Division 3.2.4.3 Charge-depleting Type 1 test procedure
- 3.2.4.3.1Division 3.2.4.3.1
- 3.2.4.3.2During soaking between individual applicable test cycles, the powertrain shall be deactivated and the REESS shall not be recharged from an external electric energy source. The instrumentation for measuring the electric current of all REESSs and for determining the electric voltage of all REESSs according to Appendix 3 of this Sub-Annex shall not be turned off between test cycle phases. In the case of ampere-hour meter measurement, the integration shall remain active throughout the entire test until the test is concluded.
- 3.2.4.3.3Division 3.2.4.3.3