON for DC-connected power park modules
- 64Limited operational notification for DC-connected power park modules
- Chapter 3: Cost benefit analysis
- 65Identification of costs and benefits of application of requirements to existing HVDC systems or DC-connected power park modules
- 66Principles of cost-benefit analysis
- Title VI: COMPLIANCE
- Chapter 1: Compliance monitoring
- 67Common provisions for compliance testing
- 68Common provisions on compliance simulation
- 69Responsibility of the HVDC system owner and DC-connected power park module owner
- 70Tasks of the relevant system operator
- Chapter 2: Compliance testing
- 71Compliance testing for HVDC systems
- 72Compliance testing for DC-connected power park modules and remote-end HVDC converter units
- Chapter 3: Compliance simulations
- 73Compliance simulations for HVDC systems
- 74Compliance simulations for DC-connected power park modules and remote-end HVDC converter units
- Chapter 4: Non-binding guidance and monitoring of implementation Repealed
- 75Non-binding guidance on implementation Repealed
- 76Monitoring Repealed
- Title VII: DEROGATIONS
- 77Power to grant derogations
- 78General provisions
- 79Request for derogations by an HVDC system owner or DC-connected power park module owner
- 80Request for a derogation by a relevant system operator or relevant TSO
- 81Request for derogations from the provisions of Title III by a DC-connected power park module owner
- 82Register of derogations from the requirements of this Regulation
- 83Monitoring of derogations
- Title VIII: FINAL PROVISIONS
- 84Amendment of contracts and general terms and conditions
- 85HVDC System or DC-connected power park modules connecting with synchronous areas or control areas not bound by EU legislation
- 86Entry into force
- Signature
- Annex IFrequency ranges referred to in Article 11
- Annex II: Requirements applying to frequency sensitive mode, limited frequency sensitive mode overfrequency and limited frequency sensitive mode underfrequency
- Frequency sensitive mode
- 1When operating in frequency sensitive mode (FSM):
- BLimited frequency sensitive mode overfrequency
- CLimited frequency sensitive mode underfrequency
- Annex IIIVoltage ranges referred to in Article 18
- Annex IVRequirements for U-Q/Pmax-profile referred to in Article 20
- Annex VVoltage-against-time-profile referred to in Article 25
- Annex VIFrequency ranges and time periods referred to in Article 39(2)(a)
- Annex VIIVoltage ranges and time periods referred to in Article 40
- Annex VIIIReactive power and voltage requirements referred to in Article 48