Annex
United Kingdom
Submission of information on irrecoverable amounts — Food and/or basic material assistance operational programme (OP I)
| Corresponding to the information provided in the accounts, in line with Appendix 4 of Annex V to Implementing Regulation (EU) 2015/341. The reporting shall be by type of material assistance and by operation. | ||||||||||||||||
| The date on which the primary administrative or judicial finding on the irregularity was established. | ||||||||||||||||
| Calculated in accordance with the co-financing rate at the level of the operational programme, as laid down in the financing plan in force at the time of the request. | ||||||||||||||||
| In addition, when applicable, a copy of the document reducing/cancelling the level of support and /or withdrawing the document setting out the conditions for support referred to in Article 32(3)(c) of Regulation (EU) No 223/2014. | ||||||||||||||||
| Indicate whether the reason for irrecoverability is bankruptcy of the beneficiary. If not, indicate the applicable reason. | ||||||||||||||||
| When a request is made that the Union contribution should be borne by the Union budget, the Member State confirms it has exhausted all the recovery possibilities available through its institutional and legal framework. | ||||||||||||||||
| Legend for the characteristics of fields: type: N=Number, D=Date, S=String, Cu=Currency. B = Boolean — input: M=Manual, S=Selection, G=Generated by system — ‘maxlength’ = Maximum number of characters including spaces — ATT: Attachments. | ||||||||||||||||
| a | b | c | d | e | f | g | h | i | j | k | l | m | n | o | p | q |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type of expendituref1 | Name of operation and IT identification number | Name of beneficiary | Date and proof of last payment of public contribution to the beneficiary for the operation concerned | Nature of irregularity (nature to be defined by Member State) | Body which detected the irregularity (indicate which: MA, CA or AA or other, or name of EU body) | Date of detection of irregularityf2 | Total expenditure declared irrecoverable | Public expenditure corresponding to amounts declared irrecoverable | Amount of irrecoverable Union contributionf3 | Accounting year(s) in which the expenditure corresponding to the irrecoverable Union contribution was declared | Date of launch of recovery proceedings | Copy of first and any subsequent recovery ordersf4 | Date of establishment of irrecoverability | Reason for irrecoverabilityf5 | Documents related to bankruptcy procedures, when applicable | Indicate whether the Union contribution should be borne by the Union budget (Y/N)f6 |
| <type="S" maxlength="500" input="S"> | <type="S" maxlength="250" input="M"> f7 | <type="S" maxlength="250" input="M"> | <type="D" input="M"> + <ATT> | <type="S" maxlength="250" input="M"> | <type="S" maxlength="250" input="M"> | <type="D" input="M"> | <type="Cu" input="M"> | <type="Cu" input="M"> | <type="Cu" input="M"> | <type="D" input="S"> | <type="D" input="M"> | <ATT> | <type="D" input="M"> | <type="S" maxlength="500" input="M"> | <ATT> | <type="B" input="M"> |
| Technical Assistance | Op 1 | |||||||||||||||
| Op 2 | ||||||||||||||||
| Sub-total | <type="Cu" input="G"> | <type="Cu" input="G"> | <type="Cu" input="G"> | |||||||||||||
| Type of material assistance 1 | ||||||||||||||||
| Sub-total | <type="Cu" input="G"> | <type="Cu" input="G"> | <type="Cu" input="G"> | |||||||||||||
| Type of material assistance 2 | ||||||||||||||||
| Sub-total | <type="Cu" input="G"> | <type="Cu" input="G"> | <type="Cu" input="G"> | |||||||||||||
| Type of material assistance n | ||||||||||||||||
| Sub-total | <type="Cu" input="G"> | <type="Cu" input="G"> | <type="Cu" input="G"> | |||||||||||||
| Total | <type="Cu" input="G"> | <type="Cu" input="G"> | <type="Cu" input="G"> | |||||||||||||
Submission of information on irrecoverable amounts — Social inclusion of the most deprived persons operational programme (OP II)
| Corresponding to the information provided in the accounts, in line with Appendix 4 of Annex V to Implementing Regulation (EU) 2015/341. The reporting shall be by type of action and by operation. | ||||||||||||||||
| The date on which the primary administrative or judicial finding on the irregularity was established. | ||||||||||||||||
| Calculated in accordance with the co-financing rate at the level of the operational programme, as laid down in the financing plan in force at the time of the request. | ||||||||||||||||
| In addition, when applicable, a copy of the document reducing/cancelling the level of support and /or withdrawing the document setting out the conditions for support referred to in Article 32(3)(c) of Regulation (EU) No 223/2014. | ||||||||||||||||
| Indicate whether the reason for irrecoverability is bankruptcy of the beneficiary. If not, indicate the applicable reason. | ||||||||||||||||
| When a request is made that the Union contribution should be borne by the Union budget, the Member State confirms it has exhausted all the recovery possibilities available through its institutional and legal framework. | ||||||||||||||||
| Legend for the characteristics of fields: type: N=Number, D=Date, S=String, Cu=Currency. B = Boolean — input: M=Manual, S=Selection, G=Generated by system — ‘maxlength’ = Maximum number of characters including spaces — ATT: Attachments. | ||||||||||||||||
| a | b | c | d | e | f | g | h | i | j | k | l | m | n | o | p | q |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type of expendituref8 | Name of operation and IT identification number | Name of beneficiary | Date and proof of last payment of public contribution to the beneficiary for the operation concerned | Nature of irregularity (nature to be defined by Member State) | Body which detected the irregularity (indicate which: MA, CA or AA or other, or name of EU body) | Date of detection of irregularityf9 | Total expenditure declared irrecoverable | Public expenditure corresponding to amounts declared irrecoverable | Amount of irrecoverable Union contributionf10 | Accounting year(s) in which the expenditure corresponding to the irrecoverable Union contribution was declared | Date of launch of recovery proceedings | Copy of first and any subsequent recovery ordersf11 | Date of establishment of irrecoverability | Reason for irrecoverabilityf12 | Documents related to bankruptcy procedures, when applicable | Indicate whether the Union contribution should be borne by the Union budget (Y/N)f13 |
| <type="S" maxlength="500" input="S"> | <type="S" maxlength="250" input="M"> f14 | <type="S" maxlength="250" input="M"> | <type="D" input="M"> + <ATT> | <type="S" maxlength="250" input="M"> | <type="S" maxlength="250" input="M"> | <type="D" input="M"> | <type="Cu" input="M"> | <type="Cu" input="M"> | <type="Cu" input="M"> | <type="D" input="S"> | <type="D" input="M"> | <ATT> | <type="D" input="M"> | <type="S" maxlength="500" input="M"> | <ATT> | <type="B" input="M"> |
| Technical assistance | Op 1 | |||||||||||||||
| Op 2 | ||||||||||||||||
| Sub-total | <type="Cu" input="G"> | <type="Cu" input="G"> | <type="Cu" input="G"> | |||||||||||||
| Type of action 1 | ||||||||||||||||
| Sub-total | <type="Cu" input="G"> | <type="Cu" input="G"> | <type="Cu" input="G"> | |||||||||||||
| Type of action 2 | ||||||||||||||||
| Sub-total | <type="Cu" input="G"> | <type="Cu" input="G"> | <type="Cu" input="G"> | |||||||||||||
| Type of action n | ||||||||||||||||
| Sub-total | <type="Cu" input="G"> | <type="Cu" input="G"> | <type="Cu" input="G"> | |||||||||||||
| Total | <type="Cu" input="G"> | <type="Cu" input="G"> | <type="Cu" input="G"> | |||||||||||||
Annotations
Footnotes
- f1
-
Corresponding to the information provided in the accounts, in line with Appendix 4 of Annex V to Implementing Regulation (EU) 2015/341. The reporting shall be by type of material assistance and by operation.
- f2
-
The date on which the primary administrative or judicial finding on the irregularity was established.
- f3
-
Calculated in accordance with the co-financing rate at the level of the operational programme, as laid down in the financing plan in force at the time of the request.
- f4
-
In addition, when applicable, a copy of the document reducing/cancelling the level of support and /or withdrawing the document setting out the conditions for support referred to in Article 32(3)(c) of Regulation (EU) No 223/2014.
- f5
-
Indicate whether the reason for irrecoverability is bankruptcy of the beneficiary. If not, indicate the applicable reason.
- f6
-
When a request is made that the Union contribution should be borne by the Union budget, the Member State confirms it has exhausted all the recovery possibilities available through its institutional and legal framework.
- f7
-
Legend for the characteristics of fields: type: N=Number, D=Date, S=String, Cu=Currency. B = Boolean — input: M=Manual, S=Selection, G=Generated by system — ‘maxlength’ = Maximum number of characters including spaces — ATT: Attachments.
- f8
-
Corresponding to the information provided in the accounts, in line with Appendix 4 of Annex V to Implementing Regulation (EU) 2015/341. The reporting shall be by type of action and by operation.
- f9
-
The date on which the primary administrative or judicial finding on the irregularity was established.
- f10
-
Calculated in accordance with the co-financing rate at the level of the operational programme, as laid down in the financing plan in force at the time of the request.
- f11
-
In addition, when applicable, a copy of the document reducing/cancelling the level of support and /or withdrawing the document setting out the conditions for support referred to in Article 32(3)(c) of Regulation (EU) No 223/2014.
- f12
-
Indicate whether the reason for irrecoverability is bankruptcy of the beneficiary. If not, indicate the applicable reason.
- f13
-
When a request is made that the Union contribution should be borne by the Union budget, the Member State confirms it has exhausted all the recovery possibilities available through its institutional and legal framework.
- f14
-
Legend for the characteristics of fields: type: N=Number, D=Date, S=String, Cu=Currency. B = Boolean — input: M=Manual, S=Selection, G=Generated by system — ‘maxlength’ = Maximum number of characters including spaces — ATT: Attachments.