OpenLegislation

Article 189 Information on RR

United Kingdom

Original text. Later amendments are not shown.

1.

All TSOs of each LFC block that operates a reserve replacement process shall F1publish the RR availability requirements specified in accordance with Article 161(2) and the technical requirements for the connection specified in accordance with Article 161(3) for their LFC block available F2... within 3 months before their applicability.

2.

All TSOs of F3the GB synchronous area shall publish, by 30 November of each year, an outlook of the reserve capacities RR of each LFC block for the following year ....

3.

All TSOs of the GB synchronous area shall publish, within 30 days after the end of the quarter, the actual reserve capacities RR of each LFC block of the past quarter ....

Annotations

Textual amendments

F1

Words in art. 189(1)-(3) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 121(2)(a) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F2

Words in art. 189(1)-(3) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 121(2)(b) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F3

Words in Art. 189(2)(3) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 121(3) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)