OpenLegislation

Division 4.3.1.2 General requirements

Original text. Later amendments are not shown.

  1. 4.3.1.2.1Division 4.3.1.2.1
  2. 4.3.1.2.1.1The sampling probe tip or PSP, and the PTT, together comprise the particle transfer system (PTS). The PTS conducts the sample from the dilution tunnel to the entrance of the VPR. The PTS shall meet the following conditions:
  3. 4.3.1.2.1.2Sample gas drawn through the PTS shall meet the following conditions:
  4. 4.3.1.2.1.3Division 4.3.1.2.1.3
  5. 4.3.1.2.1.4The outlet tube (OT), conducting the diluted sample from the VPR to the inlet of the PNC, shall have the following properties:
  6. 4.3.1.2.1.5Division 4.3.1.2.1.5
  7. 4.3.1.2.2Division 4.3.1.2.2
  8. 4.3.1.2.3Division 4.3.1.2.3
  9. 4.3.1.2.4Division 4.3.1.2.4